NSW_1407-1408_HRMC-029-19_Package.pdf
PDF 430 KB Posted
- Attached to
- Rigid Hull Inflatable Boat alterations Federal contract opportunity
- Solicitation number
- N3225319Q0072
About this file
Work Specification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3225319Q0072_solicitation_synopsis.docx | DOCX document | |
| Environmental_Guide_for_Ktr_on_Ship_Projects.pdf | ||
| 099-010PH_RMMCO_Check-In_v01_2014_updates.doc | DOC document | |
| OSHContractor_MOA__final_6sept2017.doc | DOC document | |
| 099-01_thru_07_2010_with_FOUO_pages_removed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
HRMC (NMD)
NAVAL SPECIAL WARFARE GROUP THREE LOGISTICS AND SUPPORT UNIT (RMC 55457)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: HRMC-029-19
INCLUDES ALL CHANGES THROUGH 7/17/2019
INDEX
SHIP: NAVAL SPECIAL WARFARE GROUP THREE LO HRMC-029-19
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-20 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2018 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 04/30/2018 Original
009-03 Toxic and Hazardous Substance; control 04/09/2019 CH-1
009-04 Quality Management System; provide 04/09/2019 CH-1
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
08/31/2018 Original
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
04/09/2019 CH-1
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 08/31/2018 Original
009-10 Asbestos-Containing Material (ACM); control 04/30/2018 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009-21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;
accomplish
10/01/2018 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
10/01/2018 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
10/01/2018 Original
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
10/01/2018 Original
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009-67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
10/01/2018 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 08/31/2018 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
10/01/2018 Original
009-74 Occupational, Safety and Health Plan; accomplish 10/01/2018 Original
009-80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 08/31/2018 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 10/01/2018 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
03/06/2018 Original
009-99 Ship Departure Report; provide 07/18/2014 Original
009-100 Ship's Stability; maintain 03/06/2018 Original
ITEM_NO. TITLE CHANGE DATE CHANGE
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
04/30/2018 Original
009-117 Combat Systems, Light-Off Suport; provide 08/31/2018 Original
009-118 CG Deck Loading; accomplish 07/18/2014 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original
009-122 Temporary Padeye; install and remove 10/01/2018 Original
CHANGE DATETITLEITEM NO.
CATEGORY II. FY-20 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
CHANGE
009-12 Weld, Fabricate, and Inspect; accomplish 10/01/2018 Original
009-25 Structural Boundary Test; accomplish 10/01/2018 Original
009-32 Cleaning and Painting Requirements; accomplish 04/09/2019 CH-1
009-90 Technical Representative; provide 04/09/2019 CH-1
ITEM NO. TITLE
Hazardous Waste Produced on Naval Vessels; control077-00-001
Outboard Engines; replace236-11-001
RHIB'S Silver Ships Electrical System; replace321-11-001
RHIB Silver Ships; repair581-11-001
Vessel Custody Transfer; accomplish583-11-001
RHIB Silver Ships; repair and preserve631-11-001
SHIP: NAVAL SPECIAL WARFARE GROUP
THREE LOGISTICS AND SUPPORT
UNIT (RMC 55457)
ITEM NO: 077-00-001
COAR: 26 PCN: SERV-L014
SERV-L013
CMP: NONE
PLANNER: UEHARA, CHRISTOPHER
SSP: HRMC-029-19 1 of 4 ITEM NO: 077-00-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, SHIP: NAVAL SPECIAL WARFARE GROUP THREE LOGISTICS AND SUPPORT UNIT (RMC
55457)
SSP: HRMC-029-19 2 of 4 ITEM NO: 077-00-001 and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________
Sodium Phosphates (Tri, Bi, _____ ____________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Ignitable)
Miscellaneous Chemicals _____ ____________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ __________
Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)
Paints (May include lead, _____ ____________ __________
SSP: HRMC-029-19 3 of 4 ITEM NO: 077-00-001 cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludge (Contaminated with _____ ____________ a known hazardous waste)
Waste Water w/ Detergent _____ ____________
Ventilation Debris/Residue
(heavy metals, e.g., cadmium, chromium) _____ ____________ __________
3.5.1 Provide 0 dollars for managing and disposing of all hazwaste listed in 3.5. Total cost greater or less than dollar amount when authorized will be the subject of an equitable adjustment.
3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
3.7 Submit one legible copy, in approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the
SUPERVISOR.
