Statement of Work (Specifications)

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Steam Boiler Rental, newest first.
File Type Posted
Amended_RFQ_Form_N3904019Q0138.pdf PDF
RFQ_Form_N3904019Q0138.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Mobile Steam Boiler Unit

One (1) Rental Mobile Steam Boiler** as a self‐contained mobile package that is capable of generating "saturated steam" at less than 150 PSIG, or controlled at/below 150 PSIG. Unit shall be capable of providing 600,000 BTU/HR. Package should include a No. 2 oil burner and burner management system that is capable of burning "ultra‐low sulfur transportation diesel oil". Unit may burn alternate fuel but vendor must provide fuel in such case. Mobile package should contain a steam boiler, boiler feed water system/ pump, a condensate return collection system, 300 feet of steam and condensate hoses rated for the full capacity and the greatest boiler outlet pressure for both the steam supply and the condensate return systems. On‐board double walled fuel oil tank, Electric power supply panel and breakers rated for the capacity of the onboard burner and burner management system, including the power demands of the boiler feed pump.

Unit transportation to and from the site at Submarine base Groton, CT.

Technical rep to explain/train/operate and set‐up and assist the government in hooking up the boiler steam hoses to our equipment.

Emergent technical assistance phone number and reasonable response time (12 hours or less) for technical assistance in case of improper operation of vendor's equipment.

Any required boiler chemical treatment.

Any and all required State approved safety features (i.e. safety pressure relief valves, low water cutout, over pressure protection, flame out sensors) State of Connecticut certification.

User will provide:

1) Any Electric power demands required including 110/220/208/440etc

2) Ultra‐low sulfur diesel transportation fuel.

3) Operators.

4) Notification to State of Connecticut air emissions compliance division of anticipated unit operation.

5) Security Escort for entrance on to the Submarine Base for drop‐off and pick‐up on the submarine Lower Base.

The contractor shall provide service within twelve (12) hours after notification by the Contracting Officer or his/her representative. In the event the machine cannot be returned to service within twenty‐four

(24) hours of notification, a replacement shall be delivered at no extra charge to the Government.

The contractor shall be responsible for equipment failure not arising out of abuse or negligence by the government.

**If industry is unable to provide one (1) self‐contained unit 600,000 BTU/HR the vendor may have the option to provide two (2) units at 300,000 BTU/HR upon engineering review.