Composite_Work_Package_N40027-17-B-00005.pdf
PDF 252 KB Posted
- Attached to
- YRBM(L) 43 Berthing Barge Federal contract opportunity
- Solicitation number
- N40027-17-B-0005
About this file
Composite Work Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Request_for_Specification_Clarification_(J2).docx | DOCX document | |
| Non_Skid_CDRLs.pdf | ||
| Solication_N40027-17-B-00005.pdf | ||
| Cost_Data_Breakdown_(J4).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER:
SHIP CHARACTERISTICS
FEET INCHESLENGTH OVERALL
FEET INCHESMAX. BEAM AT DESIGN WATERLINE
FEET INCHESEXTREME BEAM INCLUDING APPENDAGES
FEET INCHESDRAFT (MAX. NAVIGABLE) (FWD.)
FEET INCHESDRAFT (MAX. NAVIGABLE) (AFT.)
LONG TONLIGHT DISPLACEMENT
LONG TONFULL LOAD DISPLACEMENT
INCHESFEETHEIGHT OF MAST ABOVE DESIGN WATERLINE
INCLUDES ALL CHANGES THROUGH 5/16/2017
INDEX
SHIP: YRBM(L) 43 (RMC 40731) SERM-056-17
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-18 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 11/18/2016
009-02 Environmental Compliance Reports for Material Usage at Naval Facility; accomplish 11/18/2016
009-03 Toxic and Hazardous Substance; control 11/18/2016
009-04 Quality Management System; provide 11/18/2016
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
11/18/2016
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 11/18/2016
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 03/07/2017
009-10 Asbestos-Containing Material (ACM); control 11/18/2016
009-18 Magnetic Material; control 03/07/2017
009-19 Provisioning Technical Documentation (PTD); provide 07/30/2015
009-20 Government Property; control 07/18/2014
009-21 Logistics and Technical Data; provide 07/18/2014
009-23 Interference; remove and install 11/18/2016
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 11/18/2016
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 11/18/2016
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
11/18/2016
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
11/18/2016
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
09/01/2015
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 11/18/2016
009-69 Heavy Weather/Mooring Plan; provide 11/18/2016
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
11/18/2016
009-72 Physical Security at a Private Contractor Facility; accomplish 11/18/2016
009-73 Shipboard Electrical/Electronic Cable Procedure; accomplish 11/18/2016
009-74 Occupational, Safety and Health Plan; accomplish 11/18/2016
009-79 Government Owned Material (GOM) Status; report 11/18/2016
009-80 Ship Facilities; maintain 11/18/2016
009-81 Compartment Closeout; accomplish 11/18/2016
009-82 Installation of Equal Component Vice Specified Component; report 11/18/2016
009-89 Contractor Furnished Anode Purchase and Inspection; accomplish 11/18/2016
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
11/18/2016
009-94 General Environmental Work at Contractor Facility; accomplish 11/18/2016
Page 1 of 3 EXECUTING WORK
ITEM_NO. TITLE DATE
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for
Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/17/2013
009-99 Ship Departure Report; provide 07/18/2014
009-100 Ship's Stability; maintain 11/18/2016
009-101 Ship Transit and Berthing; accomplish 11/18/2016
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/18/2014
009-106 Work Authorization Form Coordinator (WAFCOR); provide 11/18/2016
009-108 Aircraft Carrier Transit and Berthing; accomplish 11/18/2016
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 11/18/2016
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
11/18/2016
009-117 Combat Systems, Light-Off; support 11/18/2016
009-118 CG Deck Loading; accomplish 07/18/2014
009-120 Fact Finding and Critique of Unplanned Event; manage 11/18/2016
009-122 Temporary Padeye; install and remove 11/18/2016
Page 2 of 3 EXECUTING WORK
ITEM NO. TITLE
Administrative Purposes; accomplish000-00-001
Nonskid; replace634-11-001
Page 3 of 3 EXECUTING WORK
SHIP: YRBM(L) 43 (RMC 40731) ITEM NO: 000-00-001
COAR: 26 PCN: SERV-L00B
LWT FILE NO: 000-001 CMP: NONE
REVISED: 08 Oct 2016 PLANNER: NUZUM, EDWARD
SSP: SERM-056-17 1 of 1 ITEM NO: 000-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Administrative Purposes; accomplish
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 This work item is written as a repository for reports generated from Standard Items that are not tied to a specific work item.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: YRBM(L) 43 (RMC 40731) ITEM NO: 634-11-001
COAR: 82 PCN: SERV-L008
LWT FILE NO: 634-001 CMP: NONE
REVISED: 27 Dec 2016 PLANNER: NUZUM, EDWARD
SSP: SERM-056-17 1 of 1 ITEM NO: 634-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Nonskid; replace
1.2 Location of Work:
1.2.1 Main Deck Fram (0 to 18)
1.2.2 Vestibule (1-0-0-L)
1.2.3 Vestibule (1-17-0-L)
1.2.4 Vestibule (01-0-0-L)
1.2.5 Vestibule (01-17-0-L)
1.2.6 Vestibule (02-0-0-L)
1.2.7 Vestibule (03-0-0-L
1.2.8 Vestibule (03-17-0-L)
1.2.9 03 level Frame 0 to 18
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 Accomplish the requirements 009-32 of 2.1, including Table 2, Line 12, Columns A, B and E, for steel surfaces, in locations listed in 1.2.
3.1.1 Accomplish the requirements of 009-32 of 2.1 for a top coat of MIL-PRF-23236, Type VII, Class 17, applied at 10 to 12 mils (WHITE).
For area listed in 1.2.9 not receiving Non Skid.
3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.