04.HRMC-022-24_PWS_Redacted.pdf
PDF 479 KB Posted
- Attached to
- YRBM 52 Q2 Federal contract opportunity
- Solicitation number
- N32253-24-R-0008
About this file
This document outlines specifications for work to be accomplished on the YRBM 52 barge. The specifications cover standard items for cleaning, maintenance, repair, and replacement of various barge systems and components. Work includes upgrading lighting, inspecting and testing alarms and communications, cleaning ventilation, replacing valves and gauges on piping, inspecting and servicing fire suppression, and conducting a deep clean of interior spaces. The solicitation number for this work is N32253-24-R-0008 and is being conducted by the Department of the Navy Naval Sea Systems Command.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
HAWAII RMC PEARL HARBOR HI
YRBM 52 (RMC 20414)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: HRMC-022-24
INCLUDES ALL CHANGES THROUGH 12/1/2023
INDEX
SHIP: YRBM 52 (RMC 20414) HRMC-022-24
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-24 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 09/27/2022 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 09/27/2022 Original
009-03 Toxic and Hazardous Substance; control 09/27/2022 Original
009-04 Quality Management System; provide 09/27/2022 Original
009-05 Temporary Access; accomplish 09/27/2022 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
09/27/2022 Original
009-07 Confined Space Entry, and Certification; accomplish 09/27/2022 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 02/28/2023 CH-1
009-10 Asbestos-Containing Material (ACM); control 09/27/2022 Original
009-18 Mine Warfare Ships Magnetic Material; control 09/29/2022 Original
009-19 Provisioning Technical Documentation (PTD); provide 09/27/2022 Original
009-20 Government Property; control 09/27/2022 Original
009-21 Logistics and Technical Data; provide 09/27/2022 Original
009-23 Interference; remove and install 09/29/2022 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/27/2022 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/27/2022 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
09/27/2022 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
09/27/2022 Original
009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage 09/30/2022 Original
009-61 Shipboard Use of Fluorocarbons; control 09/27/2022 Original
009-67 Integrated Total Ship Testing; manage 09/27/2022 Original
009-69 Heavy Weather/Mooring Plan; provide 09/27/2022 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/27/2022 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 09/30/2022 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/30/2022 Original
009-74 Occupational, Safety and Health Plan; accomplish 09/30/2022 Original
009-80 Ship Facilities; maintain 09/27/2022 Original
009-81 Compartment Closeout; accomplish 09/30/2022 Original
009-82 Installation of Equal Component Vice Specified Component; report 09/27/2022 Original
009-84 Threaded Fastener Requirements; accomplish 09/30/2022 Original
009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify
09/27/2022 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
09/27/2022 Original
009-99 Ship Departure Report; provide 09/27/2022 Original
ITEM_NO. TITLE CHANGE DATE CHANGE
009-100 Ship's Stability; maintain 09/30/2022 Original
009-101 Ship Transit and Berthing; accomplish 09/27/2022 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/27/2022 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/27/2022 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/27/2022 Original
009-111 Schedule and Associated Reports for non-CNO Availabilities; provide and manage
09/30/2022 Original
009-117 Combat Systems, Light-Off Suport; provide 09/30/2022 Original
009-118 CG Deck Loading; accomplish 09/27/2022 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/30/2022 Original
009-122 Temporary Padeye; install and remove 09/30/2022 Original
009-125 Boats Less Than 65 Feet Long; accomplish 10/25/2022 Original
099-01PH Waste Generated on Government Property, including Satellite Accumulation area (SAA), Managing and Disposing of Hazardous Waste (HW) and non-HW;
accomplish
01/20/2023 Original
099-02PH Dry Dock Requirement; accomplish 01/20/2023 Original
099-03PH Additional Environmental Requirements; accomplish 01/20/2023 Original
099-04PH Industrial Wastewater/Oily Wastewater Disposal; accomplish 01/20/2023 Original
099-007PH Radiological Fallout Controls; accomplish 07/13/2023 CH-3
099-08PH Safety of Ship Requirement; provide 11/03/2023 CH-6
099-40PH Additional Requirements for Contractor Cranes, Multi-Purpose machine, and
Material Handling Equipment at Joint Base Pearl Harbor Hawaii; accomplish
01/17/2023 Original
099-69PH Pier Laydown for Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF)
