N3904020Q0169 SOW.pdf
PDF 896 KB Posted
- Attached to
- Dehumidifier Sub Base NLON, Groton CT Federal contract opportunity
- Solicitation number
- N3904020Q0169
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3904020Q0169 RFQ - Amendment 1.pdf | ||
| N3904020Q0169 RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Temporary Dehumidification System
Rev: Orig. Page 1 of 9
STATEMENT OF WORK
1. SCOPE
1.1. PNSY is seeking to lease a Desiccant Climate Controlled Unit (DCCU) system at New London, CT (NLON) to provide dry and tempered process air for conditioning various spaces used for industrial applications. The system must include multiple DCCU’s. A chiller, chilled water pump, chilled water hose manifolds, hose assemblies as well as the associated onboard controls to operate both the chilled water system is not necessary due to the seasonal period of performance, however, the DCCU’s shall have the capacity to accept chilled water should the project be extended into the summer season. Each DCCU must be frame/skid mounted and meet the lifting & handling requirements as defined in the specification. Steam is not available at this location and all equipment is required to operate on electricity for all process air and reactivation air heating.
2. REFERENCES
2.1. Issues of Publications - The following documents of the issue date in effect on the date of request for proposal form a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.
2.1.1. Government
2.1.1.1. General Specification For Integral Lifting Attachment Design
2.1.1.2. US Federal standard A-A-59326: Standard for cam action couplings.
1.1.1. Nongovernment
1.1.1.1. ARI Standard 410
1.1.1.2. ASHRAE: Handbook of Fundamentals
1.2. Order of precedence - In the event of conflict between the text of this specification and that of the references cited above, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained.
3. TECHNICAL REQUIREMENTS
3.1. Component List- The vendor is required to bid on a single equipment list, 3.1.1 or Equipment Alternate 3.1.2.
3.1.1. Required components are listed below based on 2 DCCU’s at 10,000 CFM each.
PIECE
NO.
QTY. NAME OF PART PARA NO.
DH-01 1 DCCU: 10,000 CFM 3.2.1
DH-02 1 DCCU: 10,000 CFM 3.2.1
3.1.2. Equipment Alternate: Components are listed below based on the vendor’s option of supplying 1 DCCU at 15,000 CFM each.
PIECE
NO.
QTY. NAME OF PART PARA NO.
DH-01 1 DCCU: 15,000 CFM 3.2.2
Rev: Orig. Page 2 of 9
3.2. Desiccant Climate Controlled Unit (DCCU)
3.2.1. 10,000 CFM DCCU
Physical Attributes
3.2.1.1. Physical Attributes: Dimensions 20’10” x 7’4” x 9’3” [L x W x H] Weight: 16,450 Lbs.
3.2.1.2. All Components much be fully integrated within single housing.
3.2.1.3. Electrical Power Requirements: 2 Circuits at [460 Volt AC / 3 Phase / 400A] each
3.2.1.4. Process air outlets: Quantity of two at 20” Dia. Each
3.2.1.5. Process air returns: Quantity of two at 20” Dia. Each
3.2.1.6. Pre Cooling Coil male & female 4 IN diameter Fittings. Water inlet and outlet connection fittings must be quick disconnect style fittings meeting the requirements defined in reference 2.1.1.2
3.2.1.7. Post Cooling Coil male & female 3 IN diameter Fittings. Water inlet and outlet connection fittings must be quick disconnect style fittings meeting the requirements defined in reference 2.1.1.2.
3.2.1.8. Pre and post chilled water coils must have manual air bleed valves to assist with the initial filling the chilled water loop.
Process Air Requirements
3.2.1.9. Process Air Flow requirements: 10,000 CFM @ 12 inches External Static Pressure
3.2.1.10. Process Air Fan: Fan curve capable of delivering specified flow and pressure, installed with TEFC Premium Motors, and VFD controlled
3.2.1.11. Total Cooling capacity: 70 Tons Nominal
3.2.1.12. Moisture Removal Rate: 515 Lbs./Hr Total [ Pre-Coiling Coil 218 Lbs./Hr] [Desiccant Wheel 297 Lbs./Hr]
3.2.1.13. Moisture Removal Rate Basis: [84°F EDB / 73.5°F EWB & 75°F LDB / 17% RH]
3.2.1.14. Post Heater requirements: 232 KW Electric heating element, thermostatically controlled to discharge air temperature set point.