3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.7.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
SSP: HRMC-029-19 4 of 4 ITEM NO: 077-00-001
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
UNIT (RMC 55457)
ITEM NO: 236-11-001
COAR: 26 PCN: SERV-L021
SERV-L022
CSWT FILE NO: 123-019 (CG 47) CMP: NONE
REVISED: 11 Oct 2018 PLANNER: UEHARA, CHRISTOPHER
SSP: HRMC-029-19 1 of 6 ITEM NO: 236-11-001
1. SCOPE:
1.1 Title: Outboard Engines; replace
1.2 Location of Work:
1.2.1 Throughout Vessel
1.3 Identification:
1.3.1 Quantity (one EA), 11 Meter RHIB, (OPEN), Hull Identification Number: 11MSC1407
1.3.2 Quantity (one EA), 11 Meter RHIB, (OPEN), Hull Identification Number: 11MSC1408
2. REFERENCES:
2.1 Standard Items, (FY-20)
2.2 5107858, Standard Electrical Installation Requirements and Nomenclature
2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.4 TO300-AU-SPN-010 Rev A, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls
2.5 11X42-DI-CC-01, 11X AM Series Drawing Index
2.6 11X42-OB-CC-01, Outboard Plan and Profile
2.7 11X42-IB-CC-01, Inboard Plan and Profile
2.8 11X42-HS-CC-01, Structure Arrangement
2.9 11X42-CA-CC-01, Console Electronics Arrangement
2.10 11X42-CO-CC-01, Collar System Plan View
2.11 11X42-E-CC-01, Electrical Systems
2.12 11X42-AS-CC-01, Auxiliary Systems
2.13 11X42-F-CC-01, Fuel System
2.14 11X42-H-CC-01, Hoisting Arrangement
2.15 11X42-T-CC-01, Towing Arrangement
2.16 11X42-TR-CC-01, Transport Drawings
2.17 11X42-D-CC-01, Misc. Parts
2.18 SHOXS 6800 , Operation & Service Manual
2.19 Ignition, Switch Wiring
2.20 Fuel , Tank Cap
2.21 Underwater Lights , Mounting Plates
SSP: HRMC-029-19 2 of 6 ITEM NO: 236-11-001
2.22 BRP G2 , Evinrude Installation and Predelivery Guide
2.23 BOATMASTER , Operations Manual Trailer: SS11M-180
2.24 Console , Face Layout
2.25 Systems and Specifications, SSPC Painting Manual, Volume 2
2.26 DOL, OSHA STD 29 CFR 1915, Occupational Safety & Health Standards for Shipyard Employment
3. REQUIREMENTS:
3.1 All removed fasteners shall be replaced with new corrosion resistant steel (CRES), ASTM A276, Type 316 fasteners, unless otherwise specified.
All nuts shall be self-locking type, unless otherwise specified. One CRES washer shall be used under each bolt head and under each nut. Bolt/stud length shall not exceed less than 1-1/2 threads or more than 5 threads beyond the nut with full thread engagement. For each vessel listed in 1.3.
3.1.1 Apply anti-seize compound, Loctite 34026 marine grade anti-seize or equal to all stainless-steel threaded fasteners.
3.2 All equipment mounted to aluminum shall have corrosion protection tape (3M Scotchrap #51) installed between the mating surfaces unless otherwise noted for each vessel listed in 1.3.
3.3 Retain all removed items for disposition instructions by SUPERVISOR.
At the discretion of SUPERVISOR, box all removed items for turnover upon boat/trailer turnover for each vessel listed in 1.3.
3.4 Remove existing and install new port and starboard engines (Evinrude part number H250ZAH and H250ZCAH), two (2) G2 black panels (Evinrude part number A030101-11), tie bar kit for 27” to 29” centerline length (Evinrude part number 766568), two (2) water pressure sensor kits (Evinrude part number 5008640), port and starboard propellers (Evinrude part numbers 177320 and 177321), two (2) propeller hubs (Evinrude part number 767683), and two (2) steering brackets (Evinrude part number 768606) for each vessel listed in 1.3, in accordance with 2.22.
3.4.1 Remove existing and install new port and starboard engine cable protective hoses in accordance with 2.22. Template exact size, length and configuration from existing boat conditions.
3.4.2 Technical Representative shall update the engines software to the current version.
3.5 Remove existing engine control cables, binnacle, gauges, engine harnesses, engine GPS antenna, and associated hardware and install new dual engine rigging kit (Evinrude part number 769910), “Y” battery harness (Evinrude part number 587230), 4.3” display (Evinrude part number 769943), 4.3” display cover (Evinrude part number 768400), dual binnacle trim plate (Evinrude part number 765079), 16ft network cable for GPS antenna (Evinrude part number 769961) and all associated equipment, cabling and hardware to convert boat to G2 engines for each vessel listed in 1.3, in accordance with 2.22.
3.5.1 The new trim plate shall be painted black.
3.5.2 A GPS antenna is provided as part of Evinrude part number 769943 and shall be installed on the starboard side of the hardtop, outboard of the radar scanner.
SSP: HRMC-029-19 3 of 6 ITEM NO: 236-11-001
3.5.3 Remove existing kill switch, run/stop toggle switches, ignition switch and associated cabling and install new kill switch (Sierra part number MP40970-1), start/stop toggle switches (Eaton part number 8500K2), ignition switch (Honeywell part number 1TL1-2D), and cabling in accordance with 2.19 and manufacturer’s instructions.
3.5.3.1 The new kill switch, run/stop toggle switches and
ignition switch shall be connected to the G2 system vice using the key switch panel in accordance with 2.19.
3.5.3.2 Connect switches to the engine wiring harness using
Deutsch connectors vice cutting the harness.
3.5.4 All harnesses installed shall be procured in accordance with appropriate length for boat. No connections shall take place in bilge bottom.