Availability; accomplish
10/20/2023 CH-4
CATEGORY II. FY-24 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-09 Process Control Procedure (PCP); provide and accomplish
09/27/2022 Original
009-12 Weld, Fabricate, and Inspect; accomplish 09/27/2022 Original
009-13 Meter, Gauge, Switch, and Thermometer; repair 09/27/2022 Original
009-32 Cleaning and Painting Requirements; accomplish 09/29/2022 Original
009-50 Horizontal Swing Check Valve; repair 09/27/2022 Original
009-71 Piping System; test 09/27/2022 Original
009-87 Chemical disinfection Procedures; accomplish 09/27/2022 Original
009-90 Technical Representative; provide 09/27/2022 Original
009-107 Piping System Cleanliness Restoration and Flushing
(Non-Nuclear); accomplish
09/27/2022 Original
ITEM NO. TITLE
Hazardous Waste Produced on Naval Vessels; control077-11-001
Light Fixture Upgrade; accomplish330-11-001
Phone, 1MC System; inspect and test433-10-001
Fire and Flooding Alarm System; inspect, test, and troubleshoot436-11-001
Ventilation Cleaning; accomplish512-11-001
Back Flow Preventer, Valves; replace533-11-001
Potable Water Pressure Gauge; replace, calibrate, and certify533-11-002
Aqueous Potassium Carbonate (APC) Fire Extinguishing System; replace and certify
555-11-001
CHT Piping and Component Repairs; accomplish593-11-001
Accommodation Ladder; inspect and test611-11-001
Deep Clean; accomplish992-11-001
SHIP: YRBM 52 (RMC 20414) ITEM NO: 077-11-001
COAR: 16 PCN: SERV-L104
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 5 ITEM NO: 077-11-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or
SHIP: YRBM 52 (RMC 20414)
SSP: HRMC-022-24 2 of 5 ITEM NO: 077-11-001 structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ __________
SSP: HRMC-022-24 3 of 5 ITEM NO: 077-11-001
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Rust Preventative)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ __________
Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, _____ ____________ __________ cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludges (Contaminated with _____ ____________ __ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Lube/Fuel Oil Soaked Rags _____ ____________ __________
Paint/Flakes (Pressure Washing _____ ____________ __________
Ext Hull Surfaces)
Fuel Oil(Residual) _____ ____________ __________
Bilge Water _____ ____________ __________
SSP: HRMC-022-24 4 of 5 ITEM NO: 077-11-001
Oil/Water _____ ____________ __________
AFFF/Water _____ ____________ __________
MEK Contaminated Rags _____ ____________ __________
3.5.1 Provide zero dollars for managing and disposing of all
hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.
3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
SSP: HRMC-022-24 5 of 5 ITEM NO: 077-11-001
4.2.2 Reference to a Material Safety Data Sheet (MSDS), or
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 330-11-001
COAR: 16 PCN: SERV-L116
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 3 ITEM NO: 330-11-001
1. SCOPE:
1.1 Title: Light Fixture Upgrade; accomplish
1.2 Location of Work:
1.2.1 Throughout
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 NAVSEA WARFARE CENTERS Philadelphia Directive dated Dec 2011, Fluorescent Lighting Re-Wiring Bulletin for Legacy MIL-DTL-16377/8, 11, 12, 73, 74, 75 Fluorescent Lighting Fixtures retrofitted with EFO-X024 Lamps as replacements for F20T12 Fluorescent Lamps
2.3 MIL-DTL-16377 Rev J, Fixtures, Lighting; and Associated Parts;
Shipboard Use, General Specification For
2.4 303-6907698 Rev A, Lighting System Installation
2.5 645-6907722 Rev B, General Arrangement
2.6 803-5184170, Lighting on Naval Ships
2.7 804-5959312 Rev A, Berth, Modular, Lighting HT
3. REQUIREMENTS:
3.1 Accomplish the removal of all existing fluorescent light bulbs, modify wiring, and install new LED bulbs to all existing interior lighting system located in 1.2, in accordance with 2.2 and 2.3, using 2.4 and 2.7 for guidance as follows:
3.1.1 Modify 133-each SYM 77.4 and 266-each SYM 333.1, 24-inch fixtures of 2.4 for the installation of a total of 1,064-each bulbs.
Provide an additional 500-each spare bulbs to the Barge Program via the SUPERVISOR.
3.1.2 Provide and install a total of 126-each red filter tubes for new LED bulbs. New red filter tubes shall not allow any white light leaking from pass the ends of the LED bulbs. Turn over excess tubes to the Barge Program via the SUPERVISOR.
3.1.3 Modify 169-each SYM 232.1, 12-inch bunk light fixtures of 2.4 for the installation of new LED bulbs. Provide an additional 90-each spare bulbs to the Barge Program via the SUPERVISOR.
3.1.4 Modify 30-each SYM 351, 18-inch fixtures of 2.4 for the installation of new LED bulbs. Provide an additional 30-each spare bulbs to the Barge Program via the SUPERVISOR.