3.2.1.15. Pre Cooling Requirement: 42.8 Tons = 103 GPM @ 10°F ΔT, based on 45°F entering chilled water temperature.
3.2.1.16. Post Cooling Requirement: 24.6 Tons = 59 GPM @ 10°F ΔT, based on 45°F entering chilled water temperature.
3.2.1.17. Post Cooling Coil thermostatically controlled to discharge air temperature set point.
3.2.1.18. Process Air inlet Filtration: Moisture Separator / Demister type filtration for purging 98% of the moisture. Paper or fibrous filtration media is not acceptable.
Desiccant Reactivation Requirements
3.2.1.19. Reactivation Air Flow Requirement: 3100 CFM
3.2.1.20. Fan curve and static pressure requirements need to be sized appropriately to overcome pressure drop of all internal components, heating coils and desiccant wheel.
3.2.1.21. Electric reactivation required, serving as the only reactivation heat source.
3.2.1.22. Electric Reactivation heat: 186KW
Rev: Orig. Page 3 of 9
3.2.2. Equipment Alternate: 15,000 CFM DCCU
Physical Attributes
3.2.2.1. Physical Attributes: Dimensions 20’10” x 8’4” x 10’1” [L x W x H] Weight: 18,800 Lbs.
3.2.2.2. All Components much be fully integrated within single housing.
3.2.2.3. Electrical Power Requirements: 2 Circuits at [460 Volt AC / 3 Phase / 400A] each
3.2.2.4. Process air outlets: Quantity of three at 20” Dia. Each
3.2.2.5. Process air returns: Quantity of three at 20” Dia. Each
3.2.2.6. Pre Cooling Coil male & female 4 IN diameter Fittings. Water inlet and outlet connection fittings must be quick disconnect style fittings meeting the requirements defined in reference 2.1.1.2
3.2.2.7. Post Cooling Coil male & female 3 IN diameter Fittings. Water inlet and outlet connection fittings must be quick disconnect style fittings meeting the requirements defined in reference 2.1.1.2.
3.2.2.8. Pre and post chilled water coils must have manual air bleed valves to assist with the initial filling the chilled water loop.
Process Air Requirements
3.2.2.9. Process Air Flow requirements: 15,000 CFM @ 10 inches External Static Pressure
3.2.2.10. Process Air Fan: Fan curve capable of delivering specified flow and pressure, installed with TEFC Premium Motors, and VFD controlled
3.2.2.11. Total Cooling capacity: 100 Tons Nominal
3.2.2.12. Moisture Removal Rate: 669 Lbs./Hr Total [ Pre-Coiling Coil 250 Lbs./Hr] [Desiccant Wheel 419 Lbs./Hr]
3.2.2.13. Moisture Removal Rate Basis: [80°F EDB / 71°F EWB & 75°F LDB / 17% RH]
3.2.2.14. Post Heater requirements: 312 KW Electric heating element, thermostatically controlled to discharge air temperature set point.
3.2.2.15. Pre Cooling Requirement: 50.8 Tons = 170 GPM @ 10°F ΔT, based on 45°F entering chilled water temperature.
3.2.2.16. Post Cooling Requirement: 32.1 Tons = 93 GPM @ 10°F ΔT, based on 45°F entering chilled water temperature.
3.2.2.17. Post Cooling Coil thermostatically controlled to discharge air temperature set point.
3.2.2.18. Process Air inlet Filtration: Moisture Separator / Demister type filtration for purging 98% of the moisture. Paper or fibrous filtration media is not acceptable.
Desiccant Reactivation Requirements
3.2.2.19. Reactivation Air Flow Requirement: 4200 CFM
3.2.2.20. Fan curve and static pressure requirements need to be sized appropriately to overcome pressure drop of all internal components, heating coils and desiccant wheel.
3.2.2.21. Electric reactivation required, serving as the only reactivation heat source.
3.2.2.22. Electric Reactivation heat capacity: 232KW
4. NOTES:
4.1. Coolant Free:
Besides manifolds and hose assemblies that are normally flushed and tested, all machinery conveying chilled
Rev: Orig. Page 4 of 9 water such as: the Chiller, Pump and machines with a chilled water coil; shall arrive with no coolant of any type in its piping (i.e. No Water & No Anti-Freeze).
4.2. Phase Rotation:
To prevent or identify an out-of-phase electrical power situation, three-phase machines shall include either: (a) a reverse phase relay and/or meter that identifies an out-of-phase condition and prevents operation especially applied to complex machinery in which such a condition could cause damage or (b) an arrow prominently displayed at an appropriate location on the machine's housing to indicate the proper direction of shaft rotation with the ability to observe a portion of the shaft after a momentary application of power (a.k.a. jog or bump). A reverse phase relay is not required nor desired for VFD motors, however, the VFD shall have a jog button so as to verify correct rotation.
