Attachment_1_-_Manlift_QASP.doc
DOC document 45 KB Posted
- Attached to
- Manlift Rental Federal contract opportunity
- Solicitation number
- N39040-15-T-0322
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_1_JLG_drawing.pdf | ||
| Attachment_3_-Contract_Admin_Plan.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N39040-15-x-xxxx Attachment xx-QASP
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
for Rental of Man-lift Scaffolding
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Statement of Work standards included in this contract and in subsequent task orders issued there under. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2. AUTHORITY
Authority for issuance if this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, and FAR 52.212-4(m), Termination for cause and documentation called for in the contract to be accomplished by the Contracting Office or his duly authorized representative.
3. SCOPE
The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan.
4. GOVERNMENT RESOURCES
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5. RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - The COR is responsible for assuring proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action. The COR will serve as the Quality Assurance Evaluator (QAE).
Technical Point of Contact (TPOC) – The TPOC is responsible for monitoring contractor’s schedule and technical compliance and provide performance assessment inputs to the COR in assigned areas. The TPOC is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP.
Customer Feedback – Customer feedback may be obtained from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR.
Inspections – Each phase of the services rendered under the contract is subject to Government inspection during the Contractor’s operations and after completion of a task. Inspections may be routine functions performed by the COR. Government inspections may be conducted in an unannounced manner by the COR. The COR shall maintain a Contract Discrepancy Report (CDR), a copy of which will be provided to the Contractor. Within three days, the Contractor shall reply in writing to CDR(s) by stating reason(s) for unsatisfactory performance(s) and shall identify the corrective action(s) that will be taken to prevent recurrence(s).
7. IDENTIFIED QUALITY ASSURANCE SURVEILLANCE ITEMS
The following Performance Work Statement (PWS) items are identified within the Solicitation and are to be monitored under this QASP.
Rental of Man-lift Scaffolding
Performance Standard
Quality - The contractor’s ability to service or replace inoperable equipment and provide signed and dated by the servicing technician documentation as outlined in the PWS section B 6 & 7.
The contractor’s ability to schedule and provide quarterly maintenance and inspections of the equipment and provide signed and dated by the servicing technician record of service as outlined in the PWS Section B 5.
The contractor’s ability to keep up-to-date inspection records with the equipment at all times.
Timeliness – Contractor shall provide forty-eight hour notification to the government prior to performing Preventative Maintenance (PM) on the equipment.
Contractor shall in the event of a breakdown of equipment provide service within four (4) hours of notification to the contractor of the breakdown.
Contractor shall, in the event the equipment cannot be returned to service within twenty four (24) hours of breakdown, causes work stoppage or major disruption to schedule, provide a replacement.
Responsiveness – Contractor’s ability to respond to unforeseen issues that may arise as a result of contract performance.
Maximum Error Rate – Quality – 0%
Timeliness – 0% Responsiveness – 0%
8. DOCUMENTATION
The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract. Information in the Quality Assurance file will be considered when completing the annual Contractors Performance Assessment Reporting Systems report.
9. ATTACHMENTS
Attachment A – QASP Matrix