RFQ.pdf

PDF 802 KB Posted

Attached to
1 INCH METALLIC PIPE Federal contract opportunity
Solicitation number
N3904019Q0278
Issued by
Department of the Navy Naval Sea Systems Command

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

TEL: 207-438-5206 FAX:

N0010419RX19807

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

DO-A3N3904019Q0278 22-May-2019

5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NO TE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA

FAR (48 CFR) 53.215-1(a)

THIS RFQ [ ] IS X[ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

PORTSMOUTH NAVAL SHIPYARD

CODE 410

KITTERY ME 03904

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

05-Jun-2019(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

207-438-5253NATHAN R WESTMAN

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

N3904019Q0278

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 8,000 Inch

PIPE 1 INCH

FFP

Line item 0001 to be in accordance with Attachment 1.

NSN: 1H 4710-00-432-3164 X2

Material to be Level 1, QA-A.

FOB: Destination

MILSTRIP: N0010419RX19807

PURCHASE REQUEST NUMBER: N0010419RX19807

PSC CD: 4710

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Set Data Requirements

FFP

Line item 0002 to be in accordance with Exhibit A and Attachment 1 to Exhibit A.

PSC CD: 4710

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

Line item 0001 to be in accordance with Attachment 1. Line item 0002 to be in accordance with Exhibit A and

Attachment 1 to Exhibit A. See Section J for more information.

Where the quantity requested is not available or within your minimum mill quantity, please quote minimum quantity required. Award may be made on the basis of that quantity and price most advantageous to the government.

The following dimensions are the maximum allowable sizes which will be accepted in an enclosed truck:

Plate/ Sheet stock: 4 FT X 7 FT, Max weight = 3,200 LBS

Pipe/ Tubing, Flat Bar/ Angle Bar, Beam(s) all configurations, and Barstock:

Up to 7 FT long with a max weight = 3,000 LBS

7 FT to 20 FT long with a max weight = 250 LBS

Any material in excess of the allowable limits stated above MUST be shipped in open flatbed trailers.

CLAUSES INCORPORATED BY FULL TEXT

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

(End of text)

C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)

(a) Definitions. As used in this text:

Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.

Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.

Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.

Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.

Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.

Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.

(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.

(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).

(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard

Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.

No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the

LCD screen and seal it in plastic following any evidence that the backlight failed.

(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear

Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.

(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear

Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication

0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.

(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.

(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.

(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV

Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.

(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL-

DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness

Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).

(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous

Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.

(End of Text)

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form

1423, Exhibit(s) A, attached hereto.

(End of Text)

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial

Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (OCT 2018)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-

D-3951-15 approved 1 December 2015, Standard Practice for Commercial Packing.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the

Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Origin Government Origin Government

0002 Origin Government Origin Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996

52.246-16 Responsibility For Supplies APR 1984

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Higher-Level Contract Quality Requirements (MIL-I-45208 or ISO9001/9002:1994 or ISO

9001:2000/2008/2015 with STR-ISO 9000 Supplement A or B or C)

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT

(GOVERNMENT SPECIFICATION) (Jan 2017)

Definition: “Contract Date”, as used in this clause, means the date set for bid opening or, if this is a negotiated contract or a modification, the effective date of this contract or modification.

The Contractor shall comply with the specification titled “Quality Program Requirements” MIL-Q 9858, or

“Inspection System Requirements” MIL-I-45208 or ISO- 9001/9002:1994 or ISO 9000:2000/2008/2015 with STR-

ISO 9000 supplement A or B or C.

QUALITY ASSURANCE PROVISIONS: As a minimum, the supplier (at their option) shall provide and maintain an inspection system that meets one of the following:

A. MIL-I-45208

B. MIL-Q-9858

C. ISO 9001/9002:1994 WITH STR-ISO-9000 Supplement A or B or C

D. ISO 9001:2000/2008/2015 WITH STR-ISO 9000 Supplement A or B or C

The following document, STR-ISO 9000 supplement C, applies to this order only if the ISO 9000 quality System is used. Ignore this document if MIL-I-45208 or MIL-Q-9858 is used.