4.3. Supplemental Equipment:
For the protection and cleanliness of the machinery components, all chilled water connection points shall be shipped with plug/cap fittings.
4.4. Desiccant Climate Controlled Unit & Moisture Removal Rates:
The Vendor shall provide the Moisture Removal Rate (MRR) for just the Desiccant wheel in either pounds per hour (lb/hr) or gallons per day (gal/dy) and state the basis for that computation at an ambient temperature (Dry Bulb i.e. °F) and ambient humidity (Wet Bulb in °F or Relative Humidity as a % or Humidity Ratio in gr/lb – grains of moisture per pound of dry air). The Vendor shall provide the Dehumidification system Moisture Removal Rate (MRR) which includes the Pre-Cooling Coil as well as the Desiccant wheel, for conditions at NLON, CT. See reference 2.1.2.2. ASHRAE: Handbook of Fundamentals, Weather Data and Design Conditions, Climatic Conditions for United States and Canada provides data as follows for NLON, CT. Section 4.5.1 lists the acceptable Desiccant wheel only Moisture Removal Rates for three different data points on the Psychrometric Chart dependent on the particular Original Equipment Manufacturer's (OEM) tested or published criterion.
4.5. DCCU Capacity & Utilities:
4.5.1. Moisture Removal: As a stand-alone unit, the DCCU shall be capable of delivering processed air at 0°F dew point or lower when the ambient conditions approach saturation at a temperature of 75°F. The minimum rate for moisture removal at the specified full rate of airflow is based on ambient conditions as synopsized below of either:
{ 75 degrees Fahrenheit at 50% Relative Humidity (75°F @ 50% RH) } or ( 80 degrees Fahrenheit at 60% Relative Humidity (80°F @ 60% RH) ) or [ 90 degrees Fahrenheit at 120 grains per pound of dry air Absolute Humidity (90°F @ 120 gr / lb AH) ]
4.5.2. Reactivation: The type of utility for the reactivation heater (e.g. electricity or steam) shall be as specified in section 3.2.
4.5.3. Airflow: An integrated blower (air-handler) is required for independent operation of the unit. With the blower operating at full speed, the airflow in cubic feet per minute (cfm) combined with either the fan's external Total Static Pressure (TSP) in inches of Water Gauge (WG) shall meet the performance stated in section 3.2.
4.5.4. Compatibility: The DCCU shall be inclusive of all associated temperature conditioning coils designated to be to serve as pre-treatment and downstream post-treatment to the desiccant wheel.
4.5.5. Control: The unit shall include a permanently mounted control board accessible without opening any panels with temperature thermometer(s) and pressure gauge(s) as necessary for monitoring and control. The unit shall be completely wired for safety, capacity, and operation such as a power / switch system with circuit breakers, manual / automatic controller, motor overload protection, high / low pressure cut-outs, energy control system, and other essential components. The unit shall be fully controllable under a wide range of loads even though the diurnal and seasonal ambient temperatures varies greatly.
Rev: Orig. Page 5 of 9
4.5.5.1. Moisture Removal: The reactivation wheel shall be capable of being manually shut-off and still be able to operate the process air blower.
4.5.5.2. Airflow: The unit shall incorporate Variable Frequency Drive (VFD) control for the process air blower so that the air-handler shall be capable of adjusting the airflow to 30% of the maximum specified airflow.
4.5.6. Design & Construction: The unit shall be rigidly mounted within a single integrated framed structure manufactured as a complete entity to include all devices, accessories, and fittings such as the desiccant wheel, desiccant driver, reactivation heater, energy control system, motors, filters, and other auxiliary components necessary to dehumidify ambient air and deliver that air to ancillary mechanical equipment.
The unit shall be designed for continuous operation despite extreme ambient conditions (e.g. –10 to +100°F & 0 to 100% RH). The desiccant dryer shall be an adsorption type wheel with a single desiccant rotary structure. Desiccant wheel matériel can be either the former titanium silica-gel or the more recent zeolite or even a more advanced superadsorbent Polymer, but, not the older more problematic lithium chloride.