3.5.5 Technical Representative shall update the display software to the current version.
3.6 Remove existing steering wheel, steering tilt helm pump, power steering pump and hydraulic hoses and install new steering wheel, cap, and steering tilt helm pump (Teleflex part number HH6543) and hydraulic hoses using the same size and type of that removed for each vessel listed in 1.3, in accordance with 2.22 and manufacturer’s instructions. Template exact size, length, configuration and location from existing boat conditions. New hydraulic hoses shall be routed to new starboard G2 engine in accordance with 2.22.
3.6.1 Do not procure and install power steering pump.
3.6.2 All hoses installed shall be procured in accordance with appropriate length for boat. No connections shall take place in bilge bottom.
3.6.3 Fill and bleed the hydraulic steering system and refill to proper level with new steering fluid in accordance with 2.22 and manufacturer’s instructions.
3.7 Dress and secure all engine and steering control system hoses/cables throughout the boat, including chaffing protection at all penetrations for each vessel listed in 1.3.
3.8 Installation, setup and pre-delivery inspections of Evinrude engine related work shall be completed by an onsite certified Evinrude technician for each vessel listed in 1.3.
3.9 Drain, clean, ventilate, certify gas free, and inspect fuel tank on each vessel listed in 1.3, in accordance with the requirements of 2.26.
3.9.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing type, extent and locations of defects found in 3.9 to the SUPERVISOR, within 3 days of inspection completion.
(V)(G) "CLEANLINESS INSPECTION"
3.10 Inspect fuel tank cleaned in 3.9 for SSPC-SP1 Cleanliness for each vessel listed in 1.3.
3.10.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the results of 3.10 to the
SSP: HRMC-029-19 4 of 6 ITEM NO: 236-11-001
SUPERVISOR.
(V)(G) "PRELIMINARY FUEL TANK PRESSURE TEST"
3.11 Accomplish a pressure test of the fuel tank of each vessel listed in 1.3, within the first 10 days of the start of the availability. Test pressure shall be 2 PSI, holding pressure for 10 minutes. Pressure shall not exceed 2.5 PSI. Allowed pressure drop: NONE. Apply a soapy solution that is non-corrosive and nontoxic solution to inspect for leakage.
Inspect all seams and attachments for leakage. Record results.
3.11.1 Upon completion of the preliminary tank test, blank all tank openings until final installation of fuel system fittings, hoses and hardware to prevent foreign object entry.
3.11.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the results of 3.11 and
3.11.1 to the SUPERVISOR.
3.12 Remove existing and install new fuel lines, fittings, filters, gauges, gaskets and filter housings using the same size and type of that removed for each vessel listed in 1.3, in accordance with 2.13. This includes but not limited to fuel fill cap, fuel fill cap with key and sounding rod, fuel vent, fuel supply, fuel fill hoses, hose clamps, cable clams, fuel gaskets, water filter separator housings and filters, fuel shut-off valves, gauges, carbon canister and fuel tank fittings.
3.12.1 Do not procure and install in-line fuel ball pumps.
3.13 Remove existing and install two (2) new remote oil tanks (Evinrude part number 5008572), oil level converter kits with senders (Evinrude part number 764274), system hoses, associated fittings, hose clamps, and engine oil (Evinrude part number XD100) at the engines and remote tanks for each vessel listed in 1.3, in accordance with 2.22.
3.13.1 The new oil level converter kits shall be connected to the new G2 dual binnacle, channels 3 and 4, in accordance with 2.22 and manufacturer’s instructions.
3.14 Double CRES 316 stainless steel hose clamps shall be installed at any hose to fitting connection for the oil and fuel system for each vessel listed in 1.3.
3.15 Dress and secure all fuel and oil system hoses throughout the boat, including chaffing protection at all penetrations for each vessel listed in 1.3.
3.16 All fuel and oil hoses shall be templated from existing, shall meet appropriate length for vessel and continuous from fitting to fitting for each vessel listed in 1.3. No connections shall take place in bilge bottom.
(V)(G) "FINAL FUEL TANK PRESSURE TEST"
3.17 After fuel tank installations are complete, accomplish a final pressure test for each vessel listed in 1.3. Pressure test fuel tank to 2 PSI, holding pressure for 10 minutes. Pressure shall not exceed 2.5 PSI.
Allowable Pressure drop: NONE. Apply a soapy solution that is non-corrosive and non-toxic solution to inspect for leakage. Inspect all
SSP: HRMC-029-19 5 of 6 ITEM NO: 236-11-001 seams and attachments for leakage. Record test results.
3.17.1 Upon successful completion of the final tank test, all tank fittings shall be blanked until final installation of fuel system fittings, hoses and hardware has been completed to prevent foreign object entry into the fuel system.
3.17.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.17 and 3.17.1 to the SUPERVISOR.
(V)(G) "FINAL VISUAL INSPECTION"
3.18 Completion walk thru with the SUPERVISOR prior to accomplishing Customer waterborne trials, for each vessel listed in 1.3. Contractor shall have all work and discrepancy work list compete, all electrical/electronic, and steering, propulsion equipment and safety systems tested satisfactory prior to waterborne Customer Trials. Provide a complete list of equipment that has been successfully tested prior to waterborne trials to the SUPERVISOR.
3.18.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.18 to the SUPERVISOR within 3 days of waterborne trials.
