RFQ_Vendor_QandA_V2.pdf
PDF 176 KB Posted
- Attached to
- Temporary Air Conditioning Rental Units Federal contract opportunity
- Solicitation number
- N32253-24-Q-0040
About this file
This document is a set of responses to questions (Q&A) related to Solicitation N32253-24-Q-0040 for Temporary Air Conditioning Rental Units at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF).
The solicitation seeks a contractor to provide temporary air conditioning (AC) units and related services, including delivery, maintenance, and retrieval. Key requirements include a minimum cooling capacity of 25 tons, a minimum of 2 units each capable of at least 5,000 CFM airflow, and compatible electrical connections. The period of performance is tentatively 06/03/2024 to 06/02/2025. Quotes are due by 05/10/2024 and must include a technical proposal, completed FAR forms, and pricing in the format specified. There is no incumbent vendor in place. The applicable NAICS code is 532289 with a $12.5M size standard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_Vendor_QandA.pdf | ||
| APPENDIX I HEALTH_SAFETY-MAR 2024.pdf | ||
| APPENDIX II ENVIRONMENTAL Facilities - 16-OCT-2019.pdf | ||
| 41.N32253-24-Q-0040.pdf | ||
| APPENDIX III SECURITY - CIA CNIA NWA SECREQS - JUN-2021.pdf | ||
| (3) PHNSYIMF OPSEC Contract Requirements 03-21-22.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF):
N32253 Solicitation – N32253-24-Q-0040
Temporary Air Conditioning Rental Units
RESPONSES TO QUESTIONS (5/1/2024)
1. Question: Would the following equipment satisfy the requirement?
Answer: Please refer to the Performance Work Statement as listed in the solicitation:
3.1.1 Temporary Air Conditioning Units – Deliver AC units, totaling a minimum cooling capacity of 25 Tons.
3.1.2 Electrical Power Connection: Must be equipped/compatible with Single Pole Camp-Type J-Series (Eaton plugs: Male, Black E1016-1600 or 1600S, Male;
White E1016-1605 or 1605S; Male, Red E1016-1602 or 1602S) or equivalent.
3.1.3 Unit type & quantity: Must provide a minimum of (2) AC units each capable of at least 5,000 CFM airflow to meet existing system requirements. Must be able to forklift units. Units must have certified, welded lifting eyes in order to be craned into multiple work areas.
2. Question: Is there an Incumbent in place?
Answer: No, there is not.
3. Question: How many 25 ton units will be required?
Answer: Please refer to the Performance Work Statement as listed in the solicitation:
3.1.1 Temporary Air Conditioning Units – Deliver AC units, totaling a minimum cooling capacity of 25 Tons.