4.5.7. Filtration: The air to be processed shall be pre-filtered and its filtration efficiency shall be 30% or greater.
The unit shall be delivered with all clean (reusable) and/or all new (replaceable) filters. The filters shall be of the correct dimension and in sufficient quantity to completely fill the design space of the filter rack(s) with no discernible gaps. Prior to start-up, the Vendor shall demonstrate that all reusable filters are clean & replaceable filters are new and are properly installed. For dehumidifiers, the air to be filtered is at or near the intake(s) to the Process Air Inlet(s).
4.5.8. Supplemental Equipment: For the protection and cleanliness of the machinery components, all air and water/steam connection points shall be shipped with sheet metal covers (air) and plug/cap fittings (water/steam).
4.6. Termination Couplers: Process Air outlets for the various ventilation systems shall terminate in nominal twenty-inch diameter openings either by design or by providing the proper reducers. This will allow for the attachment of nominal twenty inch diameter flexible ducting as provided by either the Vendor and/or the Government.
4.7. Process Air Doors or Covers: Air handling machinery conveying Process Air shall include tightly-fitting non-detachable doors (preferred) or detachable covers (permitted) for each suction inlet and discharge outlet.
4.8. Chilled Water Hose Assembly / Manifold Construction / Cooling Coil Hydrostatic Testing: For standard Chilled Water Hose assemblies of six inch nominal diameter or less, the exterior cover shall be a thick rubber (Buna-N) type material designed as a CHW insulator in which the nominal hose length is twenty-five feet with one male and one female quick disconnect Fittings. All Chilled water connectors / fittings must be quick disconnect style fittings meeting the requirements defined in reference 2.1.1.2. Chilled Water Hose assemblies shall be non-collapsible and the camlock fittings shall be attached to the hose material via the more secure, newer type, crimp style hose fitting via a single specified diameter, elongated sleeve length and not from the less secure, older type, band clamp style hose fitting via multiple universal diameter, shorter ferrules. Gaskets for couplings shall be pre-installed inside the female coupling(s) of hose assemblies and manifolds. The gasket shall be inspected for presence, tight fit, and lack of deterioration. Gaskets shall not protrude into the waterway. A gasket with a smaller diameter than that of the recess can cause a leaky connection when pressure is applied.
Hose/manifold/valve assemblies and all cooling coils shall be hydrostatically tested with new hose gaskets for Strength and Tightness and/or Valve Seat Leakage by an independent (of the Contractor) and certified Vendor to a minimum of 150 psig for five minutes and visually inspected and/or internal valve leakage measured while pressurized. Hydrostatic test date shall be within one calendar year of scheduled Arrival Date of the equipment.
Hoses/manifolds/valve assemblies shall have a banded identification (ID) tag or label attached to the assembly displaying the hydrostatic test results. A copy of the Hydrostatic Test Certificates issued by the certified testing facility shall be provided to PNSY Temporary Services Design Engineer and the Contracting Office, Code 400.
4.9. Construction: Except as noted for a particular machine type, units shall be a single integrated framed structure manufactured as a complete entity to include all devices, accessories, and fittings necessary to perform the
Rev: Orig. Page 6 of 9 function for which it was designed. Each unit shall be capable of continuous, year-round, outdoor, unmanned operation even at minimal loading while exposed from inclement to extremely harsh weather (e.g. deep snow, strong & gusty winds, and/or heavy rain) and varied ambient conditions (–10 to +110°F & 0 to 100% RH).
Machines shall meet State and federal requirements for its type such as the National Electrical Code (NEC) for electrical devices / components and the American Society of Mechanical Engineers (ASME) for pressurized vessels / components. Machines shall be modular in design so as to act as a stand-alone unit; compact so as to fit in the tight confines of a drydock; portable so as to be transported by forklift and then lifted by crane; and ruggedly constructed so as to endure a marine industrial environment. Machines shall be newly manufactured / completely refurbished and factory tested within ten (10) years.
4.10. Electrical: Electrical components shall conform to a NEMA standard (NEMA 3 or 4) that allows for unsheltered outdoor use of the unit. Each machine shall require only one type / source of electrical power (460 VAC +5% / three-phase / 60 hertz). The type of electrical power required (voltage & amperage) must be clearly indicated on the outside of the equipment, readily detected, and collocated with all other electrical information. The Vendor shall provide the Project Technical Liaison with the following details: (i) electrical power type (amperage & voltage); (ii) type of electrical connectors (for three phase, specify whether or not equivalent to Duraline E1016);
(iii) breaker type/size or recommended capacity for the electrical source; and (iv) whether the machine is furnished with over-current protection. Three phase powered (i.e. 460V) machines shall have panel-mounted male cam-lock connectors equivalent to a single Duraline E1016 for each phase if ≤ 285A (preferred, permits 2/0 cable) or ≤ 385A (minimum, but restricted to 4/0 cable).