3.2 Accomplish the removal of existing incandescent light bulbs/fixtures and install new wiring, and install new LED bulbs/fixtures located in 1.2 in accordance with 2.2 and 2.3 using 2.4 through 2.5 for guidance as follows:
SSP: HRMC-022-24 2 of 3 ITEM NO: 330-11-001
3.2.1 Modify a total of 122-each lantern SYM 101.2 of 2.4 to accept White LED Retrofit Kit, NSN 6230-01-531-7844.
3.2.2 Remove existing and install new a total of 30-each SYM 92.3, color lens: white, exterior light fixtures similar to Small LED Globe from Energy Focus or equal. Provide an additional 40-each spare fixtures to the Barge Program via the SUPERVISOR.
3.2.3 Remove existing and install new a total of 10-each SYM 303.3 exterior flood light fixtures similar to Waterline Security Lights from Energy Focus or equal. Provide an additional 20-each spare fixtures to the Barge Program via the SUPERVISOR.
3.3 Accomplish the removal of a total 36-each existing fluorescent light bulbs, modify wiring, and install new LED bulbs to all existing 4-foot exterior lighting system located under the MWR awning located on the 03 Level using 2.4 through 2.5 for guidance as follows:
3.3.1 New bulbs shall be 6500K in color temp.
3.3.2 New bulbs shall not be electrically powered on one end only.
3.3.3 Remove all existing light fixture support structure and fabricate and install new support structure in accordance with 2.6 and sheets E4 and E5.
(V)(G) "OPERATIONAL TEST"
3.4 Accomplish an operation test of equipment installed in 3.1 through
3.3.2 upon completion of new installation. Cycle 3 time, in both 1'on" and "off'' positions to ensure proper operation.
3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface
4. NOTES:
4.1 Possible source of LED bulbs: 24-inch. 18-inch, and 12-inch T5 MIL lntellitube bulbs of paragraphs 3.1 through 3.1.4 from:
Energy Focus
888-889-1776 www.eneryfocus.com federal@eneryfocus.corn
4.2 Possible source of lantern kit NSN 6230-01-531-7844 in paragraph
3.2.1 is from:
Jay Moulding Corporation
7 Bridge Avenue
Cohoes, NY 12047
(518) 237-4200
(518) 237-6576 (fax) info@jaymoulding.com model: JMCLED-4W
4.3 Possible source of LED fixtures of paragraphs 3.2.2 and 3.2.3 from:
Energy Focus
SSP: HRMC-022-24 3 of 3 ITEM NO: 330-11-001
888-889-1776 www.eneryfocus.com federal@eneryfocus.com
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 433-10-001
COAR: 16 PCN: SERV-L107
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 433-10-001
1. SCOPE:
1.1 Title: Phone, 1MC System; inspect and test
1.2 Location of Work:
1.2.1 Throughout Barge
1.3 Identification:
1.3.1 1MC System
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 113-8507827, Phone Upgrade Rack Foundation Install
2.3 302-8516170 Rev A, Power System Modifications 1MC System Upgrade
2.4 401-8519261, General Announcing System CKT "1MC" Installation
2.5 401-8516570, IC CKT J Removal For Phone Upgrade
2.6 0967-LP-000-0110, Electronics Installation and Maintenance Book
2.7 MIL-STD-1310, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety
2.8 DoD-STD-2003, Electric Plant Installation Methods
3. REQUIREMENTS:
3.1 In accordance with the requirements of 009-90 of 2.1, provide the services of a qualified Technical Representative to accomplish the inspection of the barge General Announcing System CKT "1MC", and associated cabling and equipment using 2.2 through 2.7 for guidance.
3.1.1 Accomplish the inspection of the barge General Announcing System CKT "1MC", and associated cabling and equipment using 2.2 through 2.7 for guidance.
3.1.1.1 Submit one legible copy, in hard copy or approved
transferable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR. Report shall include repair recommendations, material requirements, material and labor cost, and material availability.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish an operational test of the CKT "1 MC" Announcing system, using 2.2 through 2.7 for guidance.
3.2.1 Call to and from each station to verify proper transmission and receiving.
3.2.2 Verify each station called agrees with the information on the label plate of the call station operated.
3.2.3 Verify circuits for audio output and clarity of voice
transmission. Allowable cross-talk: None.
