N3904019Q0080_SOW_Redacted.pdf
PDF 271 KB Posted
- Attached to
- HPAC Removal and Reinstallation Federal contract opportunity
- Solicitation number
- N3904019Q0080
About this file
HPAC Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3904019Q0080_REQUEST_FOR_QUOTATION.pdf | ||
| N3904019Q0080_REQUEST_FOR_QUOTATION.pdf | ||
| N3904019Q0080_Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HIGH PRESSURE AIR COMPRESSOR (HPAC) REPLACEMENT
Spec #: 2018-21
Rev: Page 1 of 4
STATEMENT OF WORK
1. SCOPE
1.1. Title: Contractor shall provide services to assist Portsmouth Naval Shipyard (PNS) with replacement of XXXXXXXXXX High Pressure Air Compressors (HPACs) in accordance with NAVSEA technical requirements.
1.1.1. Unless indicated otherwise in this SOW, the Contractor shall provide all equipment, tools, materials/parts, consumables, PPE, and other items/services necessary to perform the work as specified.
1.2. Location of Work: Portsmouth Naval Shipyard, Kittery, ME
1.3. Identification: XXXXXXXXXXXX, supplied by the Advance Equipment Repair
Program (AERP).
2. REFERENCES
2.1. Submarine Maintenance Standard 5510-081-215, latest Rev/Chg
2.2. Technical Manual S9550-CR-MMA-010, latest Rev/Chg
2.3. HM&E Test Procedure 55150-3-7686, latest Rev/Chg
2.4. Work & Test Manual, latest Rev/Chg
2.5. Off-Yard Work & Test Manual, latest Rev/Chg
2.6. Standard Item 009-90 Technical Representative; provide
3. REQUIREMENTS
3.1. Contractor shall remove existing Model 5R5-75B HPACs installed shipboard.
Disassembly and reassembly will be required to facilitate offloading. Work will be in accordance with reference 2.1.
3.1.1. Contractor shall provide all components and soft goods required for disassembly.
3.1.2. Contractor shall provide technical recommendations to PNS Engineers for PNS work to disconnect ship’s electrical and fluid / mechanical systems to HPACs.
3.2. Contractor shall install AERP program supplied replacement XXXXXXXXX with PLC
HPACs. Disassembly and reassembly will be required to facilitate on loading. Work will be in accordance with reference 2.1.
3.2.1. Contractor shall provide all components and soft goods required for reassembly.
Rev: Page 2 of 4
3.2.2. Contractor shall provide technical recommendations to PNS Engineers for PNS work to reconnect ship’s electrical and fluid / mechanical systems to HPACs.
4. OTHER REQUIREMENTS
4.1. Contractor personnel assigned to this work must be briefed on all procedures, safety precautions, and technical aspects of applicable PNS instructions such reference 2.4 and
2.5.
4.2. Contractor personnel shall provide and use all personal protective equipment (PPE) required by PNS.
4.3. Contractor personnel will participate in pre-shift briefings as directed by PNS.
4.4. Contractor operating procedures are subject to review by the PNS Occupational Safety and Health Office and Naval Base local authorities.
4.5. PNS shall provide a copy of reference 2.3 to the contractor for review. A non-classified system diagram of the ships high pressure air system shall be provided to the contractor by PNS for information.
4.6. PNS shall de-energize, de-pressurize, and lock-out/tag-out the HPACs prior to contractor commencing shipboard work.
4.7. PNS shall provide necessary fluids required to refill and operate the HPACs, such as lubricating oil, coolant, additives, etc.
4.8. The contractor shall drain and refill all fluids from the existing and replacement HPACs as necessary to safely handle and transport.
4.9. The contractor shall ensure that all hazardous materials generated are turned over to PNS for disposal.
4.10. The use of mercury, mercury containing compounds, mercury containing equipment, and/or instruments containing mercury is prohibited.
4.11. PNS shall dispose of all hazardous materials generated by the contactor during execution of this contract.
4.12. The contractor shall break and remake all HPAC mechanical piping joints required to permit rigging and removal/installation.
4.12.1. The contractor shall identify any such joints to PNS in writing.
4.13. The contractor shall disconnect and reconnect all HPAC wiring and cable connections required to permit rigging and removal/installation.
Rev: Page 3 of 4
4.13.1. The contractor shall identify any such wiring and cable connections to PNS in writing.
4.14. PNS shall cut and refabricate all HPAC component welded piping joints required to permit rigging and removal/installation.
4.15. PNS shall provide all rigging services.
4.16. The contractor shall dispose of all non-hazardous contractor generated trade litter.
4.17. The contractor shall provide communications equipment between off hull and in-hull work locations.
4.18. PNS shall make all connections and removals from the Ship’s System as required.
4.19. PNS shall break and remake all connections to ship’s systems.
4.20. PNS shall complete all associated tests prerequisite to reference 2.3.
4.21. PNS will accomplish valve lineups of ship’s system valves.
4.22. The contractor shall provide equipment to contain mechanical joints to avoid leakage onto or into the ship, dry-dock, or surrounding environment.
4.23. The contractor shall accommodate machinery mount replacement by PNS personnel during installation of AERP asset.
4.24. PNS shall replace any associated machinery mounts as required by the
Availability Work Package (AWP).
4.25. PNS shall accomplish all insulation resistance checks between the interconnected motors and controllers in accordance with reference 2.3.
4.26. PNS shall establish, maintain, and adjust cooling water supply to the HPACs as required by the HM&E Test Procedure.
4.27. PNS shall establish, maintain, and adjust the 700 psi air supply required for startup of the HPACs.
4.28. PNS shall establish and maintain proper ships ventilation and hull openings to prevent pulling vacuum in the engine room during HPAC operational testing.
5. NOTES
5.1. PNS shall crate and ship offloaded HPACs to AER Program refurbishment destination.
5.2. PNS shall receive HPACs from AER Program and provide to contractor.
5.3. Growth in scope of work is possible.
Rev: Page 4 of 4
6. GOVERNMENT FURNISHED MATERIAL
TOTAL QTY.
PROVIDED
NAME OF
PART
PIECE
NO.
REF.
NO.
NATIONAL
STOCK NO.
NOTES
(0-2)*
HPAC –
XXXXXXX
N/A N/A XXXXXXXX
PORT
and/or
STBD
HPACs
*TBD by SUBMEPP at final planning meeting
7. SECURITY REQUIRMENTS
7.1. All contractor personnel must be US citizens of good standing, able to obtain security clearances required to work in the ship’s Engine Room at PNS, Naval Base Point Loma, and Naval Submarine Base New London.
8. ATTACHMENTS
8.1. none
File details come from the government source that posted it.