Statement of work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MEMO_REDACTED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-AKE CLASS
MACHINERY, AUXILIARY SYSTEMS Service Order #: SO-16-003 19 October 2015
MSC//HAZELGROVE/JH
AIR CONDITIONING PLANT OVERHAUL/REPAIR
SO-16-003-1
1.0 ABSTRACT:
1.1 This item describes the requirements to perform the required inspections, repairs, overhaul, and layup of the HVAC Compressor found aboard T-AKE Class ship listed in Para 5.1.
2.0 REFERENCES/ENCLOSURES:
2.1 T9516-BB-MMC-010; Technical Manual for Refrigeration Plant, Air Conditioning for USNS LEWIS AND CLARK (T-AKE 1)
2.2 JCI Technician Report for AC compressor SN 123865
3.0 ITEM LOCATION/QUANTITY/DESCRIPTION:
3.1 Location: IMECO Co. Sweden
3.2 Quantity: 1ea
3.3 DESCRIPTION: York Marine AB VSM89 A/C PLANT, CAPACITY-210 KW
NOMINAL
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: NONE
5.0 NOTES:
5.1 The Contractor and all Subcontractors, regardless of tier, must consult the General Technical Requirements (GTRs) to determine applicability to this work item. In performance of this work item, the Contractor and all Subcontractors, regardless of tier, must comply with the requirements of all applicable GTRs.
6.0 QUALITY ASSURANCE REQUIREMENTS:
6.1 All Inspections, Adjustments, and Servicing shall be performed to O.E.M.
specifications.
7.0 STATEMENT OF WORK:
7.1 Complete an overhaul of #1 compressor using reference 2.1 for guidance. This includes the following:
7.2 Disassemble the compressor using “Disassembly and Assembly Instructions for S85, S87 and S89” document 4848-N-400E (included reference 2.1) for guidance.
7.3 Repair or replace the rotor housing and rotor assembly.
7.4 Replace all associated seals with new.
7.5 Replace all filters, screens, strainers.
7.6 Replace all compressor and motor bearings.
T-AKE CLASS
MACHINERY, AUXILIARY SYSTEMS Service Order #: SO-16-003 19 October 2015
MSC//HAZELGROVE/JH
AIR CONDITIONING PLANT OVERHAUL/REPAIR
SO-16-003-2
7.7 Reassemble compressor using reference 2.1 for guidance.
7.8 After completion of overhaul close up unit, nitrogen charge under layup conditions for approximately 12 months.
7.9 Change the oil using “Service Instructions – General”, Document number GB00532 as guidance (included in reference 2.1)
7.10 Furnish a completion report of findings, itemized list of parts replaced with respective part numbers.
7.11 Notfy Principal Port Engineer James Hazelgrove prior to shipping unit.
(James.hazelgrove@navy.mil)
7.12 Prepare unit for international travel and ship compressor to the following address:
MSC BATS
9284 Balboa Ave San Diego, CA 92123
M/F: USNS LEWIS AND CLARK (T-AKE-1)
POC: Blake NAM/ TEL: 619-553-6053
7.13 Manufacturer's Representative: Work included in this item shall be completed by an authorized representative of YORK Marine AB.
IMECO, Inc. (CAGE 0V369) Kay Pestor; Buyer Phone (Direct): 906-779-3027 IMECO (Office): 906-774-0202 x3027 Fax: 906-774-7029
8.0 GENERAL REQUIREMENTS: None