3.2.4 Submit one legible copy, in hard copy or approved transferable
SSP: HRMC-022-24 2 of 2 ITEM NO: 433-10-001 media, of a report listing results of the requirements of 3.2 to the
SUPERVISOR.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 436-11-001
COAR: 16 PCN: SERV-L106
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 436-11-001
1. SCOPE:
1.1 Title: Fire and Flooding Alarm System; inspect, test, and troubleshoot
1.2 Location of Work:
1.2.1 Throughout Barge
1.3 Identification:
1.3.1 Quantity (One EA): Fire and Flood Alarm System
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 401-8784296, Install Addressable Fire & Flooding Alarm System
2.3 401-8784295, Remove Fire & Flooding Alarm System
2.4 401-8784297, Miscellaneous Alarm System Upgrade
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1 to provide the services of a qualified technical representative to accomplish testing, troubleshooting, and reprogramming of the Fire and Flooding Alarm System located in 1.2, listed in 1.3, using 2.2 through 2.4 for guidance.
3.1.1 The technical representative shall be an Original Equipment Manufacturer (OEM) of Siemens Building Technologies.
3.1.1.1 Submit one legible copy, in electronic media, of a
report listing the results of 3.1. Report shall include repair recommendations, material requirements, material and labor cost, and material availability.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish an operational test of the repaired Fire and Flooding Alarm Systems to ensure that equipment functions to designed sequence of operation in accordance with 2.2 through 2.4.
3.2.1 Circuits shall be inspected and verified for correct fusing, phasing and circuit breakers. Record results.
3.2.2 Indicator lights shall show and maintain a bright and steady glow when activated, alarms shall sound in main and remote locations as required. Record results.
3.2.2.1 Submit one legible copy, in electronic media, of a
report listing the results of 3.2 to the SUPERVISOR, within 48 hours of test completion. Report shall include a list of devices tested and their location.
4. NOTES:
4.1 None.
SSP: HRMC-022-24 2 of 2 ITEM NO: 436-11-001
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 512-11-001
COAR: 16 PCN: SERV-L108
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 512-11-001
1. SCOPE:
1.1 Title: Ventilation Cleaning; accomplish
1.2 Location of Work:
1.2.1 Throughout
1.3 Identification:
1.3.1 Quantity (One EA), Exhaust Ventilation System
1.3.2 Quantity (One EA), Supply Ventilation System
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 501-6907691 Rev A, HVAC Arrangement Galley 1-49-2-Q
2.3 501-6907692 Rev C, HVAC Arrangement 2nd Deck
2.4 501-6907693 Rev B, HVAC Arrangement Main Deck
2.5 501-6907694 Rev B, HVAC Arrangement 01 Level
2.6 501-6907695 Rev B, HVAC Arrangement 02 and 03 Level
2.7 NAVSEA Letter, 9514 SER 9210 / 021 Dated 20 May 2009 Dry Ice Cleaning of Ventilation Ducts
3. REQUIREMENTS:
3.1 Accomplish cleaning of ventilation systems, using dry ice or CO2 ice clean process, located throughout the barge from the hold to 03 level exterior ventilation hoods to the last ventilation diffuser of each run of the supply and exhaust system as shown in 2.2 through 2.6, in accordance with 2.7 and as directed by the SUPERVISOR.
3.1.1 Accomplish the requirements of 009-09 of 2.1 for submittal of Process Control Procedure (PCP) for approval by SUPERVISOR prior to start of work.
3.1.2 Matchmark and remove ventilation access plates as required to allow access for cleaning operations. Retain ventilation parts and fasteners for reuse.
3.1.2.1 Access cuts shall be approved by the SUPERVISOR to allow for cleaning and inspection of inaccessible areas.
3.1.3 Clean interior surfaces free of loose rust, dirt, grease, lint and other foreign matter.
3.1.4 Replace with new a total of 20-each air filters in accordance with 2.6 (Items 9 and 10), 2.5 (Item 5), 2.4 (Item 4), 2.3 (Items 56 and 57).
(V)(G) "CLEANLINESS INSPECTION"
3.2 Accomplish a visual inspection after cleaning of interior surfaces of each ventilation system branch line listed in 1.3 for verification of cleanliness and completion of work prior to installation of access
SSP: HRMC-022-24 2 of 2 ITEM NO: 512-11-001 plates. Method for inspection shall be visual and with the use of a boroscope. Accept criteria for cleanliness shall be in accordance with paragraph 3.1.3.
3.2.1 Submit one legible copy, in approved tranferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
3.3 Install matchmarked ventilation components removed in 3.1.2, using retained fasteners and using 2.2 through 2.6 for guidance. All flanged joints removed shall be reinstalled using new rubber gaskets.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 533-11-001
COAR: 16 PCN: SERV-L112
SERV-L114
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 533-11-001
1. SCOPE:
1.1 Title: Back Flow Preventer, Valves; replace
1.2 Location of Work:
1.2.1 CHT Pump Room (2-38-2-E)
1.2.2 Officer Lounge (2-18-0-L)
1.3 Identification:
1.3.1 Quantity (One EA): 1-1/2" Backflow Preventer, Bronze, NSN# 9C4820-01-212-0671, Item F-132 of 2.2 shown on sheet 8, Zone 58-E.