(V)(G) "WATERBORNE TRIALS"
3.19 Provide qualified personnel to operate each vessel listed in 1.3.
Provide 250 gallons of fuel for each vessel prior to waterborne trials.
Accomplish a two-hour waterborne trial for each vessel to test engines, all electrical and mechanical equipment. The Contactor shall conduct independent waterborne trials prior to customer acceptance trials to verify all work has been accomplished successfully and all systems/components are operating properly. The contractor shall top off the fuel tank between each waterborne trial.
3.19.1 Contractor shall provide a QA inspection report certifying each waterborne trial completion, and work completion, including any discrepancies identified during each waterborne trial.
3.19.2 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.19 and 3.19.1 to the SUPERVISOR within 2 days of each waterborne trial completion.
3.20 Clean and degrease the bilge of each vessel listed in 1.3.
Thoroughly wash-down each vessel and bilge with soap and fresh water, rinse the seawater from all components after each water trial has been performed. Flush engine cooling system with freshwater after each water trial has been performed. NO WATER IS TO BE LEFT IN THE BILGES. CLEANING
IS TO BE ACCOMPLISHED AFTER ALL TRIALS AND PRIOR TO FINAL ACCEPTANCE.
3.21 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces for each vessel listed in 1.3.
4. NOTES:
4.1 Point of contact for possible source of a certified Evinrude engine technician:
Will Foster
SSP: HRMC-029-19 6 of 6 ITEM NO: 236-11-001
Navatek Ltd
PH: (808) 784-84823
wfoster@navatekltd.com.
4.2 Work in conjunction with 11MSC1407 and 11MSC1408 work packages 321- 11-001, 581-11-001 and 631-11-001.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
UNIT (RMC 55457)
ITEM NO: 321-11-001
COAR: 26 PCN: SERV-L019
SERV-L020
CMP: NONE
PLANNER: UEHARA, CHRISTOPHER
SSP: HRMC-029-19 1 of 7 ITEM NO: 321-11-001
1. SCOPE:
1.1 Title: RHIB'S Silver Ships Electrical System; replace
1.2 Location of Work:
1.2.1 Throughout Vessel
1.3 Identification:
1.3.1 Quantity (One EA), 11 Meter RHIB, (OPEN), Hull Identification Number: 11MSC1407
1.3.2 Quantity (One EA), 11 Meter RHIB, (OPEN), Hull Identification Number: 11MSC1408
1.3.3 Quantity (One EA), 11 Meter RHIB Trailer, trailer Serial Number: 42XBK3631EB114671
1.3.4 Quantity (one EA), 11 Meter RHIB Trailer, Trailer Serial Number: 42XBK3635EB114673
2. REFERENCES:
2.1 Standard Items, (FY-20)
2.2 5107858, Standard Electrical Installation Requirements and Nomenclature
2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.4 TO300-AU-SPN-010 A, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls
2.5 11X42-DI-CC-01, 11X AM Series Drawing Index
2.6 11X42-OB-CC-01, Outboard Plan and Profile
2.7 11X42-IB-CC-01, Inboard Plan and Profile
2.8 11X42-HS-CC-01, Structure Arrangement
2.9 11X42-CA-CC-01, Console Electronics Arrangement
2.10 11X42-CO-CC-01, Collar System Plan View
2.11 11X42-E-CC-01, Electrical Systems
2.12 11X42-AS-CC-01, Auxiliary Systems
2.13 11X42-F-CC-01, Fuel System
2.14 11X42-H-CC-01, Hoisting Arrangement
2.15 11X42-T-CC-01 , Towing Arrangement
2.16 11X42-TR-CC-01, Transport Drawings
2.17 11X42-D-CC-01, Misc. Parts
SSP: HRMC-029-19 2 of 7 ITEM NO: 321-11-001
2.18 SHOXS 6800 , Operation & Service Manual
2.19 Ignition Switch , Wiring
2.20 Fuel Tank, Cap
2.21 Underwater Lights , Mounting Plates
2.22 BRP G2 , Evinrude Installation and Predelivery Guide
2.23 BOATMASTER, Operations Manual Trailer: SS11M-180
2.24 Console Face , Layout
2.25 Systems and Specifications, SSPC Painting Manual, Volume 2
2.26 DOL, OSHA STD 29 CFR 1915, Occupational Safety & Health Standards for Shipyard Employment
3. REQUIREMENTS:
(V)(G) "PRELIMINARY ELECTRICAL INSPECTION AND OPERATIONAL TEST"
3.1 Accomplish a complete inspection, and an operational test of all installed mechanical and electrical equipment, including electrical components, lighting, navigational equipment, wiring/cabling, pumps, piping, hoses and label plates, in accordance with 2.2 through 2.24, for each vessel listed in 1.3, and the locations identified in 1.2. Record results.
3.1.1 Submit one legible copy, in approved transferable media, of a report listing the results of the inspection and testing requirements of 3.1 to the SUPERVISOR, within 5 days of testing.
3.1.1.1 The report shall include electrical/mechanical component item number, as identified on its associated reference, reference number, component location, condition, and the testing results of each component tested.
3.2 Prior to component removal, record each component name, as identified on its associated reference, reference number, location, and electrical connection (Disconnect Log) for each vessel listed in 1.3.