4.11. Lifting & Handling:
4.11.1. See reference 2.1.1.1.
4.11.2. Lifting & Handling Exception:
Although considered to be machinery, individual pump units, being relatively lightweight and compact, are not required to be enclosed in a caged frame. However, the remaining Lifting and Handling requirements pertain in that the unit will be handled by forklift.
4.11.3. Rigging Caution:
A strap fell during a machine lift. Apparently, the strap was dislodged from an area visually inaccessible in the Pre-Lift inspection. Hence, all spaces or voids in which loose matériel may be purposely placed or inadvertently dropped with potential of displacement and then falling during movement or rigging shall have a means of capturing that matériel such as screens, netting, or false floors. For voids in which means to capture the matériel is impractical, an observation port shall be provided for an inspector to visually survey the space or void without use of a ladder, fall protection equipment, or special tooling.
4.12. Noise Requirement: When operating at full speed, noise levels must not be over 105 dB[A] and preferably, 85 dB[A] or less at six feet from the unit or frame unless a quieter noise level is specified. A hearing protection safety placard shall be posted on each machine generating more than 85 dB[A] at the unit's edge or frame.
4.13. Machinery / Equipment Tagging and Markings: Fluid piping inlet(s) / outlet(s) must be clearly marked.
Machinery and itemized equipment require tagging to show Project Number / Technical Specification Identification (ID) Number
4.14. Vendor Identification Of Itemized And Ancillary Equipment: The Contractor shall uniquely tag and permanently mark all of its ancillary and itemized equipment / hardware (e.g. manifolds, hose assemblies, pipe fittings, duct adapters, ducting, etc.) so as to differentiate from that owned by either the Shipyard or other Vendors. Tagging alone is sometimes not sufficient. Suggest painting the ferrous metal on hardware and the end fittings on hose assemblies with unique and distinct color(s).
Rev: Orig. Page 7 of 9
4.15. Dead Front Control Panel or External Controller: Access to basic machinery controls, such as a Dead Front Control Panel or External Controller, shall be such that there is non-exposure to energized "live" electrical circuits or other components regardless of voltage, to include control circuitry, by "a person on the operating side of the equipment".
5. GOVERMENT FURNISHED MATERIAL (GFM):
5.1. N/A
6. RESPONSIBILITES
6.1. Government
6.1.1. N/A
6.2. Contractor
6.2.1. The equipment will be operating around-the-clock under a rigorous deployment performance schedule.
Within twenty-four (24) hours of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the job-site fully prepared to repair the rental equipment. The defective unit(s) shall be repaired within forty-eight (48) hours of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours of initial notification.
If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.
6.2.2. The vendor shall provide technical support to PNSY project personnel as required.
6.3. Machinery Quality Checklist (MQC): The vendor shall develop and provide a Quality Checklist unique for each machine. The MQC shall include an operational checklist and Objective Quality Evidence (OQE) of functional testing of each machine prior to shipment. Copies shall accompany the machine and be sent to the Project COR and Temporary System Design Engineer.
6.4. Maintenance
6.4.1. Except for daily surveillance checks, the Contractor is responsible for all equipment preventative maintenance and repairs for the duration of the lease. Coordinate maintenance with Shipyard Temporary Service Zone Manager.
6.4.2. The vendor shall provide Preventative Maintenance (PM) schedules which are equipment specific. The PM shall meet all requirements determined by the Original Equipment Manufacture (OEM). The vendor shall provide the PM documentation and schedules to PNSY Temporary Services Engineering Code 230 for review and approval prior to being considered for a successful Bid. The routine PM plan for each piece of equipment shall include a comprehensive list of the components to be serviced as well as identifying the service frequency. (e.g. all consumables to be replace, bearing grease points, belt replacement / tensioning, filter changes, refrigerant charge, oil changes, other lubrication, coolant refills, liquid top-offs, etc.) All PMs conducted shall include a technical service report identifying component, maintenance conducted, date, and next scheduled PM date. Copies of all reports shall be delivered to the project COR and the Temporary Service Zone Manager.