STR ISO 9000 Supplement C

Revision 4, 05 January 2017

SUPPLEMENT TO ISO 9000 (ANSI/ISO/ASQ Q9000) QUALITY SYSTEMS

FOR NON CRITICAL (BASIC) PROCUREMENTS AND COMPLEX PROCUREMENTS

The organization shall establish and maintain a quality assurance program in accordance with ISO 9000:1994

(ANSI/ISO/ASQ Q9000) Quality Systems Models or ISO 9001:2000/2008/2015 (ANSI/ISO/ASQ Q9001) Quality

Management Systems as modified and amended herein which shall apply on contracts invoking this document.

Paragraph references correspond to the 1994 revisions of ISO 9001, ISO 9002, and ISO 9003 (ANSI/ISO/ASQ

Q9001/2/3) or the 2000/2008/2015 revision of ISO 9001 (ANSI/ISO/ASQ Q9001) as noted. This has been done as a convenience only and the issuing agency assumes no liability whatsoever for any inaccuracies in these notations.

To support the preferred implementation of ISO 9001:2000/2008/2015, the terminology used to describe the supply chain in ISO 9001:2000/2008/2015 has been incorporated herein. When the 1994 version is applied, replace

“organization” with “supplier” and “supplier” with “subcontractor.” When the 2015 version is applied replace

“supplier” with “external provider.” When the 2015 version is applied, the term “documented information” refers to documentation, quality manual, documented procedures, and records.

1. Organization Quality System

a. 1994 - Add to QUALITY SYSTEM – General: Paragraph 4.2.1

2008 - Add to Quality management system – General requirements: Paragraph 4.1

2015 - Add to Context of the organization – Quality management system and its processes: Paragraph 4.4

CNMM

VOLUME I CHAPTER 2

ENCLOSURE (3)

REV ORIG CCN: 0

ENCLOSURE (3)

The organization shall provide and maintain a quality assurance program that ensures that the product meets the contract requirements and that is acceptable to Customer and Government. The organization shall notify the customer in writing of any change, other than editorial, to the quality manual.

2. Coordinated Government/ Organization Actions and Use of Organization Inspection Facilities

a. 1994 - Add to Purchasing data: Paragraph 4.6.3

2008 - Add to Purchasing information: Paragraph 7.4.2

2015 - Add to Information for external providers: Paragraph 8.4.3

When, under authorization of the Government Representative, copies of the purchasing document are to be furnished directly by the supplier or organization to the Government Representative at their facility rather than through Government channels, the organization shall add to their purchasing document a statement substantially as follows:

“On receipt of this order, promptly furnish a copy to the Government Representative who normally services your plant. In the event the representative or office cannot be located, our purchasing agent should be notified immediately.”

All documents and referenced data for purchases applying to a Government contract shall be available for review by the Government Representative to determine compliance with the requirements for control of such purchases.

Copies of purchasing documents required for Government inspection purposes shall be furnished in accordance with the instructions of the Government Representative.

b. 1994 - Add to Receiving inspection and testing: Paragraph 4.10.2.1

2008 - Add to Verification of purchased product: Paragraph 7.4.3

2015 - Add to Type and extent of control: Paragraph 8.4.2

The organization shall make available to the Government Representative reports of any nonconformance found on

Government source-inspected supplies and shall (when requested) require the organization to coordinate with their

Government Representative on corrective action.

c. 1994 - Add to INSPECTION AND TESTING – General: Paragraph 4.10.1

2008 - Add to Monitoring and measurement of product: Paragraph 8.2.4

2015 - Add to Release of products and services: Paragraph 8.6

When required, the organization’s measuring and testing equipment shall be made available for use by the

Government Representative to determine conformance of product with contract requirements. In addition, if conditions warrant, organization’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

3. Sample Inspection (Applicable where ISO 9003: 1994 is implemented)

a. 1994 - Add to STATISTICAL TECHNIQUES – Procedures: Paragraph 4.20.2

2008 - Add to Measurement, analysis and improvement – General: Paragraph 8.1

2015 - Add to Analysis and evaluation: Paragraph 9.1.3

CNMM

VOLUME I CHAPTER 2

ENCLOSURE (3)

REV ORIG CCN: 0

ENCLOSURE (3)

Statistical techniques or sampling inspection procedures used for product acceptance shall be subject to approval by the customer.

4. Interpretation of Limits

a. 1994 - Add to Quality planning: Paragraph 4.2.3

2008 - Add to Planning of product realization: Paragraph 7.1

2015 - Add to Operational planning and control: Paragraph 8.1

Where not otherwise contractually invoked, all specified limits for machining services and for dimensional control of deliverable parts and assemblies shall be interpreted as absolute limits as defined by ASTM E29, Standard

Practice for Using Significant Digits in Test Data to Determine Compliance with Specifications. Unless otherwise specified in the contract, for all other observed, measured or calculated product characteristics (e.g. for material suppliers, material distributors, services other than machining) specified limits shall be interpreted using round-off method as defined by ASTM E29.