3.2.1 Retain all removed items, the SUPERVISOR shall determine disposition. At the discretion of SUPERVISOR, box all removed items for turnover upon boat/trailer turnover to the GOVERNMENT.
3.2.1.1 Submit one legible copy, in approved transferable media, of a report listing the results of the requirements of 3.2 to the
SUPERVISOR.
3.3 All new electrical installations shall meet the electrical installation requirements of 2.2, 2.3, 2.11, 2.12, 2.13, 2.22 and 2.23 for each vessel listed in 1.3.
3.3.1 No electrical connections shall take place in the bilge bottom.
3.3.2 All new electrical connections shall have heat shrink style connections or shall have heat-shrink tubing installed on terminal ends to weatherize.
3.3.3 All new battery and main power connections shall have
protective boots installed.
SSP: HRMC-029-19 3 of 7 ITEM NO: 321-11-001
3.3.4 All new equipment, electrical components, label plates, cable markers, and wire markers, shall be installed, and wire ways and cableways shall be strapped and installed in accordance with 2.2, 2.3, 2.11, 2.12, 2.13, 2.22 and 2.23 prior to operational testing.
3.3.4.1 All new cabling shall be labeled to include circuit
identification at each end.
3.3.4.2 All new wiring shall be labeled to include component
identification on each wire connection/termination point.
3.3.5 Coat all electrical terminals and connections, including, battery switch terminals, engine positive and negative terminals, battery connection terminals, gauge terminals, positive and negative terminal blocks, negative bus terminals, circuit breaker connections, switch connections, reset push buttons, receptacles, connectors using No-Ox (NSN 8030-00-598-5915), using 2.2, 2.3, 2.11, 2.12, 2.13, 2.22 and 2.23 for guidance.
3.3.6 Groom, dress and secure all cabling and wiring to ensure wire/cable runs do not interfere with access to components that are removable.
3.3.7 Install chafe protection to wires/cables entering cableways.
3.3.8 Split Conduit shall be installed for all cableways, where previously installed.
3.3.9 Ensure all new cable penetrations are packed properly
throughout the boat in accordance with manufacturer’s instructions.
3.4 All new equipment mounted to aluminum shall have corrosion protection tape (3M Scotchrap #51) installed between the mating surfaces unless otherwise noted for each vessel listed in 1.3.
3.5 All new threaded fasteners shall be corrosion resistant steel (CRES), ASTM A276, Type 316, unless otherwise specified. All nuts shall be self-locking, unless otherwise specified. One CRES washer shall be used under each bolt head and under each nut. Bolt/stud thread protrusion shall not extend less than 1-1/2 threads or more than 5 threads beyond the nut with full thread engagement. For each vessel listed in 1.3.
3.5.1 Apply anti-seize compound, Loctite 34026 marine grade anti-seize or equal to all new stainless-steel threaded fasteners.
3.6 Remove existing and install new batteries for each vessel listed in 1.3, in accordance with 2.11. Install new battery connection hardware using standard nuts and lock washers.
3.7 Accomplish the requirements of 009-90 of 2.1, for replacement of the Furuno Navigation System, for each vessel listed in 1.3, in accordance with the manufacturer’s instructions.
3.7.1 Remove existing Furuno navigation system and hardware and install new navigation system and hardware for each vessel listed in 1.3, with the following equipment, NavNet TZ Touch Display (Furuno Part Number TZTL12F), Remote Control (Furuno Part Number MCU002), 24 Inch Radome (Furuno Part Number DRS4D), Radome Power Supply (Furuno Part Number PSU017), two (2) NMEA Micro Cables (Furuno Part Number 001-105-800-10), GPS Receiver (Furuno Part Number GP-330B), GPS flush mount kit (Furuno part number 001-037-630), Heading Sensor (Furuno Part Number PG700), Transducer (Furuno Part Number SS60-20-10F), and all associated equipment, cabling, mounting brackets, and hardware in
SSP: HRMC-029-19 4 of 7 ITEM NO: 321-11-001 accordance with the manufacturer’s instructions.
3.7.1.1 Install latest version of software and charts on Furuno navigation system in accordance with manufacturer’s instructions.
3.7.1.2 Electrically connect new navigation system to the
Evinrude G2 system in order to display engine information, installation shall be in accordance with manufacturer’s instructions.
3.7.1.3 Electrically connect new navigation system to the
existing VHF Marine Band Radio at the existing NMEA terminal strip in order to display position data at radio, installation shall be in accordance with 2.11 and manufacturer’s instructions.
3.7.1.4 GPS receiver shall be mounted on the port side of the hardtop, outboard of the radar scanner and connected directly to the NMEA 2000 backbone in the console, in accordance with the manufacturer’s instructions.
3.7.1.5 Install four (4) new spare label plates at the NMEA
terminal strip inside the console for removed heading output wiring using the same size and type of that removed.
(V)(G) "VISUAL INSPECTION"
3.7.1.6 An authorized Furuno technician shall verify
installation and calibration of all navigation related work.
3.7.2 Install new bus extender (Maretron Part Number NBE100) in the console in order to separate the engine NMEA 2000 from the Furuno NMEA 2000, for each vessel listed in 1.3, in accordance with the manufacturer’s instructions.