6.4.3. In addition to providing routine preventative maintenance, the vendor shall provide a service technician on a weekly basis for the duration of the lease to perform weekly equipment inspections. Weekly equipment inspections shall consist of checking all functional operating parameters of each individual piece of equipment. This shall include but is not limited to: verifying correct equipment performance and operation, checking for diagnostic or trouble codes, measuring discharge air temps, assessing DH equipment reactivation air performance, verify amperage of all electric heating coils, verification of chilled water coils performance, verify pump operation, motor speed, and differential pressure, verify HVAC process air fan speeds, DH process air discharge air temperature and RH performance, Chiller performance operation, etc.
Rev: Orig. Page 8 of 9
Weekly equipment inspections shall include a technical field report identifying the status of each piece of equipment and shall include all data / measurement points verified. All reports are delivered to the project
COR.
6.4.4. The vendor shall provide a knowledgeable service technician to cover the repair of all equipment deficiencies and malfunctions. The response time for the repair or replacement of deficient equipment shall meet the requirements defined in section 6.2.1.
6.5. Training
6.5.1. The Contractor is responsible for and shall provide training sessions to Shipyard Personal on the operation & setup of all equipment. Training shall be available throughout the duration of the lease to accommodate equipment swap out and seasonal equipment operation.
6.6. Deliverables – In addition to all required equipment, technical documentation shall also be provided electronically to the project COR and Engineering. Minimally, the documentation shall consist of:
6.6.1. Lifting & Handling the equipment with its padeye(s) Certification. (see Reference 2.1.1.1)
6.6.2. Points of contact with telephone numbers for requesting emergency repair regardless of the time or type of day
6.6.3. Technical Instructions (TIs) such as an Operations & Maintenance Manual, Controls Manual, and/or Mechanical/Electrical Manual with Schematics.
6.6.4. Operating Instructions, if not in the TI.
6.6.5. Preventative Maintenance Schedules. (See section 6.4.2)
6.6.6. Moisture Removal Rates (See Section 4.4 & 4.5)
6.6.7. MQC’s (See section 6.3)
6.6.8. Equipment Data Sheet (EDS).
7. DELIVERY / ACCEPTANCE / RETURN
7.1. Delivery - The machinery shall be in a fully-charged, fully-assembled, ready-to-use, and in a first-class-operating condition. Machines shall be functionally tested prior to its delivery and all leased products, including machine / equipment / ancillary component accompanying machine, must fully function as intended. The machinery with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and the responsibility of the Contractor to either confirm or coordinate the date and time of delivery prior to each shipment via the Point-of-Contact (POC) as designated on the Contract and/or the Contracting Officer's Representative (COR). The Government can provide forklift services for removing machinery from Vendor’s transport during work hours. Documentation with Shipyard copies shall accompany each delivery.
7.2. Acceptance - Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Portsmouth Naval Shipyard, Code 990 Equipment Manager) will sign and forward the acceptance document(s) to Code 220 Production Control for completion. Unloading of equipment from Vendor’s transport does not signify acceptance.
7.3. Start Up - If requested by the Project, the Vendor shall: (i) start and run the equipment to verify its operability; (ii) confirm that a set of operating instructions was previously delivered; and/or (iii) instruct designated Shipyard personnel on how to properly run the equipment to include its operation, control, daily checks, & service contacts. For multiple sets of comparable equipment with essentially similar operation, the orientation given to a specific Project on a particular type and/or capacity of machine can be accomplished just once regardless of delivery.
7.4. Security - To be allowed onto a government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock. Allowable documentation of US citizenship is an official government issued Certificate of Birth or
Rev: Orig. Page 9 of 9
Naturalization (w/ raised seal & not a photocopy) or a US passport (can be expired). Vehicular access requires a non-expired personal Driver’s License and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed. To gain access to the drydock environs, personnel must be escorted and possess / wear their own personal safety gear.
7.5. Receipt Inspection Criteria – Equipment must meet all criteria defined in this specification.
7.6. Return - The Government will provide a temporary storage location convenient for Contractor pick-up. The Government will notify the Contractor as well as the Contracting Office as to when the rental Item has been released and is available for pick-up. The last day of the rental period shall be the next normal workday after the Contractor has been so notified. The Contractor shall be responsible for shipping. The Government can provide forklift services during work hours for placing the equipment onto the vendor’s transport.
8. GENERAL
8.1. Response to Request - As part of the response to this request, descriptive literature shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling being provided, statements of compliance with specification, and performance statements with special instructions. Supporting information shall be organized and packaged by unit. If supporting information includes multiple models the vendor shall clearly state model number of proposed unit and redact all information not applicable to proposed unit.
9. ATTACHMENTS
9.1. N/A