ATTACHMENT 1
STATEMENT OF WORK FOR
REPLACEMENT #4 RAC PLANT COMPRESSOR/MOTOR OVERHAUL
1.0 BACKGROUND
1.1 This Statement of Work (SOW) describes overhaul to be performed by the Contractor for repair of the #4 RAC Plant at PNSY. The contractor will provide the equipment and work required to generate the deliverables outlined below.
1.2 The overhaul requires contractor expertise and equipment to certify that the replacement compressor/motor asset for the #4 RAC Plant is acceptable for installation shipboard.
1.3 Control Specifications/References:
(A) S6230-BM-TMM-A10, Revision 00, Change E - Refrigerant-114 Duplex Hermetic Single-Stage Centrifugal Chilled Water Air Conditioning Plant 150 Ton Capacity
2.0 OBJECTIVE AND SCOPE
2.1 Overall Objective: The contractor will perform overhaul, operational air run and lube oil pressure/flow test of the replacement #4 RAC Plant Compressor/Motor in accordance with Reference (A). Upon successful testing, contractor shall ship replacement #4 RAC Plant Compressor/Motor back to PNSY. Upon successful testing, the contractor shall provide copies of test data to PNSY
2.2 Scope: The contractor will be required to support the testing of the replacement #4 RAC Plant Compressor/Motor on or about July 2019. Specific start date is request to be as soon as possible. Overhaul must be completed within a 30-day period. These dates are projected dates and are subject to change.
3.0 PERFORMANCE OBJECTIVES
3.1 The required Tooling and Equipment is to be provided by the contractor at their facility as needed to support overhaul as specified in with of Reference (A).
4.0 QUALITY ASSURANCE
4.1 Final verification and acceptance of system cleanliness will be based upon satisfactory overhaul of replacement #4 RAC Plant Compressor/Motor in accordance with Reference (A).