1.3.2 Quantity (One EA): 1-1/2" Inlet Gate Valve, Bronze, Item V-19, L-21 of 2.2.
1.3.3 Quantity (One EA): 2-1/2 Gate Valve, Bronze, Item V-12
(including flange #150, F-57) of 2.2.
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 509-6907744 Rev B, Fresh Water System Fresh Water Arrangement Main Deck and Below
3. REQUIREMENTS:
3.1 Mechanically remove and replace with new Backflow Preventer, Valves, and Flange, located in 1.2.1 and 1.2.2, identified in 1.3.1 and 1.3.2, in accordance with 2.2.
(V)(G) "TIGHTNESS TEST"
3.2 Accomplish system integrity test of disturbed piping using nominal operating system pressure and temperature. Allowable leakage: None.
3.2.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirments of 3.2 to the SUPERVISOR.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
SSP: HRMC-022-24 2 of 2 ITEM NO: 533-11-001
SHIP: YRBM 52 (RMC 20414) ITEM NO: 533-11-002
COAR: 16 PCN: SERV-L111
SERV-L115
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 3 ITEM NO: 533-11-002
1. SCOPE:
1.1 Title: Potable Water Pressure Gauge; replace, calibrate, and certify
1.2 Location of Work:
1.2.1 Laundry Room (1-30-2-Q)
1.2.1.1 Potable Water Reducing Station
1.2.2 Galley (1-49-2-Q)
1.3 Identification:
1.3.1 Quantity (One EA): Potable Water Pressure Gauge, Simplex, 0- 200 psi, 4.5" Dial, FLMTD, Item F-10 of 2.2.
1.3.2 Quantity (10 LF): Potable Water Supply Piping, 1/2" Dia, Item P-8 of 2.2.
1.3.3 Quantity (One EA): Bibb Faucet (Single), 1/2", Bronze, Item F- 144 of 2.2.
1.3.4 Quantity (One EA): Faucet, 1/2", MIL-F-163, Bronze, THD, Item F-42 of 2.2.
1.3.5 Quantity (One EA): Valve Label, Item L-52 of 2.2.
1.3.6 Quantity (2 EA): Valve, Gate, 1/2", SB UN End, Item V-12 of 2.2.
1.3.7 Quantity (One EA): Valve Label, Item L-51 of 2.2.
1.3.8 Quantity (One EA): Potable Water Pressure Gauge, Simplex, 0- 100 psi, 4.5" Dial, FLMTD, Item F-11 of 2.2.
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 509-6907744 Rev B, Fresh Water System, Fresh Water Arrangement, Main Deck and Below
2.3 MIL-STD-777, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships
2.4 S9086-RK-STM-010/CH-505, Naval Ship's Technical Manual, CH 505, Piping Systems
3. REQUIREMENTS:
3.1 Remove and replace with new each potable water pressure gauge with same or equivalent, identified in 1.3.1 and 1.3.8, located at 1.2.1, in accordance with 2.2 through 2.4. Potable water pressure gauge configuration shown in Section 55-D and Detail 87-D of 2.2.
3.1.1 Remove and dispose of fluids in accordance with federal, state, and local laws, codes, ordinances and regulations.
3.1.2 Accomplish the requirements of 009-13 of 2.1 for calibration of each new potable water pressure gauge installed in 3.1. Affix new calibration sticker on the new gauge at the same location where the
SSP: HRMC-022-24 2 of 3 ITEM NO: 533-11-002 existing sticker was placed on the existing gauge.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish an operational test of each new gauge installed in 3.1 at system normal operating pressure and temperature, proving proper operation and zero leakage.
3.2.1 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
3.3 Remove and replace with new up to 10 linear feet of upgraded potable water supply stainless steel braided flex hose lines to Galley Deep Sink, identified in 1.3.2, located at 1.2.2, in accordance with 2.3 and using
2.2 as guidance. Potable water supply line configuration shown in Section 69-D and Detail 75-A of 2.2.
3.3.1 Accomplish the requirement of 009-71 of 2.1 for new piping installed in 3.3 prior to installation.
3.4 Mechanically remove and replace with new Gate Valve with same or equivalent and each label, located in 1.2.2, identified in 1.3.5 through 1.3.7, in accordance with 2.2 through 2.4.
3.4.1 Ensure proper color-coding for each new valve installed in 3.4 in accordance with 2.4, Table 505-7-1.
3.5 Mechanically remove and replace with new each Faucet, located in 1.2.2, identified in 1.3.3 and 1.3.4, in accordance with 2.2 and 2.3.
Galley Deep Sink configuration shown in Section 69-D and Detail 75-A of 2.2.
