Question and Answers.pdf

PDF 119 KB Posted

Attached to
Industrial Equipment Disposal Federal contract opportunity
Solicitation number
N32253-21-Q-0061
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document summarizes a federal solicitation for industrial equipment disposal services. The Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility is seeking quotes to dismantle and dispose of five industrial machines located at its facility. The period of performance is from September 30, 2021 to September 29, 2022. Quotes are due by September 20, 2021 and must include documentation as specified in the solicitation. The opportunity is set aside for small businesses only. The selected contractor will be responsible for removing the machines, which are bolted to the floor, from an active workspace occupied by employees. The solicitation number is N32253-21-Q-0061 and is issued according to FAR Part 13 by the Department of the Navy Naval Sea Systems Command.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32253-21-Q-0061 Questions and Answers

Do you have any maps/floorplan or something similar that shows the access to the machinery and layout of the shop floor space?

Yes there are floor plan maps with equipment location. This has not been approved by security to be publically released.

Is all the machinery bolted to the floor?

Yes, machines are bolted to the floor.

Is there a loading dock?

No loading dock. All machines are on ground level (first floor of b155).

Is the material located in warehouse space with employees occupying that space? Will we need to work around any personnel or operational equipment etc.?

Yes, the space is active with employees working. Shop will coordinate personnel and work to have areas clear for disposal work.

Will there be a draw payment system based on progress?

The PWS isn’t structured in Phases. Please refer to the FAR 52.204-22.

Can you send photos of the workspace?

Photos of the machines are available that may provide some workspace information. Please refer to attachments/links.

File details come from the government source that posted it. Updated .