5. Electronic Signatures

a. 1994 - Add to CONTROL OF QUALITY RECORDS: Paragraph 4.16

2008 - Add to Monitoring and measurement of product: Paragraph 8.2.4

2015 - Add to Release of products and services: Paragraph 8.6

When signatures are required by contract and will be provided electronically, protection from unauthorized changes of recorded data shall be provided.

6. Documented Information

a. 2015 - Add to Documented information - General: Paragraph 7.5.1

The organization shall create a documented procedure to define the control(s) needed for Naval Nuclear Propulsion

Program (NNPP) documented information.

b. 2015 - Add to Management review inputs: Paragraph 9.3.2

The organization shall retain the management review inputs as documented information.

7. Corrective Actions

a. 2015 - Add to Monitoring, measurement, analysis and evaluation - General: Paragraph 9.1.1

The organization shall take corrective action as appropriate when planned results are not achieved.

b. 2015 - Add to Nonconformity and corrective action: Paragraph 10.2

The organization shall create a documented procedure for reacting to nonconformities including identifying the nonconformities, determining the causes of the nonconformities, evaluating the need for actions to prevent reoccurrence of the nonconformities, implementing the required actions to correct the nonconformities, reviewing of the effectiveness of the corrective action taken to prevent reoccurrence of the nonconformances, updating risks and opportunities as necessary, and making changes to the quality management system as necessary.

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-246-H001 CLARIFICATION OF INSPECTION, DELIVERY AND ACCEPTANCE TERMS FOR VESSELS

AND CRAFT--BASIC (NAVSEA) (OCT 2018)

(a) The following terms apply exclusively to the delivery and acceptance of the vessels or craft constructed under this contract:

(1) This contract incorporates the clause entitled “Inspection of Supplies-Cost Reimbursement (FAR 52.246-3).

The term “Preliminary Acceptance” as used in this contract refers to the Government’s conditional acceptance of the vessels/craft in accordance with the text entitled “Delivery of Completed Vessel” after successful completion of the applicable testing and trial requirements and upon delivery as set forth in Section F of the contract. The Contractor shall prepare and furnish to the Contracting Officer a DD Form 250 in accordance with DFARS 252-246.7000 entitled “Material Inspection and Receiving Report” which is to be incorporated into the Preliminary Acceptance documentation.

(2) The term “Final Acceptance” as used in this contract refers to the completion of all conditions associated with acceptance of the vessel and the expiration of the Guaranty/Warranty Period.

(3) The term “acceptance” as used in paragraph (f) of the clause entitled “Inspection of Supplies-Cost

Reimbursement (FAR 52.246-3), shall be deemed to refer to “Final Acceptance,” as defined above.

E-246-H002 CLARIFICATION OF INSPECTION, DELIVERY AND ACCEPTANCE TERMS FOR VESSELS

AND CRAFT—ALTERNATE I (NAVSEA) (OCT 2018)

(a) The following terms apply exclusively to the delivery and acceptance of the vessels or craft constructed under this contract:

(1) This contract incorporates the clause entitled “Inspection of Supplies—Fixed Price (FAR 52.246-2) and its

Alternate I, if applicable. The term “Preliminary Acceptance” as used in this contract refers to the Government’s conditional acceptance of the vessels/craft in accordance with the text entitled “Delivery of Completed Vessel” after successful completion of the applicable testing and trial requirements and upon delivery as set forth in Section F of the contract. The Contractor shall prepare and furnish to the Contracting Officer a DD Form 250 in accordance with

DFARS 252-246.7000 entitled “Material Inspection and Receiving Report” which is to be incorporated into the

Preliminary Acceptance documentation.

(2) The term “Final Acceptance” as used in this contract refers to the completion of all conditions associated with acceptance of the vessel and the expiration of the guaranty/warranty period.

(3) The term “acceptance” as used in paragraph (k) of the clause entitled “Inspection of Supplies—Fixed Price

(FAR 52.246-2) and its Alternate I, if applicable, shall be deemed to refer to “Final Acceptance,” as defined above.