(V)(G) "OPERATIONAL TEST"
3.6 Accomplish an operational test of the each new faucet and gate valve installed in 3.4 and 3.5 under normal system operating pressure and temperature, in accordance with Test Notes of 2.2, proving proper operation and zero leakage. Exercise each new faucet and gate valve a total of 3 evolutions. Each evolution consists of actuating each equipment from off to on to off position.
3.6.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.6 to the
SUPERVISOR.
(V)(G) "TIGHTNESS TEST"
3.7 Accomplish system integrity test of disturbed piping using nominal operating system pressure and temperature in accordance with Test Notes of 2.2. Allowable leakage: None.
3.7.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.7 to the
SUPERVISOR.
3.8 Accomplish the requirement of 009-87 of 2.1 and the Special Cleaning and Disinfection Notes in 2.2 for Chemical Disinfection of equipment, disturbed piping, and associated components installed in 3.1, and 3.3 through 3.5.
3.8.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.8 to the
SSP: HRMC-022-24 3 of 3 ITEM NO: 533-11-002
SUPERVISOR.
3.9 Accomplish the requirement of 009-107 of 2.1 for piping system cleanliness of equipment, disturbed piping, and associated components installed in 3.1, and 3.3 through 3.5.
3.10 Accomplish the requirement of 009-09 of 2.1 to provide PCP for equipment, disturbed piping, and associated components installed in 3.1, and 3.3 through 3.5.
3.11 Accomplish the requirement of 009-32 of 2.1 for new and disturbed surface.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 555-11-001
COAR: 16 PCN: SERV-L105
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 555-11-001
1. SCOPE:
1.1 Title: Aqueous Potassium Carbonate (APC) Fire Extinguishing System;
replace and certify
1.2 Location of Work:
1.2.1 Galley (1-49-2-Q)
1.3 Identification:
1.3.1 Quantity (One EA): Aqueous Potassium Carbonate (APC) Fire Extinguisher, Brand - KIDDE, Type - WHDR Wet Chemical Suppression System
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 507-6907743, Fire Extinguishing System APC System Deep Fat Fryer
2.3 MN-6870 Gaylord, Gaylord Fail Safe Control Cabinet Schematic
3. REQUIREMENTS:
3.1 Disconnect mechanically and remove the existing equipment listed in 1.3, located in 1.2.1 and using 2.2 for guidance.
3.1.1 Procure and install new the APC fire extinguisher accordance with manufacturer instructions and using 2.2 for guidance. New bottle shall be of equal or larger size capacity than existing.
3.1.1.1 Replace 2 each 450 degree fusible links for Kidde Model KRS-50 installed in 3.1.1 using 2.2 for guidance and ensuring links are fusible.
3.1.2 Obtain the services of a qualified technical representative to remove, modify, install, test and certify the APC System.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish an operational test of the equipment installed in 3.1 to ensure equipment functions to designed sequence of operation, in accordance with manufacturer's instructions supplied with equipment and using 2.3 for guidance. Ensure associated dampers close and ventilation shuts down, within the immediate area, when the APC system is activated.
3.2.1 Submit one copy, in approved transferrable media, of the results of 3.2 and document(s) of official APC system certification to the SUPERVISOR.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SSP: HRMC-022-24 2 of 2 ITEM NO: 555-11-001
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 593-11-001
COAR: 16 PCN: SERV-L113
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 593-11-001
1. SCOPE:
1.1 Title: CHT Piping and Component Repairs; accomplish
1.2 Location of Work:
1.2.1 CHT Pump Room (2-38-2-E)
1.3 Identification:
1.3.1 Quantity (One EA), Pipe, 1.5" Dia, 1.9" OD x .072" THK, TBG, MIL-T-16420, CNA 90-10, Copper-Nickel, Item P-3 of 2.3
1.3.2 Quantity (One EA), Valve, Swing Check, SB UN End,1.5" Dia, Bronze, Item V-9 of 2.3
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 S9086-T8-STM-010/CH-593, Pollution Control
2.3 505-6907753 Rev B, Modernization - YR-77, CHT Sewage System - Tank, Machinery & Piping, 2nd Deck
2.4 DOL, OSHA STD 29 CFR 1915, Control of Explosives and Other Dangerous Atmospheres
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-88 of 2.1.
3.2 Accomplish the requirements of 009-09 of 2.1.
3.3 Prior to accomplishing the requirements of this work item, verify that the sanitary and sewage CHT piping system has been emptied and certified "Safe for men" and "Safe for hot work" to the extent necessary to accomplish the requirements of this work item in accordance with 2.3.
