PWS_WIWA Pumps Maintenance.pdf

PDF 1 MB Posted

Attached to
Paint Pump Maintenance Federal contract opportunity
Solicitation number
N32253-20-Q-0011
Issued by
Department of the Navy Naval Sea Systems Command

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

PERFORMANCE WORK STATEMENT

PEARL HARBOR NAVAL SHIPYARD AND INTERMEDIATE MAINTENANCE

FACILITY (PHNSY & IMF)

Shop 64 WIWA® Equipment Maintenance and Repair

1. BACKGROUND

Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls, and repairs various vessels of the US Navy. Its industrial operations provide the US Naval forces with a wide range of services and resources located on the island of Oahu, Hawaii with direct and indirect support to Virginia-class submarines, surface vessels and shore based activities in the Pacific. To accomplish some of our work, there is a need for sound functioning equipment that requires maintenance and repairs.

2. OBJECTIVE AND SCOPE

PHNSY & IMF, Code 970, Shop 64 Plastic Fabricators seeks a contractor to provide the required maintenance and repairs on WIWA® model pumps.

3. PERFORMANCE REQUIREMENTS

The contractor shall provide quarterly maintenance services upon request within 14 calendar days. Per year, contractor shall perform up to 24 pumps maintenances. The schedule of required pump maintenances shall be determined by government representative and coordinated with the contractor.

WIWA® Model Pumps to be serviced:

PN649000 M-WC14VR (1 pump) 0689000 (5 pumps) WC11FR (9 pumps) 8000166 (2 pumps) 8000162 (1 pump)

4. MAINTENANCE REQUIREMENTS

A. Inspect WIWA® spray guns B. Inspect WIWA® mix manifolds C. Inspect WIWA® heater D. Inspect all hoses (internal & bundle) E. Inspect air motor (change mufflers) F. Pressure test fluid sections (rebuild if necessary)

G. Test all ratio controls H. Inspect heaters I. Inspect electric J. Change all throat seal liquid K. Top off all fluids L. Pressure test all pumps M. Minor repairs

4.1 Repair Parts: The contractor shall advise the Contracting Officer’s Representative (COR) if any parts replacement is not covered under this contract. Contractor shall not proceed with repairs without authorization from the Contracting Officer or designated contracting official.

4.2 Workmanship: The contractor shall ensure work is performed by personnel certified to work on WIWA® pumps as listed in, “3. PERFORMANCE REQUIREMENTS.”

4.3 Reports: The contractor shall provide maintenance logs for all serviced equipment listed in, “3.

PERFORMANCE REQUIREMENTS.” Reports shall be received within 14 business days from the completion of work.

5. SERVICE DELIVERY SUMMARY

Performance Requirement PWS Paragraph Notes Performance Threshold

1. Perform Maintenance Paragraph 4.A thru 4.M 100% delivery and compliance.

2. Maintenance Logs Paragraph 4.3 100% delivery and compliance.

6. CONTRACTOR QUALIFICATIONS/REQUIREMENTS

6.1 The contractor shall ensure the necessary employee level of expertise for performance of the deliverables described by this PWS and the necessary management and administrative support associated with personnel, equipment and services provided.

6.2 Contractor shall comply with Safety and Health work practices specified in Appendix I.

6.3 Contractor shall comply with environmental guidelines specified in Appendix II.

7. GOVERNMENT FURNISHED UTILITIES AND SERVICE

7.1 GENERAL: None provided. The Government will not provide any additional services, material, or government furnished equipment as part of this PWS.

7.2 UTILITIES: The contractor may utilize existing facility electrical and/or low pressure air outlets to perform the work. However, the contractor shall be responsible for any damages that may result from the operation of contractor’s equipment.

8. SECURITY

8.1 The contractor shall pass a background check to gain access onto the base. The contractor will coordinate with the Technical Point of Contact (TPOC) or Contracting Officer’s Representative (COR) to obtain a gate pass at building 3455 Pass Office. It is not unusual for the pass process to take an hour or more. Contractor shall be a U.S. citizen and pass a security background check. Only those individuals with favorable investigations shall be utilized on this contract. Prior to the start of work, the contractor shall provide the COR (on company letterhead) a request for access and include the following information – full name of all personnel working on this contract; social security number; date of birth, place of birth, and citizenship. The contractor shall state that the information has been verified and shall have supporting records on file if required for examination. The contractor’s employees must be a U.S. citizen and registered with the Defense Biometric Identification System (DBIDS).

8.2 Contractor personnel shall follow all procedures in requesting and obtaining a PHNSY & IMF “Green” unescorted standard access control badge for all contractor personnel performing work. Sufficient time shall be allowed by the contractor to obtain the necessary badges prior to work.

8.3 Contractor will coordinate with PHNSY Security Office and COR in the completion of Visit Request for Pearl Harbor Naval Shipyard (Form PH-SYD 5512/28 Rev 8-12). Should contractor personnel receive or suspect they have learned classified information beyond their level of clearance; the contractor shall identify and immediately report suspicions to the COR.

