Statement_of_Work_-_Attachments_1_and_2.pdf

PDF 110 KB Posted

Attached to
Demineralized Water Services Federal contract opportunity
Solicitation number
N39040-15-T-0311
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment 1 and 2 Statement of work and full specifications.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT #1

JML DOC: 5051 V009

SPECIFICATIONS FOR

DEMINERALIZED WATER DELIVERY SERVICE

AT NRMD- POINT LOMA

1. This specification describes the minimum equipment and related vendor services necessary to meet the Naval Regional Maintenance Department-Point Lorna (NRMD-PL) demineralized water needs.

1.1 Equipment: The following equipment is considered to constitute a Demineralized Water Delivery System. See Section 2 for additional equipment requirements.

Item Equipment Description

0001 Pretreatment Activated Carbon Filter Units (see NOTE)

0002 Primary Demineralizer Units (see NOTE)

0003 Monitoring Unit

NOTE: The Contractor must provide the appropriate amount of units to meet the water chemistry requirements specified in paragraph 2.1.2 Table II. The price associated with this equipment shall reflect the monthly price to rent the system, regardless of the number of these units needed to produce the required water quality.

1.2 Services: The following services are to be provided. See Section 3 for additional service requirements.

Item Service Description

0004 Demineralized water (effluent) meeting the water chemistry requirements of paragraph 2.1.2 Table II

0005 Sample analysis test report to prove that the Water Delivery System meets the quality requirements of paragraph 2.1.2 Table II.

0006 Water Delivery System Operating Procedures.

0007 On-Site Training.

2. Equipment Requirements:

2.1 The Water Delivery System shall be capable ofproducing water that meets the specification of Table II, without soaking/flushing (for Carbon Filter units) or flushing (for Demineralizer units) by NRMD-PL personnel, when the following utilities are connected:

• Electrical power (110-120 volt, 60 hertz, 1 phase) for operation of the conductivity meter and alarms.

SHEET 1 of6

• Fresh water to be processed, meeting the specification of Table I.

2.1.1 The influent fresh water is supplied by San Diego city (Alvarado) water system.

Table I shows the expected mineral content of this water supply. NRMD-PL will provide samples to vendors for independent testing prior to bid if desired.

TABLE I

INFLUENT WATER QUALITY

Specification Expected Value Specification Expected Value pH at 25 °C 8.3 Sulfate 142.0 mg/1 (ppm)

Conductivity at 25 °C 834.0 J.Ullho/cm Iron None Detectable

Chloride 86.2 mg/1 (ppm) Nitrate 1.09 mg/1 (ppm)

Silica 10.5 mg/1 (ppm) Manganese 0.86 mg/1

Total Hardness (CaC03) 219.0 mg/1 (ppm) Phosphate 0.165 mg/1 (ppm)

Total Alkalinity 118.0 mg/1 (ppm)

2.1.2 The quality ofthe effluent water processed specified in Table I through the demineralizer system must meet the requirements specified in Table II without flushing by NRMD-PL personnel.

TABLE II

DEMINERALIZED WATER DELIVERY SYSTEM EFFLUENT

Specification Required Range I Limit pH at 25 °C 6.0- 8.0 (see NOTE)

Conductivity at 25 °C 1.0 J.Lmho/cm (maximum)

Chloride 0.1 ppm (maximum)

Silica 0.2 ppm (maximum)

Halogenated Organics 0.1 ppm (maximum)

Total Organ Carbon 2.0 ppm (maximum)

Visual Clarity No turbidity, oil, sediment, or resin beads.

NOTE: The pH requirement is waived for water with conductivity less than 0.25 J.lmho/cm.

SHEET2 of6

2.2 Pretreatment Activated Carbon Filter and Primary Demineralizer units shall meet the following requirements (for the purpose of this contract a group of one or more units is considered to be a rig):

2.2.1 Each individual unit shall be provided with interconnecting manifolds and hoses · as required to function as a single/self-contained rig. The number of rigs (or units) used should be chosen such that the requirements of paragraph 2.1.2 and

2.2.5 can be met.

2.2.2 Each individual unit shall be designed to operate at a variable flow rate from 0 to 30 GPM. These units shall be capable of operating at the required flow rates with influent fresh water supply pressure ranging from 20 to 140 psig.

2.2.3 Each individual unit shall be constructed so the differential pressure from the inlet connection to the outlet connection is a maximum of 15 psi at the maximum rated flow.

2.2.4 Each individual unit shall be provided with a high point vent line and a low point drain/sample line.

2.2.5 All demineralizer rigs shall be capable of producing a minimum of 50,000 gallons of demineralized water before depletion of the resin.

2.2.6 Each individual Carbon Filter unit shall have an attached label or tag which identifies that the Carbon Filter unit has been pre-soaked prior to shipment and provides the date that the unit was pre-soaked.