3.4 Remove, template from existing and replace with new up to 12 linear feet of existing CHT piping listed in 1.3.1, located in 1.2.1 in accordance with 2.3.
3.4.1 Accomplish the requirement of 009-71 of 2.1 for new piping listed in 1.3.1, prior to installation.
3.5 Accomplish the requirements of 009-12 of 2.1, including Table One, Column A, Line One and 3 for brazing.
3.6 Remove and replace with new One EA Swing Check Valve, listed in 1.3.2, located in 1.2.1 in accordance with 2.3.
3.6.1 Accomplish the requirements of 009-50 of 2.1 for new swing check valve listed in 1.3.2, prior to installation.
(V)(G) "OPERATIONAL TEST"
3.7 Accomplish an operational test of each newly installed equipment listed in 1.3, in accordance with 2.3 and Test notes T-2 and T-3, using shipboard procedures at normal system operating pressure. Allowable leakage: None.
SSP: HRMC-022-24 2 of 2 ITEM NO: 593-11-001
3.7.1 Submit one legible copy, in approved transferable media, of a report listing the results of 3.6 to the SUPERVISOR
3.8 Coordinate the sampling and lab analysis of waste water and/or sludge via the SUPERVISOR. Upon receipt of satisfactory lab analysis, contractor to commercially dispose of waste water and/or sludge generated.
3.9 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 611-11-001
COAR: 16 PCN: SERV-L109
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 2 ITEM NO: 611-11-001
1. SCOPE:
1.1 Title: Accommodation Ladder; inspect and test
1.2 Location of Work:
1.2.1 01 Level, Exterior, Starboard, Forward of Quarter Deck
1.2.2 03 Level
1.3 Identification:
1.3.1 Quantity (One EA): Accommodation Ladder Assembly
1.3.2 Quantity (One EA): Davit Assembly
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
2.3 803-6907739 Rev A, Test Memorandum, Berthing Barge YR-77, Accommodation Ladder - Static Test
2.4 803-1645271, Load Handling Davits 500 to 2500 Pounds Aluminum and Steel
3. REQUIREMENTS:
(V)(G) "STATIC / OPERATIONAL TEST"
3.1 Accomplish the requirements of 2.2 for the static and operational test of the existing accommodation ladder and davit listed in 1.3, and located in 1.2.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a completed copy of 2.2 and 2.4 with all recorded data and required signatures to the SUPERVISOR.
3.2 Remove existing and install new label plates for the existing Accommodation Ladder Assembly listed in 1.3.1, in accordance with paragraphs 15.4 and 15.4.1 of 2.3.
(V)(G) "STATIC AND DYNAMIC LOAD TEST"
3.3 Accomplish the requirements of Test Notes B and C of 2.4 without using the winch for the static and dynamic test of the associated accommodation ladder davit located in 1.2.2. Test load shall be 5000 pounds for static testing and 3,750 pounds for dynamic testing.
(V)(G) "OPERATIONAL TEST"
3.4 Accomplish the requirements of an operational test of the accommodation ladder's davit winch by exercising the winch 3 evolutions.
Each evolution is to use the winch to lift the ladder from a stowed position down to the pier and back again. Acceptance Criteria: No binding, sticking, or strain allowed.
(I) "NON DESTRUCTIVE TESTING"
SSP: HRMC-022-24 2 of 2 ITEM NO: 611-11-001
3.5 Accomplish non-destructive testing (Visual Test VT) on each weld, including each load-bearing joint and fastener of the accommodation ladder listed in 1.3.1, located in 1.2.1, and all associated components.
Testing shall be accomplished in accordance with 2.2.
3.5.1 Submit one legible copy, in electronic media, of a report listing results of the requirements of 3.5 to the SUPERVISOR. The report shall include a detailed sketch of each exact location requiring repair or replacement.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: YRBM 52 (RMC 20414) ITEM NO: 992-11-001
COAR: 16 PCN: SERV-L110
CMP: NONE
PLANNER:
SSP: HRMC-022-24 1 of 3 ITEM NO: 992-11-001
1. SCOPE:
1.1 Title: Deep Clean; accomplish
1.2 Location of Work:
1.2.1 Throughout all interior spaces
1.3 Identification:
1.3.1 Not Applicable.
2. REFERENCES:
2.1 Standard Items, (FY-24, CH-1)
2.2 General Specifications of Overhaul of Surface Ships (GSO), 2016 Version
2.3 MIL-STD-1623, Fire Performance Requirements and Approved
Specifications for Interior Finish Materials and Furnishings
3. REQUIREMENTS:
3.1 Accomplish the requirements to deep clean and sanitize all spaces located in 1.2, using Occupational Safety and Health Administration approved disinfectant products and materials.
