Quality Assurance Surveillance Plan (QASP)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A3_WD_15-4011_REV_10.pdf | ||
| A4_PAST_PERFORMANCE_INFORMATION_FORM.pdf | ||
| N3904019Q0247.pdf | ||
| A5_visit_req_redact.pdf | ||
| A6_GFP_Module_Attachment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3904019P0247 Attachment 2
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
YFN 1288 OVERHAUL AND MODERNIZATION
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued there under. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2. AUTHORITY
Authority for issuance of this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, and FAR 52.212-4(m), Termination for cause, and documentation called for in the contract to be accomplished by the Contracting Officer or his duly authorized representative.
3. SCOPE
The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan.
4. GOVERNMENT RESOURCES
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
Contracting Officer’s Representative (COR)/Alternate Contracting Officer’s Representative (ACOR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5. RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - The COR/ACOR is responsible for administration of YFN 1288 FY 19 overhaul work, and assures proper Government surveillance of the Contractor’s performance. The COR or ACOR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action. The COR will serve as the Quality Assurance Evaluator (QAE).
6. METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this
QASP.
Customer Feedback – Customer feedback may be obtained from random customer complaints. Naval Supply Systems form 1343 will be made available by the COR for the patrons. The COR shall have sole custody of the suggestion box. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR. .
Inspections – Each phase of the services rendered under the contract is subject to Government inspection during the Contractor’s operations and after completion of a task.
Inspections may be routine functions performed by the COR. Government inspections may be conducted in an unannounced manner by the COR or ACOR. The COR shall maintain a Contract Discrepancy Report (CDR), a copy of which will be provided to the Contractor. Within three days, the Contractor shall reply in writing to CDR(s) by stating reason(s) for unsatisfactory performance(s) and shall identify the corrective action(s) that will be taken to prevent recurrence(s).
IDENTIFIED QUALITY ASSURANCE SURVEILLANCE ITEMS
The following PBSC items are identified within the Statement of Work presented in Section C of the solicitation and are to be monitored under this QASP.
All deliverables covered by this contract
Measurement/Metric – Quality, Timeliness, and Responsiveness.
Performance Standard – Quality – shall focus on the contractor’s ability to satisfactorily meet the customer’s expectations of completed work. How many deficiencies were found or instances of rework were required are the types of things that shall be examined.
Timeliness – within the times and periods, such as on time delivery of products, status reports, invoicing, contractor’s written response within 3 days of CDR(s), and adherence to schedules shall impact any review of Timeliness.
Responsiveness–shall be concerned with how well the contractor responds to customer concerns and the approach used to resolve problems.
Maximum Error Rate – Quality - 0% Timeliness – 0% Responsiveness – 0%
COR may perform unannounced inspections at any time during the availability.
7. DOCUMENTATION
The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract. Information in the Quality Assurance file will be considered when completing the annual Contractors Performance Assessment Reporting Systems report.
8. ATTACHMENTS
Attachment A – QASP Matrix
QUALITY ASSURANCE SURVEILLANCE PLAN,(MATRIX)
YFN 1288 REPAIR AND UPGRADE
Deliverable or Service
Requirement
Measurement/ Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Hazardous Waste Control 077-11-001
Quality
Timeliness
Responsiveness
Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -Contracting Officer’s Representative (COR) review of Hazardous Waste Manifest Form and Generator Identification number.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptancce
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
CPARS.
In Addition, FAR 52.246-6 (f), (g) and (h).
Underwater Hull Inspection and Repair 110-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR review UT inspection results.
-COR visually inspect completed work
- Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Void; Clean, Inspect, and Preserve.
123-21-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% COR review initial inspection report
-Unannounced inspections conducted by the COR and/or by (ACOR)
-COR review of final inspection report.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptancce
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Exterior Attachment; Remove 150-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Watertight Hatch and Inclined Ladder;
Install 167-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
-COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Exterior Door;
Replace 167-11-002 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Interior Lighting Modification 332-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR witness testing of newly installed equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
LAN Remove, Modify, Install 409-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -Unannounced inspections conducted by the COR.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Exterior Lighting;
Modify and Install 422-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR witness testing of newly installed equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Telephone System;
Remove and Install 432-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR visually inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Flooding Alarm Panel; test and repair 436-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR witness testing of newly installed equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Install Heater 511-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR witness testing of newly installed equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Unit Heater; replace 511-11-002 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Air Conditioning Unit; Install 514-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR witness testing of newly installed equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Storeroom Arrangement;
Accomplish 608-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Window; blank 624-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR review water hose test results.
-COR visually inspect completed work
- Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Superstructure Preservation;
631-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% COR inspect completed work.
-Unannounced inspections conducted by the COR and/or by (ACOR)
-COR review of final inspection report.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Fender; Replace 611-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR inspect newly installed equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Interior Compartment; clean and preserve 631-11-002 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Underwater Hull and Freeboard Preservation;
Accomplish 631-31-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Zincs; Replace 633-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Supratile Deck Tile;
install 634-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
CPARS.
In Addition, FAR 52.246-6 (f), (g) and (h).
Main Deck Exterior;
Preserve 634-11-002 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR inspect completed
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Bulkhead Insulation;
Repair 635-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Overhead ceiling;
Install 637-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR visually inspect completed work.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Office Furniture;
Provide 644-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR inspect furniture.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Towing Service;
Provide 992-11-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer
0% -COR inspect towing equipment.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Provide Temporary Services 992-11-002 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to
0%
-COR inspection for location of connections, fire alarm system components.
-Inspect protective deck covering.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Cleaning and Pumping;
992-31-001 meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer resolve problems
0% -COR inspect completed
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
Drydocking, Fleeting and Undocking;
meet the customer’s expectations of completed work.
On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)
How well the contractor responds to customer concerns and the approach used to resolve problems.
0% -COR witness events.
-Customer feedback
FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance
Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.
Negative: Performance will be documented on
| YFN 1288 QASP |
| QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) |
| YFN 1288 OVERHAUL AND MODERNIZATION |
| 1. PURPOSE |
| 2. AUTHORITY |
| 3. SCOPE |
| 4. GOVERNMENT RESOURCES |
| All deliverables covered by this contract |
| 7. DOCUMENTATION |
| QASP Matrix for YFN 1288 |
| Void; Clean, Inspect, and Preserve. |
| Watertight Hatch and Inclined Ladder; Install |
| Interior Lighting Modification |
| LAN Remove, Modify, Install 409-11-001 |
| Exterior Lighting; Modify and Install 422-11-001 |
| Telephone System; Remove and Install 432-11-001 |
| Flooding Alarm Panel; test and repair |
| 436-11-001 |
| Install Heater |
| 511-11-001 |
| Unit Heater; replace |
| Air Conditioning Unit; Install |
| 514-11-001 |
| Storeroom Arrangement; Accomplish 608-11-001 |
| Fender; Replace 611-11-001 |
| Bulkhead Insulation; Repair |
| Overhead ceiling; Install 637-11-001 |
| Office Furniture; Provide 644-11-001 |
| Towing Service; Provide 992-11-001 |
| Provide Temporary Services |
| 992-11-002 |
| Cleaning and Pumping; Accomplish |
| 992-31-001 |
| Drydocking, Fleeting and Undocking; Accomplish |
File details come from the government source that posted it.