8.4 Security Requirements: This contract does not require a security clearance level and clearance granted by the Defense Security Service (DSS). Contractor shall comply with Security requirements specified in Appendix

III.

8.5 Portable Electronic Devices (PEDs): PEDs include pagers, mobile/cellular telephones (with/without cameras), personal digital assistants/job performance aids, laptop/notebook/handheld computers, digital imagery (still/video) devices, analog/digital sound recorders (e.g. iPod), video game devices, USB devices and devices of similar capability, functionality or design. The contractor shall strictly comply with PHNSY & IMF policies and procedures concerning the use and possession of PEDs while working on PHNSY&IMF property.

9. CONTRACTOR PERSONNEL

9.1 The contractor shall comply with Public Law 105-270, Section 5(2)(A), which states that contractors will not perform inherently governmental functions. Section 5(2)(A) of this Public Law defines the term “inherently governmental function” as “a function that is so intimately related to the public interest as to require performance by Federal Government employees.” Per Section 5(2)(B), inherently governmental functions include management of Government programs requiring value judgments, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations. Per Section 5(2) (C), inherent governmental functions DO NOT include, (i) gathering information for or providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature.”

9.2 Contractor personnel shall not establish an employee-employer relationship with Government personnel under this contract.

9.3 Contractor personnel shall not manage, supervise, or task Government employees or military personnel.

Contractor personnel may not make any commitment to non-DoD personnel, including a foreign official, which commits the expenditure of U.S. Government resources.

9.4 The contractor shall not provide personal services.

9.5 Contractor personnel shall make clear to all individuals they engage with that they are contractor employees and not Government employees. When participating and introducing themselves during official events wherein Government, non-Government, or foreign personnel are present, contractor personnel shall identify themselves as employees of the contractor. Contractor personnel must be clearly identified (i.e. company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.

9.6 Facilities may close due to local or national emergencies, administrative closings, or other Government directed facility closings. Contractor access to Government facilities during closures is not permitted.

9.7 Personnel: In accordance with current Department of Defense and Homeland Security requirements, performance of all work under this contract is restricted to US citizens. Contractor personnel performing services shall be required to comply with all Pearl Harbor Naval Shipyard and IMF rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit. All regulations, procedures and access/security requirements shall be obtained prior to the first day of contract performance. It is the responsibility of the Contractor to process and obtain all approvals and allow for sufficient processing time to secure access and entry to PHNSY & IMF.

10. PERIOD OF PERFORMANCE

Period of Performance

Base Year 03 February 2020 to 02 February 2021

Option Year 1 03 February 2021 to 02 February 2022 Option Year 2 03 February 2022 to 02 February 2023 Option Year 3 03 February 2023 to 02 February 2024

Option Year 4 03 February 2024 to 02 February 2025

11. PLACE OF PERFORMANCE

The place of performance shall be on-site at Pearl Harbor Naval Shipyard Building 7 and/or Building 12, in the Controlled Industrial Area (CIA)

HOURS OF OPERATION: All work shall be performed during the normal working hours of 0630 to 1500 hours, daily Monday through Friday, excluding Federal Holidays.

New Year’s Day 1st of January Dr. Martin Luther King’s Birthday 3rd Monday in January President’s Day 3rd Monday in February Memorial Day 4th or 5th Monday in May Independence Day 4th of July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day 11th of November Thanksgiving Day 4th Thursday in November Christmas Day 25th of December

If the Federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the Federal holiday falls on a Sunday, the holiday is observed on the following Monday.

12. ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the PHNSY & IMF via a secure data collection site.

Contracted services excluded from reporting are based on Product Services Codes (PSCs). The Excluded PSCs are:

(1) W, Lease of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil/.

Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil/.

13. POINTS OF CONTACT

Contracting Officer’s Representative (COR)

TBD

Technical Point of Contact (TPOC)

TBD

14. ATTACHMENTS

APPENDIX I – SAFETY AND HEALTH WORK PRACTICES FOR CONTRACTORS WORKING WITH

PEARL HARBOR NAVAL SHIPYARD AND INTERMEDIATE MAINTENANCE FACILITY (PHNSY &

IMF)

APPENDIX II – CONTRACTOR ENVIRONMENTAL SPECIFICATION GUIDELINES

APPENDIX III – SECURITY REQUIREMENTS APPLICABLE FOR PEARL HARBOR NAVAL

SHIPYARD & IMF’S CONTROLLED INDUSTRIAL AREA, OTHER SENSITIVE AREAS,

CONTROLLED NUCLEAR INFORMATION AREAS, AND/OR NUCLEAR WORK AREAS

Additional attachments to be determined by the Technical Point of Contact (TPOC).

File details come from the government source that posted it. Updated .