3.1.1 Clean all horizontal and vertical spaces, corners, crevices, and equipment / furniture surfaces to remove all of oil, grease, food deposit, human waste/hair, grime, dirt, lime, scale, soap scum, water mineral deposits, debris and sanitize as follows:
3.1.1.1 Typical surfaces to clean and sanitize includes but not limited to tables, chairs, doorknobs, light switches, countertops, handles, toilets, faucets, sinks, and rails.
3.1.1.2 Deep clean, scrub, and sanitize water closets and shower stall areas.
3.1.1.3 All interiors, galley / scullery equipment including
reefer flats and sanitary spaces shall include scrubbing, cleaning and sanitization of all surfaces, de-liming and de-scaling of tile; toilets, sinks, baths, showers. Walk-in combination cooler and freezer shall be defrosted, cleaned and sanitize in a similar manner. Upon satisfactory cleanliness inspection, wrap and secure equipment with plastic wrap to prevent accidental opening and contamination.
3.1.1.4 Inspect and deep clean Gaylord Hood system.
3.1.1.5 The griddle in the Galley shall be scraped clean of all oil, grease, carbonized food remnant. Top surface shall be scoured using a griddle stone to bare metal surface. Upon satisfactory cleanliness inspection, apply a film of cooking oil over entire surface and cover with plastic wrap. Do not use steel wool to clean.
3.1.1.6 All deck surfaces shall be vacuumed, mopped, and waxed.
All inclined ladder assemblies shall be vacuumed and wiped clean.
SSP: HRMC-022-24 2 of 3 ITEM NO: 992-11-001
3.1.1.7 All mirrors and interior sides of windows shall be wiped clean and polished with glass cleaner.
3.1.1.8 All living and berthing spaces, passageways, lounges, recreation spaces, offices and other support spaces, vestibules and entryways vacuumed, mopped and waxed, mirrors polished. Deep clean and scrub cupboards, wardrobes, inside windows, fixtures, framework, ledges, sills, and their doors.
3.1.1.9 Special care must be taken around energized electrical equipment to prevent any damage to electrical equipment and to prevent electric shock to personnel. Do not spray any liquid on any electrical appliance cooling fan, motor, exposed wiring or connections.
3.1.1.10 Follow the cleaning product manufacturer’s directions.
Rags used for wiping surfaces shall be changed for every new space or when they have been soiled. Rags shall not be re-used unless they have been washed and sanitized.
3.1.1.11 Vacuum clean and shampoo all Barge carpeting and mats, furniture (sofas, loveseats, chairs, etc.) and clean all air diffusers free of dust and debris.
3.1.2 Remove and dispose of all generated waste in accordance with federal, state, and local laws, codes, ordinances, and regulations.
3.2 Replace all air handling Unit (AHU) Filters.
3.3 Replace up to 20 EA broken or damaged ceiling panels and tiles. Turn over unused panels to the Barge Program
3.4 Replace with new all bunk/window curtains, blinds, and awnings, located in 1.2, in accordance with paragraph 640g of 2.2, with the following exceptions and requirements:
3.4.1 New curtains shall not be pleated and shall be fire retarded in accordance with 2.2.
3.4.2 New curtains shall be tan or beige in color.
3.5 Remove existing and install new components as specified below:
3.5.1 A total of 10 each CD-X-10 Series locks or equal. Turn over unused locks to the SUPERVISOR. Combination shall be set to the numbers chosen by BARGE PROGRAM SUPERVISOR.
(V)(G) "OPERATIONAL TEST"
3.5.1.1 Accomplish an operational test of all newly installed combination locks installed in 3.5.1. Unlock and lock through 4 compete cycles. Allowable sticking or binding: None.
(V)(G) "CLEANLINESS INSPECTION"
3.6 Accomplish a joint visual inspection with the SUPERVISOR of each space listed in 1.2 for verification of cleanliness. Degree of cleanliness shall be determined by rubbing or wiping a surface designated by the SUPERVISOR using a white cotton glove provided by the Contractor.
After wiping, the glove shall be observed for any evidence of residue having been left on the surface being tested. Criteria: All areas shall be turned over in a clean, sanitized and dry condition. No dirt, debris, garbage, and waste shall be present and or visible on the white glove
SSP: HRMC-022-24 3 of 3 ITEM NO: 992-11-001 used.
3.6.1 Develop a spreadsheet / check sheet / map of entire interior of the barge to indicate completion of areas cleaned for tracking purposes with provision for GOVERNMENT signature. After a work space or habitability space has been considered cleaned and sanitized the Contractor shall place a placard on the bulkhead/door stating cleaning is complete, space has been turned over, and no one is allowed into the space. Only GOVERNMENT and or Barge Maintenance Program personnel will have the option to lock the space.
3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.