3.8 Remove existing and install new forward and aft bilge pump system, including, bilge pumps, float switches, NEMA boxes, label plates, associated cabling, hoses, hose clamps and overboard thru-hull fittings using the same size and type of that removed for each vessel listed in 1.3, in accordance with 2.11 and 2.12.
3.8.1 Double CRES316 stainless steel hose clamps shall be installed at any hose to fitting connection.
3.8.2 Dress and secure all bilge system hoses throughout the boat, including chaffing protection at all penetrations.
3.8.3 All bilge hoses installed shall be template from existing, insuring appropriate length for boat and continuous from fitting to fitting.
(V)(G) "VISUAL INSPECTION"
3.8.4 Perform manual/auto function bilge test to ensure the float switch operated properly.
3.9 Remove existing and install new fuel sending unit in the fuel tank using the same size and type of that removed for each vessel listed in 1.3, in accordance with 2.13 and manufacturer’s instructions.
3.10 Remove existing 5A circuit breaker and install new 10A circuit breaker (Airpax part number IUGNF66-33485-10) and wiring for Evinrude
SSP: HRMC-029-19 5 of 7 ITEM NO: 321-11-001 power and connect to Distribution Panel DP-1, circuit J1 for each vessel listed in 1.3. The power for the NMEA backbone shall be connected to the engine wiring harness in accordance with 2.22.
3.11 Install two (2) new underwater lights (OceanLED part number 012305B), cable (LSDSGU-9) and splices for each vessel listed in 1.3, in accordance with 2.2 and manufacturer’s instructions. Underwater lighting shall be connected to Distribution Panel DP-1, circuit K1. Underwater lighting circuit shall be located on the port and starboard side of the engine bracket in accordance with 2.21.
3.12 Remove existing and install new label plates at the breakers listed below using the same size and type of that removed for each vessel listed in 1.3.
3.12.1 (Line 1) SPARE (Line 2) CB4-70A
3.12.2 (Line 1) UWTR LT (Line 2) K1-5A
3.12.3 (Line 1) ENG POWER (Line 2) J1-10A
3.12.4 (Line 1) SPARE (Line 2) U1-3A
3.12.5 (Line 1) SPARE (Line 2) V1-1A
3.12.6 (Line 1) SPARE (Line 2) W1-1A
3.13 Clean the exterior of all toggle switches located on the console at Distribution Panel DP-1, Control Panel 1 and battery voltage selector switch for each vessel listed in 1.3.
3.14 Install forty-two (42) new appropriately sized toggle switch boots on all switches located on the console at Distribution Panel DP1, Control Panel-1 and battery voltage selector switch for each vessel listed in 1.3.
3.15 Remove and relocate the wiper controller on the console for each vessel listed in 1.3, in accordance with 2.24. Remove and install all new associated cabling for the wiper controller using the same size and type of that removed and in accordance with 2.11, 2.12 and manufacturer’s instructions.
3.16 Remove existing and install two (2) new search light connections on the console for each vessel listed in 1.3, in accordance with 2.11.
3.17 Remove existing and install new forward and aft bilge indicator lights on the console for each vessel listed in 1.3, in accordance with 2.11.
3.18 Remove existing and install new 12VDC outlet on the console for each vessel listed in 1.3, in accordance with 2.11.
3.19 Remove existing and install new Whelen microphone and microphone clip (Whelen part number 01-026D286-06) for each vessel listed in 1.3, in accordance with manufacturer’s instructions.
3.20 Remove existing and install two (2) new cable clams on the hardtop for port and starboard side aft penetrations for each vessel listed in 1.3, using the same size and type of that removed and in accordance with manufacturer’s instructions
3.21 Install new forward relay with base for floodlights located inside the console on the port side outboard bulkhead for the vessel listed in 1.3.1, using relay on vessel listed in 1.3.2 as a sample.
SSP: HRMC-029-19 6 of 7 ITEM NO: 321-11-001
3.22 Install new relay with base for floodlights located inside the console on the starboard side outboard bulkhead for the vessel listed in 1.3.1, using relay on vessel listed in 1.3.2 as a sample.
3.23 Remove existing and install new port Tiger Communications push to talk cable inside the console for the vessel listed in 1.3.1, in accordance with 2.11.
3.24 Remove existing and install new port search light connection cable inside the console for the vessel listed in 1.3.1, in accordance with 2.11
3.25 Remove existing and install two (2) new port outboard terminal boards inside the console for the vessel listed in 1.3.1, in accordance with 2.11.
3.26 Remove existing and install new port, aft cable clam inside the console for the vessel listed in 1.3.1, using the same size and type of that removed and in accordance with manufacturer’s instructions.
3.27 Remove existing and install new house battery box cover inside the console for the vessel listed in 1.3.1, in accordance with 2.11 and using the same size and type of that removed.
3.28 Remove existing and install new port start battery box cover inside the console for the vessel listed in 1.3.1, in accordance with 2.11 and using the same size and type of that removed.
3.29 Clean terminals on Control Panel 1 for aft bilge and horn circuit for the vessel listed in 1.3.1.
3.30 Clean terminals on battery switches for port engine, house, starboard engine, and two (2) emergency parallel switches for the vessel listed in 1.3.1.
