NR_3_AC_Compressor_and_Motor_Install_and_Operational_testing.pdf
PDF 11 KB Posted
- Attached to
- FCB Nr 3 AC Compressor & Motor Install Federal contract opportunity
- Solicitation number
- N4044616R0630
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sole_Source_Memo.pdf | ||
| COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSC SERVICE ORDER REQUEST
FY16-085
Vessel: USS FRANK CABLE (AS-40) NR 3 A/C Plant (VR15-0115, 0116) Port Engineer: Emil R. Fabrigas SSU GUAM Date: 13 May 2016 Phone 339-5342
1.0 ABSTRACT:
This requirements requires the installation NR 3 AC Compressor and Motor and operational test of NR 3 Air Conditioning Plant.
2.0 REFERENCES/ENCLOSURES:
2.1 Technical Manual 09514-FN-MMA-010 Air Conditioning Plant HFC-236fa 250-Ton Capacity (AS-39 and AS-40)
3.0 ITEM LOCATION/DECRIPTION
3.1 Engine Room (7-110-0-E ) Air Conditioning Plant.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: NONE
5.0 NOTES:
5.1 OEM Rep is to furnish all required tools and special tools for opening and inspection of
NR 1 and 3 Air Conditioning Compressor.
5.2 The ship will furnish Nitrogen and any required refrigerant.
5.3 Ship Force will pump down 3 A/C Plant and drain compressor oil.
5.4 Ship Force will tag out 3 A/C Plant prior to start of work.
6.0 QUALITY ASSURANCE: Nitrogen pressure testing, vacuum test, and operational test in presence of the MSCREP and Chief Engineer.
7.0 STATEMENT OF WORK:
7.1 Provide the services of two (2) each York OEM Service Technician to board USS Frank
Cable (AS-40) from the period of 20 – 31 May 2016 twelve hours per day to conduct installation of NR 3 AC Compressor and Motor and Operational Testing of ” NR 3 Air Conditioning Plant.
7.1.1 York OEM shall install all interferences previously remove.
7.1.2 The following OEM parts below shall be provided by JCI:
Part Description Quantity 872 NMS Evaporator Dehydrator 2 873 NMS PPO dehydrator 2 026 36051 000 Oil Filter Core 4
MSC SERVICE ORDER REQUEST
FY16-085
Vessel: USS FRANK CABLE (AS-40) NR 3 A/C Plant (VR15-0115, 0116) Port Engineer: Emil R. Fabrigas SSU GUAM Date: 13 May 2016 Phone 339-5342
011 00558 000 York “J” oil , 5 Gallon 2 Misc Consumables 1
7.2 Upon completion of installation of NR 3 AC compressor and motor, Contractor shall conduct operational test of NR 3 Air Conditioning plant.
7.3 Known OEM Source:
Johnson Controls Company York Marine Division 4401 23rd Ave. W.
Seattle, WA 98199 POC: Linda Ferrell Linda.Ferrell@jci.com Phone: 206-285-0068 Cell: (206)518-1300
7.4 Perform a joint Ship Force (CHENG) and York Service Technician inspection of NR 3 Air Conditioning plant and provide the MSC Port Engineer with a detailed Condition “As Found” report including parts requirements within 3 days of the start of the performance period noting all compressor conditions and recommendations for repairs.
8.0 GENERAL REQUIREMENTS:
8.1 Period of Performance: 21-31 May 2016
8.2 Location: NBG Sierra Pier 3-4