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form

1423.

E-246-H017 INSPECTION AND ACCEPTANCE OF F.O.B. ORIGIN DELIVERIES (NAVSEA) (OCT 2018)

Item(s) 0001-0002 - Inspection and acceptance shall be made at source by a representative of the cognizant Contract

Administration Office or other representative of the Government.

E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)

The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 90 dys. ADC 8,000 PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N39040

0002 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

N39040

52.211-17 Delivery of Excess Quantities SEP 1989

52.242-15 Stop-Work Order AUG 1989

52.242-17 Government Delay Of Work APR 1984

52.247-30 F.O.B. Origin, Contractor's Facility FEB 2006

52.211-9 DESIRED AND REQUIRED TIME OF DELIVERY (JUN 1997)

(a) The Government desires delivery to be made according to the following schedule:

DESIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

0001 600 inches 90 Days

AFTER Approved Procedures

If the offeror is unable to meet the desired delivery schedule, it may, without prejudicing evaluation of its offer, propose a delivery schedule below. However, the offeror's proposed delivery schedule must not extend the delivery period beyond the time for delivery in the Government's required delivery schedule as follows:

REQUIRED DELIVERY SCHEDULE

0001 600 inches 1 year

Offers that propose delivery of a quantity under such terms or conditions that delivery will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. If the offeror proposes no other delivery schedule, the desired delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

0001 600 inches _____________

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. The

Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day the award is dated. Therefore, the offeror shall compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

52.211-16 VARIATION IN QUANTITY (APR 1984)

(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.

(b) The permissible variation shall be limited to:

10 Percent increase

10 Percent decrease

This increase or decrease shall apply to 0001.

F-247-H003 F.O.B. ORIGIN (NAVSEA) (OCT 2018)

All supplies hereunder shall be delivered free of expense to the Government in accordance with instructions specified in the clause hereof entitled "F.O.B. Origin" (FAR 52.247-29) at or near the Contractor's plant, (insert city, county, and state), for shipment at Government expense (normally on Government bill(s) of lading) in accordance with the delivery instructions specified herein. This paragraph is required pursuant to 52.247-29 (a)(1).

FMS item(s), if any, shall be shipped on a separate bill of lading and Interstate Commerce Act 49 U.S.C. Section 10721 and 13712 rates do not apply.

F-247-N002 INSTRUCTIONS FOR DELIVERIES TO THE PORTSMOUTH NAVAL SHIPYARD

(NAVSEA) (MAR 2019)

Mark shipping documents “Notify Receiving Officer, Portsmouth Naval Shipyard prior to arrival for delivery instructions. Telephone (207) 438-5521/5206.

“All drivers must either have a NCAC or Defense Biometric Identification System (DBIDS) card in addition they must have proof of US citizenship with them (birth certificate or US passport or state enhanced driver’s license

[only issued by WA, NY, VT, & MI]).” OVERSIZED CALL 24 HRS IN ADVANCE, (207) 438-5521. NO

ANIMALS ALLOWED ON BASE.

Except by special arrangement, shipments will be delivered only between the hours of 7:30 AM and 3:00 PM local time, Monday through Friday. (Federal Holidays excepted.)

Section G - Contract Administration Data

252.204-7006 Billing Instructions OCT 2005

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of

Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-

7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: TBD

(1) Document type. The Contractor shall submit payment requests using the following document type(s): Combo https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting

Officer.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the

Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC ____

Issue By DoDAAC ____

Admin DoDAAC** ____

Inspect By DoDAAC ____

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition

Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s

WAWF point of contact.

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT

OFFICE (NAVSEA) (JUN 2018)

(a) The following table of payment office allocation methods applies to the extent indicated.

For Government Use Only

Contract/Order Payment

Clause

Type of Payment

Request

S u p p ly

S er v ic e

C o n st ru ct io n

Payment Office

Allocation Method

52.212-4 (Alt I), Contract

Terms and Conditions—

Commercial Items

52.216-7, Allowable Cost and Payment

52.232-7, Payments under

Time-and-Materials and

Labor-Hour Contracts

Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each

ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-1, Payments Navy

Shipbuilding

Invoice (Fixed

Price)

X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

Contract/Order Payment

Clause

Type of Payment

Request

S u p v ic e

C o n st ru ct

52.232-1, Payments;

52.232-2, Payments under

Fixed-Price Research and

Development Contracts;

52.232-3, Payments under

Personal Services Contracts;

52.232-4, Payments under

Transportation Contracts and

Transportation-Related

Services Contracts; and

52.232-6, Payments under

Communication Service

Contracts with Common

Carriers

Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each

ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-5, Payments Under

Fixed-Price Construction

Contracts

Construction

Payment Invoice

N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-16, Progress

Payments

Progress

Payment*

X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR

32.501-3.