2.2.7 All inlet/outlet connections to Carbon Filter and Demineralizer rigs shall have 2- 112" NH fire hose thread connections.

2.2.8 All valves and connections on the equipment (to be operated by NRMD-PL personnel) shall be prominently marked, such as "sample valve" or "inlet".

2.2.9 Spare equipment for components that may experience failure (which would result in the interruption of water production) shall be staged to support emergency trouble shooting/maintenance.

2.2.1 0 Each rig (or unit) shall be skid or panel mounted to be easily movable by forklift or installed on trailers that can be towed. Each separate unit shall have a unique identification marking, such as a numeric or alphanumeric identification number.

2.2.11 Each pressure vessel used in the rigs shall be designed, fabricated, tested and inspected in accordance with the ASME Code for the service intended and with the specific design criteria listed. When delivered for use, the pressure vessels shall bear the ASME Code Symbol Stamp of an authorized fabricator. Any repairs made to the stamped pressure vessel shall be performed in accordance with the appropriate ASME codes. Any structurally repaired pressure vessel shall be recertified by an inspector authorized to certify ASME code stamped pressure vessels.

2.2.12 All equipment must be capable of withstanding use in a marine environment (e.g.

saltwater spray) on piers in all seasons and be rugged enough to withstand frequent handling/moving. Materials of construction shall be corrosion resistant.

SHEET3 of6

2.3 The Water Delivery System shall contain a Monitoring Unit which shall consist of (but not be limited to) the following items:

2.3 .1 A laboratory calibrated conductivity meter with a 0 - 10 J.Lmho/cm reading range or equivalent shall be located in the system outlet line. The conductivity meter shall be labeled with a calibration sticker or tag (see paragraph 3.1.8).

2.3.2 The Monitoring Unit shall have an audible (preferred but not required) and visible high conductivity alarm. In the event effluent conductivity exceeds 1.0 J.Lmho/cm, an audible alarm (if installed) shall activate (recommended to be 100 dB minimum at 10 feet) and a visible indicator light alarm shall flash.

2.3 .3 A calibrated flowmeter/totalizer for demineralized water production billing. The totalizer shall be labeled with a calibration sticker or tag (see paragraph 3.1.8).

2.3.4 A flush/sample valve.

2.3.5 A 80 micron or finer outlet strainer to prevent resin migration.

3. Service Requirements and Contractor Responsibilities:

3.1 The Contractor Shall be liable for the following Water Delivery System responsibilities:

3 .1.1 The Contractor shall deliver the required equipment listed in section 1.1 and perform maintenance/regeneration as necessary to ensure the equipment is in a fully operational condition.

3.1.2 Rigs shall be delivered to the designated NRMD-PL staging area as determined by the NRMD-PL Pure Water Supervisor (see paragraph 4.1).

3.1.3 The Contractor shall provide an on-site maintenance schedule to NRMD-PL as part of the Water Delivery System operating procedures (see paragraph 3.4). The on-site maintenance schedule should be based on either pre-determined flow totalizer readings or a pre-determined month to month schedule.

3.1.4 The Contractor shall coordinate with the NRMD-PL Pure Water Supervisor prior to performing any repairs or maintenance (see paragraph 4.2). Contractor operation of Shipyard owned equipment is not authorized at any time.

3.1.5 Contractor repairs shall normally be accomplished during scheduled on-site maintenance. However, a Contractor provided technician/representative shall be available for emergency contact (24 hours a day, seven days a week), to respond to equipment failure, bad water quality, depleted units, etc. When the Contractor representative is requested on-site, response time shall be within 4 hours from the time of the call unless otherwise extended by NRMD-PL.

3 .1.6 Newly refreshed/regenerated units shall be provided to replace depleted units within 24 hours ofNRMD-PL written or oral request (more time may be allowed if properly communicated/coordinated with the NRMD-PL Pure Water Supervisor). These units shall be provided with all charcoal fines/regeneration chemicals flushed out and inlet/outlet connections closed and capped.

SHEET 4 of6

JML DOC: 5051V009

3 .1. 7 Depleted units shall not be refreshed/regenerated at NRMD-PL and are to be returned to the Contractor's facility following replacement with a new unit (as described in paragraph 3 .1. 6). No billing charges shall accrue for depleted units remaining at NRMD-PL. These depleted units should be refreshed/regenerated at the Contractor's facility to support future unit replacements. The Contractor shall comply with all federal, state, and local environmental protection regulations during unit refreshing/regeneration. All resin regeneration chemicals shall be rinsed from the resin prior to being transferred to NRMD-PL for installation.

3.1.8 Additional equipment for repairs of deficient equipment (as necessary) is to be provided within seven days after being requested by NRMD-PL.