3.31 Remove existing and install new circuit breakers for port isolation, starboard isolation, pumps, main, and steering for the vessel listed in 1.3.1, in accordance with 2.11.
3.32 Remove existing starboard broken cable clam and install new cable clam inside the console for the vessel listed in 1.3.1, using the same size and type of that removed and in accordance with manufacturer’s instructions.
3.33 Install new port Tiger Communications headset helmet jack dust cap for the vessel listed in 1.3.1, using starboard side dust cap as a sample.
3.34 Remove existing and install new windshield washer tank with pump (Schmitt part number 31130) inside the console on the port side for vessel listed in 1.3.2, in accordance with 2.12.
3.35 Install new VHF remote microphone and microphone clip (ICOM part number HM157B) for vessel listed in 1.3.2, in accordance with 2.11.
3.36 Remove existing and install new seven-way flat pin, round cable harness for each trailer listed in 1.3, in accordance with 2.23. Cable harness shall be spliced in accordance with 2.2.
3.37 Remove existing and install new port and starboard taillights for each trailer listed in 1.3, using the same size and type of that removed and in accordance with manufacturer’s instructions.
3.38 Remove existing and install new aft center light for each trailer
SSP: HRMC-029-19 7 of 7 ITEM NO: 321-11-001 listed in 1.3, using the same size and type of that removed and in accordance with manufacturer’s instructions.
(V)(G) "TRAILER LIGHTS OPERATIONAL TEST"
3.39 Operationally test all trailer lights to ensure they are functioning properly.
3.39.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the operational testing results of 3.39, within 3 days of test completion.
(V)(G) "ELECTRICAL EQUIPMENT OPERATIONAL TEST"
3.40 Coordinate with ships force and accomplish an Operational Test of each piece of newly installed electrical equipment, each electrical device, and each newly installed component listed in the contractor's furnished report requirement of 3.2.1.1, Testing shall be in accordance with 2.2 through 2.24 and the manufacturer's instructions, for each vessel listed in 1.3.
3.40.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the operational testing results of 3.40, within 3 days of test completion.
3.41 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces, for each vessel listed in 1.3.
4. NOTES:
4.1 Possible Cable Clam source: Blue Sea Systems (www.bluesea.com).
4.2 Work in conjunction with 11MSC1407 and 11MSC1408 work packages 236- 11-001, 581-11-001 and 631-11-001.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
UNIT (RMC 55457)
ITEM NO: 581-11-001
COAR: 26 PCN: SERV-L017
SERV-L018
CMP: NONE
PLANNER: UEHARA, CHRISTOPHER
SSP: HRMC-029-19 1 of 6 ITEM NO: 581-11-001
1. SCOPE:
1.1 Title: RHIB Silver Ships; repair
1.2 Location of Work:
1.2.1 Throughout the Vessel.
1.3 Identification:
1.3.1 Quantity (One EA), 11 Meter RHIB, (OPEN), Hull Identification Number: 11MSC1407
1.3.2 Quantity (one EA), 11 Meter RHIB, (OPEN), Hull Identification Number: 11MSC1408
1.3.3 Quantity (One EA), 11 Meter RHIB Trailer, Trailer Serial number: 42XBK3631EB114671
1.3.4 Quantity (one EA), 11 Meter RHIB Trailer, Trailer Serial Number 42XBK3635EB114673
2. REFERENCES:
2.1 Standard Items, (FY-20)
2.2 5107858, Standard Electrical Installation Requirements and Nomenclature
2.3 MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines
2.4 TO300-AU-SPN-010 A, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls
2.5 11X42-DI-CC-O1, 11X AM Series Drawing Index
2.6 11X42-OB-CC-01, Outboard Plan and Profile
2.7 11X42-IB-CC-01, Inboard Plan and Profile
2.8 11X42-HS-CC-01, Structure Arrangement
2.9 11X42-CA-CC-01, Console Electronics Arrangement
2.10 11X42-CO-CC-01, Collar System Plan View
2.11 11X42-E-CC-01, Electrical Systems
2.12 11X42-AS-CC-01, Auxiliary Systems
2.13 11X42-F-CC-01, Fuel System
2.14 11X42-H-CC-01, Hoisting Arrangement
2.15 11X42-T-CC-01, Towing Arrangement
2.17 11X42-D-CC-01, Misc. Parts
SSP: HRMC-029-19 2 of 6 ITEM NO: 581-11-001
2.18 SHOXS 6800 , Operation & Service Manual
2.19 Ignition Switch , Wiring
2.20 Fuel Tank, Cap
2.21 Underwater Lights, Mounting Plates
2.22 BRP G2 , Evinrude Installation and Predelivery Guide
2.23 BOATMASTER, Operations Manual Trailer: SS11M-180
2.24 Console , Face Layout
2.25 Systems and Specifications, SSPC Painting Manual, Volume 2
2.26 DOL, OSHA STD 29 CFR 1915, Occupational Safety & Health Standards for Shipyard Employment
3. REQUIREMENTS:
3.1 Retain all removed items for disposition instructions by SUPERVISOR, for each vessel listed in 1.3. At the discretion of the SUPERVISOR, box all removed items for turnover upon boat/trailer turnover.