52.232-29, Terms for

Financing of Purchases of

Commercial Items;

52.232-30, Installment

Payments for Commercial

Items

Commercial Item

Financing*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and

32.1007(b)(2).

52.232-32, Performance-

Based Payments

Performance-

Based Payments*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and

32.1007(b)(2).

252.232-7002, Progress

Payments for Foreign

Military Sales Acquisitions

Progress

Payment*

X X N/A Allocate costs among line items and countries in a manner acceptable to the

Administrative Contracting Officer.

Contract/Order Payment

Clause

Type of Payment

Request

S u p v ic e

C o n st ru ct

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

(b) This procurement contains the following contract type(s):

This is a firm fixed price contract.

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.

Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer

Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data

Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

G-232-W001 PROMPT PAYMENT (FAR 52.232-25) REVISED CONSTRUCTIVE ACCEPTANCE PERIOD

(NAVSEA) (OCT 2018)

In accordance with FAR 32.904(b)(1)(ii)(B)(4), the Contracting Officer has determined that more than seven days are needed for constructive acceptance. Contractors are hereby advised that the constructive acceptance period established in paragraph (a) (5) (i) of FAR clause 52.232-25, Prompt Payment is revised to 45 days in lieu of 7 working days.

G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2018)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel

- that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: [ * ]

Address:

[ *Street ]

[ *City, State, Zip ]

Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx]

E-mail: [ * ]

(ii) The Contract Specialist is:

Address:

[ *Street ]

[ *City, State, Zip ]

(iii) The Administrative Contracting Officer (ACO) is:

Address:

[ *Street ]

[ *City, State, Zip ]

Phone: (Area Code) xxx- [xxxx];

(d) The Contracting Officer’s Representative (COR) is the contracting officer’s appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer’s Representative (COR) is:

Address:

[ *Street ]

[ *City, State, Zip ]

(e) The Alternate Contracting Officer’s Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

The Alternate Contracting Officer’s Representative (ACOR) is:

Address:

[ *City, State, Zip ]

(f) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material

(GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Address: [ *Street ]

[ *City, State, Zip ]

(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

The Alternate Technical Point of Contact (ATPOC) is:

Address:

[ *City, State, Zip ]

(h) The Ombudsman will review complaints from the contractors and ensure that all contractors are afforded a fair opportunity to be considered, consistent with the procedures in the contract.

The Ombudsman is:

Address:

[ *Street ]

[ *City, State, Zip ]

(i) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.

(j) The Authorized Ordering Person(s) for Per-Call Maintenance is:

Address:

[ *Street ]

[ *City, State, Zip ]

(k) The Contractor's point of contact for performance under this contract is:

Title: [ * ]

Address:

[ *Street ]

[ *City, State, Zip ]

[ * ] To be completed at contract award

Section I - Contract Clauses

52.204-13 System for Award Management Maintenance OCT 2018

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.211-5 Material Requirements AUG 2000

52.211-15 Defense Priority And Allocation Requirements APR 2008

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.243-1 Changes--Fixed Price AUG 1987

52.249-8 Default (Fixed-Price Supply & Service) APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7009 Limitations on the Use or Disclosure of Third-Party

Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013

252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017

252.225-7008 Restriction on Acquisition of Specialty Metals MAR 2013

252.225-7012 Preference For Certain Domestic Commodities DEC 2017

252.225-7013 Duty-Free Entry--Basic MAY 2016

252.225-7031 Secondary Arab Boycott Of Israel JUN 2005

252.225-7048 Export-Controlled Items JUN 2013

252.231-7000 Supplemental Cost Principles DEC 1991

252.232-7010 Levies on Contract Payments DEC 2006

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.247-7023 Transportation of Supplies by Sea FEB 2019

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (JAN 2019).

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iii) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

(iv) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(v) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

(vi) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(vii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(viii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).

(vii) 52.233-1, Disputes (MAY 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (JAN 2019).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of

Columbia)).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282)

(31 U.S.C. 6101 note) (Applies to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.