3.1.9 The Water Delivery system outlet conductivity meter and totalizer shall be calibrated per the manufacturer's suggested schedule or annually whichever occurs first. At this time, the calibration labels required by paragraphs 2.3.1 and

2.3.3 should be updated with the date the calibration was performed and the next required calibration date.

3.2 The Contractor shall read and record the Water Delivery System flowmeter/totalizer readings at monthly intervals to determine the amount of water processed. A monthly bill to NRMD-PL shall be generated based on this flowmeter/totalizer reading and the agreed upon pricing for water delivery. ·

3.2.1 The contractor shall provide documentation of maintenance performed during the month.

3.3 A sample analysis test report shall be generated by the Contractor and provided to the NRMD-PL Pure Water Supervisor prior to water production following initial Water Delivery System setup and after the replacement of depleted rigs. This report shall include quantitative verification that requirements of paragraph 2.1.2 are met.

3.4 Contractors shall furnish written procedures for the operation of Contractor owned equipment to the NRMD-PL Pure Water Supervisor. Procedures are also to be provided prior to the initial shipment of equipment (for NRMD-PL review) and a copy shall be clearly posted on a weatherproof placard/binder with the Monitoring Unit.

These procedures must include the following:

3.4.1 Instructions for initial startup of the Water Delivery System.

3.4.2 Instructions for restarting idled portions of the Water Delivery System.

3.4.3 Emergency troubleshooting steps and emergency on-site maintenance that are expected to be carried out by NRMD-PL personnel.

3.4.4 A system drawing and parts list which shows Contractor provided equipment and which also identifies spare components staged for emergency maintenance.

3 .4.5 An outline and a schedule of Contractor provided on-site maintenance.

3.4.6 Any additional information pertinent to operation of the system.

3.5 The Contractor shall provide annual on-site training to NRMD-PL personnel responsible for the operation of Contractor owned equipment. Training shall cover the

SHEET 5 of6

Contractor provided procedures discussed in paragraph 3.4 (see paragraph 4.5 for related NRMD-PL responsibilities regarding training).

3.6 Provide Material Safety Data Sheets (MSDS) for the charcoal filter media and demineralizer resin beads to the NRMD-PL Pure Water Supervisor. Copies of these MSDS are also to be posted with the operating procedures (posted by paragraph 3.4).

4. NRMD-PL Personnel Responsibilities:

4.1 The NRMD-PL Pure Water Supervisor shall determine the location for Contractor provided equipment and the length of time the equipment will be required at the site.

The Pure Water Supervisor shall also determine the location for a 1000 square foot designated staging area. This location should then be communicated to the Contractor (see paragraph 3.1.2).

4.2 The NRMD-PL Pure Water Supervisor will assist the Contractor in preparing the Water Delivery System to support Contractor maintenance. The NRMD-PL is required to put the system in a safe condition prior to allowing any maintenance to be conducted.

4.3 Final Water Delivery System effluent connection hoses and related fittings shall be furnished by NRMD-PL. NRMD-PL Personnel shall also be responsible for the connection and disconnection of these hoses.

4.4 NRMD-PL Personnel that have received the Contractor provided training.shall operate the Water Delivery System per Contractor's procedures. These personnel shall also perform minor emergency repairs on Contractor supplied equipment within the scope of provided training and operating procedures.

4.5 The NRMD-PL Pure Water Supervisor shall ensure an adequate number of personnel have received the annual Contractor provided training specified in paragraph 3.4.

NRMD-PL Pure Water Supervisor should also work with the Contractor to schedule the time and location for this on-site training.

4.6 Influent water samples shall be provided to potential vendors by NRMD-PL for the purposes of independent testing prior to bid (if desired).

SHEET6 of6

REQDOCNO.- 5051V009R1 ATTACHMENT ---

CONTINUATION SHEET CONTRACT NO.- PAGE

NAME OF OFFER OR/CONTRACTOR

--~~~j ____________________________________________________________________________________________________ _ liTEM# SUPPLIES/SERVICES QTY U/I

PURE WATER SERVICES 1 JO

C. DESCRIPTION/SPECIFICATIONS.

C.l. PROVIDE DEMINERALIZED WATER DELIVERY SERVICES AT NRMD

POINT LOMA FOR THE PERIOD 10-1-2015 TO 3-31-2017, PER

ATTACHMENT 1.

C.2. C528 SPECIFICATION CHANGES.

D. PRESERVATION/PACKAGING/PACKING.

D.l. D4 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED).

E. INSPECTION AND ACCEPTANCE.

E.1. E2 INSPECTION AND ACCEPTANCE (DESTINATION).

E.2. G505 VENDOR DISPOSITION OF NON CONFORMING MATERIAL.