3.1.1 Submit one legible copy, in a hard copy or approved
transferrable media, of a report listing the results of the requirements of 3.1 to the SUPERVISOR within 3 days of inspection completion.
3.2 All new threaded fasteners shall be corrosion resistant steel (CRES), ASTM A276, Type 316, unless otherwise specified. All nuts shall be self-locking type, unless otherwise specified. One CRES washer shall be used under each bolt head and under each nut. Bolt/stud length shall not exceed less than 1-1/2 threads or more than 5 threads beyond the nut with full thread engagement. For each vessel listed in 1.3.
3.2.1 Apply anti-seize compound, Loctite 34026 marine grade anti-seize or equal, to all new stainless-steel threaded fasteners.
3.3 All new equipment mounted to aluminum shall have corrosion protection tape (3M Scotchrap #51) installed between the mating surfaces unless otherwise noted for each vessel listed in 1.3.
3.4 Remove existing (2 EA) bow door latch, (2 EA) catch and hardware and install (2 EA) new latch, (2 EA) catch and hardware for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.17.
3.5 Remove existing (2 EA) forward inspection soft patch for each vessel listed in 1.3. Drill and tap any sheared screws. Install new hardware using same size and type of that removed and in accordance with 2.17.
Ensure panel is watertight.
3.6 Remove existing bow door seating gasket and install new gasket for each vessel listed in 1.3 using 2.17 as guidance. Template exact size, length, configuration and location from existing vessel conditions.
Ensure bow door is watertight.
3.7 Remove existing (2 EA) dive ladder retaining pins and lanyards and install (2 EA) new retaining pins and lanyards for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.17.
3.8 Replace anchor stowage hatch spring with new spring for each vessel listed in 1.3, using the same size and type of that removed and in
SSP: HRMC-029-19 3 of 6 ITEM NO: 581-11-001 accordance with 2.17.
3.9 Remove existing T-handle spring and install new spring and hardware on forward bilge compartment access hatch for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.17.
3.10 Remove existing fuel valve access hatch T-handle spring and hardware and install new spring and hardware for each vessel listed in
1.3 in accordance with 2.17.
3.11 Remove existing (2 EA) hardtop to console gasket and install (2 EA) new gasket for each vessel listed in 1.3 using 2.17 as guidance. Template exact size, length, configuration and location from existing vessel conditions.
3.12 Conduct 600-hour SHOXS seats maintenance on all seats for each vessel listed in 1.3 in accordance with Section 4 of 2.18.
3.12.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of 600-hour SHOXS seat maintenance for each vessel listed in 1.3 to the SUPERVISOR.
3.13 Remove existing right cushion bolster assembly and hardware and install new right cushion bolster assembly (SHOXS part number 100192) and hardware for each vessel listed in 1.3 in accordance with 2.18.
3.14 Remove existing (2 EA) Coxswain’s armrest mounted pistol grips and install (2 EA) new armrest mounted pistol grips (SHOXS item number 4) for each vessel listed in 1.3 in accordance with 2.18.
3.15 Remove existing dive flag mast pin and lanyard and install new pin and lanyard for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.6.
3.16 Remove existing navigation light mast pin and lanyard and install new pin and lanyard for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.6.
3.17 Remove existing dive restricted light mast pin and lanyard and install new pin and lanyard for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.6.
3.18 Remove existing (2 EA) boat hook holders and hardware and install (2 EA) new boat hook holders (PERKO part number 0492) and hardware for each vessel listed in 1.3.
3.19 Remove existing (2 EA) hardtop to console latch, catch and hardware and install (2 EA) new latch, catch and hardware for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.17. Ensure proper alignment of all latches after installation.
3.20 Remove existing (4 EA) aft deck lift off hatch latches and hardware and install new (4 EA) latches and hardware for each vessel listed in 1.3, using the same size and type of that removed and in accordance with
2.17. Ensure latches fasten and align properly.
3.21 Remove aft deck lift off cover for each vessel listed in 1.3. Clear debris from deck drain and re-install cover for each vessel listed in 1.3.
3.22 Remove deck drain hose and hose clamps and install new drain hose and hose clamps for each vessel listed in 1.3, using the same size and type of that removed.
SSP: HRMC-029-19 4 of 6 ITEM NO: 581-11-001
3.22.1 Double CRES 316 stainless steel hose clamps shall be
installed at hose to fitting connections.
3.23 Remove aft deck lift off hatch gasket and install new gasket on vessel listed in 1.3, using 2.17 as guidance. Template exact size, length, configuration and location from existing vessel conditions.
Ensure hatch is watertight.
3.24 Remove existing aft soft top canvas and fabricate and install new canvas canopy using the existing canvas canopy as a template for each vessel listed in 1.3, using 2.17 as guidance. New canopy shall be gray and fabricated from heavy duty marine grade material.
3.25 Remove (20 EA) existing plastic threaded hex head inserts for the second-row student seat and install (20 EA) new plastic threaded hex head inserts for each vessel listed in 1.3. Template exact size, length, configuration and location from existing vessel conditions.
3.26 Remove existing stern dive ladder stowage latch and hardware and install new latch and hardware for each vessel listed in 1.3, using the same size and type of that removed and in accordance with 2.17.
3.27 Remove existing (3 EA) engine bracket…