Errata One
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N40027-16-R-0017-0002.pdf | ||
| Amendment_0001_N40027-16-R-0017.pdf | ||
| HUNTER_024-16_RFP_RELEASE.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: CARRIER STRIKE GROUP 4 (CNRMC 9577)
SERM-024-16
ERRATA NUMBER:
SPECIFICATION NUMBER:
One
THE FOLLOWING ITEMS ARE REPLACED:
321-11-001
512-11-001
DATED: Page 1 of 1
SHIP: CARRIER STRIKE GROUP 4 (CNRMC 9577) ITEM NO: 321-11-001
COAR: 26 PCN: NS02-0061
CSWT FILE NO: 321-001 CMP: NONE
REVISED: 07 Feb 2015 PLANNER: KRIMMER, DAVID
DUBOIS, DANIEL
SSP: SERM-024-16 1 of 2 ITEM NO: 321-11-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Aft Floodlight; relocate
1.2 Location of Work:
1.2.1 Weatherdeck, 01 Level, Portside, Frame 62
1.3 Identification:
1.3.1 Floodlight, Aft Deck, Model: NHIDPS41BNHIDPS4IB, Manufacture:
Pauluhn (E1)
2. REFERENCES:
2.1 Standard Items
2.2 804-5184155, Liferails, Lifelines and Awning Stanchions (Alum and Steel) Details and L/M
2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines
3. REQUIREMENTS:
3.1 Disconnect electrically and mechanically and remove the existing equipment listed in 1.3.1 at the location listed in 1.2.1. Retain for reuse.
3.1.1 Record electrical hook-up data.
3.2 Remove existing and install new extended stanchion for equipment listed in 1.3.1, in accordance with 2.2.
3.2.1 New stanchion shall be manufactured from 3 inch black iron pipe, 40-inch longer than existing. (E1)
3.2.2 Chip and grind surfaces flush in way of removals.
3.2.3 Install new foundation for equipment listed in 1.3.1.
Template from existing conditions and equipment removed in 3.1.
3.2.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.
3.2.5 Install equipment listed in 1.3.1.
3.2.5.1 Install new fasteners and nuts conforming to MIL-DTL- 1222, Type One, Grade 316 CRES, for topside areas exposed to weather and salt spray.
3.2.5.2 Remove existing and install new (15 FT) cable
terminating in the equipment listed in 1.3.1.
3.2.5.3 Accomplish the requirements of 009-22 of 2.1 for cable terminating in the equipment listed in 1.3.1.
3.2.5.4 Connect equipment using recorded hook-up data and in
SSP: SERM-024-16 2 of 2 ITEM NO: 321-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
accordance with 2.3.
(V)(G) "STATIC LOAD TEST"
3.3 Accomplish a static load test of the new extended stanchion in accordance with 2.2.
(V)(G) "OPERATIONAL TEST"
3.4 Accomplish an operational test of disturbed equipment and circuitry to ensure systems and circuits function to designed sequence of operation.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 The purpose of this work item is to relocate the Aft Floodlight 40-inches above existing position. The current position obstructs the view of the crane operator.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: CARRIER STRIKE GROUP 4 (CNRMC 9577) ITEM NO: 512-11-001
COAR: 26 PCN: NS02-0049
CSWT FILE NO: 512-022 CMP: NONE
REVISED: 08 Feb 2015 PLANNER: KRIMMER, DAVID
DUBOIS, DANIEL
SSP: SERM-024-16 1 of 2 ITEM NO: 512-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Vaneaxial Fan; repair
1.2 Location of Work:
1.2.1 Starboard Stack, Main Deck, Frame 22 to Frame 27
1.3 Identification:
1.3.1 Quantity (One EA), Vaneaxial Fan, 450 VAC, 60 Hz, 3-Phase, 20 HP, 25 Amp, Mfr: Reliance, Identified Model on Number Sheet A20A S-14 (of P25G20266)2..2
(E1)
2. REFERENCES:
2.1 Standard Items
2.2 180 X 38 X 13, Supply Vessel, Sheet S-14
2.3 S9512-BX-MMA-010/75477, Vaneaxial Fans (Standard Pressure)
2.4 PM 230-126, SJAX, Ventilation Gasket Material
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-17 of 2.1 for the equipment listed in 1.3.1 using 2.2 through 2.4 for guidance.
3.1.1 Install new gaskets on disturbed ventilation in accordance with 2.4.
3.1.1.1 Install a metal tag with contractor's name, date, and stating "PCB FREE" to all disturbed or new ventilation flanges, access covers, and closures where gaskets are required.
(V)(G) "OPERATIONAL TEST"
3.1.2 Accomplish an operational test of the assembled equipment at full system capacity for one hour after bearing and stator temperatures stabilize within one degree Celsius for 3 consecutive 15-minute intervals.
3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Removed gasket material may contain Polychlorinated Biphenyl (PCB).
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: SERM-024-16 2 of 2 ITEM NO: 512-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
5.3 KITTED MATERIAL: