YRBM-53_SSPH-027-16_Package_REV1.pdf

PDF 570 KB Posted

Attached to
YRBM-53 - Fumigation & Misc Modifications/Repairs Federal contract opportunity
Solicitation number
N32253-16-T-0024
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Specification Number SSPH-027-16

View the file

Other files for this federal contract opportunity

Other files attached to YRBM-53 - Fumigation & Misc Modifications/Repairs, newest first.
File Type Posted
N32253-16-T-0024_0001.pdf PDF
099-01_thru_07_2010_with_FOUO_pages_removed.pdf PDF
N32253-16-T-0024.pdf PDF
OSHCTRMOA.doc DOC document
099-10PH_RMMCO_Check-In.pdf PDF
Environmental_Guide_for_Ktr_on_Ship_Projects.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

HRMC (NMD)

YRBM 53 (RMC 22807)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSPH-027-16

INCLUDES ALL CHANGES THROUGH 9/1/2016

INDEX

SHIP: YRBM 53 (RMC 22807) SSPH-027-16

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-17 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 07/18/2014

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014

009-03 Toxic and Hazardous Substances; control 07/18/2014

009-04 Quality Management System; provide 07/18/2014

009-05 Temporary Accesses; provide 07/18/2014

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

07/18/2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/18/2014

009-08 Fire Protection at Contractor's Facility; accomplish 07/18/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014

009-18 Magnetic Material; control 07/18/2014

009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014

009-20 Government Property; control 07/18/2014

009-21 Logistics and Technical Data; provide 07/18/2014

009-23 Interferences; remove and install 07/18/2014

009-24 Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements;

accomplish

07/10/2015

009-28 Fire Prevention Requirements; accomplish 06/10/2014

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

07/18/2014

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

07/18/2014

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

09/01/2015

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 07/18/2014

009-69 Heavy Weather/Mooring Plan; provide 07/18/2014

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

07/18/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 07/18/2014

009-74 Occupational, Safety and Health Requirements; accomplish 07/10/2015

009-77 Cofferdam Requirements; accomplish 07/18/2014

009-79 Government Owned Material (GOM); status reporting 07/18/2014

ITEM_NO. TITLE DATE

009-80 Ship's Facilities; provide 07/18/2014

009-81 Compartment Closeout; accomplish 07/18/2014

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

07/29/2011

009-83 Wire Rope Fitting Verfication; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 07/18/2014

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

08/01/2008

009-87 Chemical disinfection Procedures; accomplish 07/18/2014

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/18/2014

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

07/18/2014

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 07/18/2014

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/18/2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/18/2014

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/18/2014

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

07/18/2014

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014

009-118 CG Deck Loading; accomplish 07/18/2014

009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014

009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014

ITEM NO. TITLE

077-11-001

167-11-001

324-17-001

332-11-001

436-11-001

501-90-001

603-28-001

992-16-001

Hazardous Waste Produced on Naval Vessels; control

Watertight Scuttle; replace

Emergency Exit Lights; replace

Lighting Fixture; repair

Fire and Flooding Alarm System Modifications; accomplish

CHT System Upgrades; accomplish

Accommodation Ladder Modification; accomplish

Fumigation; accomplish

SHIP:

YRBM 53 (RMC 22807) ITEM NO: 077-11-001

COAR: 28 PCN: PE16-A006

CMP: NONE

PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 5 ITEM NO: 077-11-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as

SHIP: YRBM 53 (RMC 22807)

SSP: SSPH-027-16 2 of 5 ITEM NO: 077-11-001 hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

SSP: SSPH-027-16 3 of 5 ITEM NO: 077-11-001

Cleaning Solvents _____ ____________ __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Ignitable)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________ __________

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ __________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludges (Contaminated with _____ ____________ __________ a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Lube/Fuel Oil Soaked Rags _____ ____________ __________

Paint/Flakes (Pressure Washing _____ ____________ __________

Ext Hull Surfaces)

Fuel Oil(Residual) _____ ____________ __________

SSP: SSPH-027-16 4 of 5 ITEM NO: 077-11-001

Bilge Water _____ ____________ __________

Oil/Water _____ ____________ __________

AFFF/Water _____ ____________ __________

MEK Contaminated Rags _____ ____________ __________

3.5.1 Provide zero dollars for managing and disposing of all

hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed

SSP: SSPH-027-16 5 of 5 ITEM NO: 077-11-001 the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or apply knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

YRBM 53 (RMC 22807) ITEM NO: 167-11-001

COAR: 28 PCN: PE16-L003

CMP: NONE

PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 1 ITEM NO: 167-11-001

1. SCOPE:

1.1 Title: Watertight Scuttle; replace

1.2 Location of Work:

1.2.1 Main Deck

1.3 Identification:

1.3.1 Quantity (12 EA), Scuttle Low PF, 21" DIA, QA WTRTT, Steel, Item No. 201 of 2.2

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 167-6831736 Rev B, Schedule Of Openings

3. REQUIREMENTS:

3.1 Remove existing and install new 12 each watertight scuttles listed in 1.3, in location listed in 1.2.1, in accordance with item 201 of 2.2.

3.1.1 Template exact size, configuration, and location from existing shipboard conditions.

3.1.2 Chip and grind surfaces flush in way of repairs.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Columns A and D, Lines One through 7.

(V)(G) "(V)(G) "CHALK TEST""

3.3 Accomplish a chalk test of each watertight scuttle listed in 1.3.

Chalk imprint shall be centered with 100 percent contact.

3.4 Accomplish the requirements of 009-25 of 2.1 for air hose test of each watertight scuttle listed in 1.3. Allowable leakage: None.

3.5 Accomplish the requirements of 009-32 of 2.1 for all new and disturbed surfaces.

4. NOTES:

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM 53 (RMC 22807) ITEM NO: 324-17-001

COAR: 28 PCN: PE16-L004

CMP: NONE

PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 2 ITEM NO: 324-17-001

1. SCOPE:

1.1 Title: Emergency Exit Lights; replace

1.2 Location of Work:

1.2.1 Throughout Barge

1.3 Identification:

1.3.1 Emergency Exit Lights (23 EA), 120 VAC, 24W, Ceiling MT, SGL Face, (Item 14 of 2.2)

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 331-6831682 Rev E, LIGHTING DECK PLAN

3. REQUIREMENTS:

3.1 Remove and replace with new, emergency exit LED lights listed in 1.3 and located in 1.2., using 2.2 as guidance.

3.1.1 Disconnect and record electrical hook up data.

3.1.2 Chip and grind surfaces flush in way of repairs.

3.1.3 Reconnect electrical cable, using recorded electrical hook up data and 2.2 for guidance. All wiring shall suit new installation.

3.2 Accomplish the requirements of 009-12 of 2.1 including Table 3, Column A, Lines One through 7.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish operational test of the equipment listed in 1.3, in accordance with 2.2.

3.3.1 Cycle test lighting system on and off 3 times. Lights shall show a bright and steady glow.

3.3.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

5.2 PUSH MATERIAL:

SSP: SSPH-027-16 2 of 2 ITEM NO: 324-17-001

1. None.

YRBM 53 (RMC 22807) ITEM NO: 332-11-001

COAR: 28 PCN: PE16-A005

CSWT FILE NO: 332-001 CMP: NONE

REVISED: 07 Feb 2015 PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 2 ITEM NO: 332-11-001

1. SCOPE:

1.1 Title: Lighting Fixture; repair

1.2 Location of Work:

1.2.1 Throughout The Barge

1.3 Identification:

1.3.1 Quantity (405 EA); Emergency Light Fixtures,(Items 9 and 10 listed in 2.2)

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 331-6831682 Rev E, Lighting Deck Plan

2.3 803-5184170, Extension Hangers For Fluorescent Lighting Fixtures

2.4 MIL-STD-1310, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety

3. REQUIREMENTS:

3.1 Remove and replace with new, LED light fixtures listed in 1.3 and located in 1.2., using 2.2 and 2.3 as guidance.

3.1.1 Disconnect and record electrical hook up data for cable and coil back for reconnection.

3.1.2 Chip and grind surfaces flush in way of repairs.

3.1.3 Reconnect electrical cable, using recored electrical hook up data and 2.2 for guidance. All wiring shall suit new installation.

3.1.4 Bond and ground electrical equipment and cables in accordance with 2.4.

3.1.5 New lighting fixtures shall be similar, except with LED bulbs, to item 10 of 2.2.

3.1.6 Height of all new lighting fixtures shall be similar to existing.

3.1.7 Fabricate and install new light fixture foundations for each light fixture, as shown on sheet 2 or 5 of 2.3.

(V)(G) "OPERATIONAL TEST"

3.2 Accomplish operational test and verify each electrical device and component unit installed, repaired, modified and relocated by this work item operates in accordance with 2.2

3.2.1 Test lighting system by cycling the lights on and off for a total of 3 times. Verify illumination in the "on" position and that lights are extinguished in "off" position.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

SSP: SSPH-027-16 2 of 2 ITEM NO: 332-11-001 surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM 53 (RMC 22807) ITEM NO: 436-11-001

COAR: 28 PCN: PE15-A003

CMP: NONE

PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 2 ITEM NO: 436-11-001

1. SCOPE:

1.1 Title: Fire and Flooding Alarm System Modifications; accomplish

1.2 Location of Work:

1.2.1 Throughout Barge

1.3 Identification:

1.3.1 Fire & Flooding, H2S, and Halocarbon Alarm Systems

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 111-8429902, INTRUSION ALM BHD MODS

2.3 113-8429901, MISC FDNS & FIDDLEBOARD INSTL INCDT FIRE / FLOODING ALM

2.4 113-8573194, FDN INSTL INCID TO F & FLDG ALM UPG

2.5 113-8573200, FDNS INCI TO STRONG RM PWR UPG

2.6 302-8573818, PWR SYS MOD INCID FF, H2S, HALO ALM UPGR

2.7 436-7646184, MOD TO FIRE FLDG ALM SYS

2.8 436-7647064 Rev A, INSTALL H2S ALM SYS

2.9 436-7647065, INSTALL AIR FLOW ALM SYS

2.10 436-8429895, FIRE & FLOODING ALARM SYSTEM CKT F & FD

2.11 436-8429896, FIRE & FLOODING ALARM SPECIFICATION

2.12 436-8519262, INSTL ADDR F & FLDG ALM SYS

2.13 436-8519263, MISC ALM SYS UPGR

2.14 BGPRHB_8201, LAR VARIOUS

3. REQUIREMENTS:

3.1 Accomplish the removal of existing and the installation of new equipment listed in 1.3 in accordance with the requirements of 2.2 through 2.14.

3.1.1 Accomplish the requirements of 009-22 of 2.1 for newly

installed, existing, rerouted and modified cabling.

3.1.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.1.3 Accomplish the requirements of 009-25 of 2.1 for the local air hose test of all new welds and inserts. Allowable leakage: None.

3.2 Identify all cabling and equipment by installing nameplates, cable and wire markers in accordance with 2.2 through 2.13.

3.2.1 Nameplates shall conform to MIL-P-15024.

(V)(G) "OPERATIONAL TEST"

SSP: SSPH-027-16 2 of 2 ITEM NO: 436-11-001

3.3 Accomplish an operational test of the Fire and Flooding, H2S, and Halocarbon alarm systems, make adjustments to verify operational performance, using 2.2 through 2.14 as guidance.

3.3.1 Provide the services of an authorized factory technical representative to program and test fire and flooding alarm system.

3.3.1.1 Provide systems operational training to the barge

maintenance personnel.

3.3.2 Circuits shall be inspected and verified for correct fusing, phasing and circuit breakers. Record results.

3.3.3 Cycle on and off, reset, float, smoke, and air flow switches and circuit breakers from full off to full on, a minimum of four successful times. Verify activation and deactivation of associated alarm indicators, equipment and indicator lights every cycle of switches. Record results.

3.3.4 Indicator lights shall show and maintain a bright and steady glow when activated, alarms shall sound in main and remote locations as required. Record results.

3.3.5 Submit one copy, in approved transferrable media, of a report listing the results of 3.3 as directed by the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for all new and disturbed areas.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM 53 (RMC 22807) ITEM NO: 501-90-001

COAR: 28 PCN: PE16-L008

CMP: NONE

PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 3 ITEM NO: 501-90-001

1. SCOPE:

1.1 Title: CHT System Upgrades; accomplish

1.2 Location of Work:

1.2.1 CHT Pump Room (2-36-2-E)

1.3 Identification:

1.3.1 Quantity (2 EA), Numbers 1 and 2 CHT Pumps

1.3.1.1 Quantity (2 EA), Numbers 1 and 2 Motors, Mfr ID:

5K215NN6705, 7.5 HP, 1745 RPM, Frame: 215 TNCZ, Mfr: General Electric, APL: 175505054

1.3.1.2 Quantity (One EA), Controller-Duplex, MAG, LVP, SZ 1, 440V, 60 HZ 1SPD 1WDG DRPR, Mfr ID: 194B7582G1S2, Mfr: General Electric, APL: 986000842X

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 545-8429137, ARR Mod Incid to CHT System Upgrade

2.3 302-8429216, Pwr Sys Mod Incid to CHT Sys Upgrade

2.4 401-7647066, Install Sound Pwrd Phone CKT Incd CHT

2.5 436-7647064 A, Install H2S Alm Sys

2.6 436-7647065, Install Air Flow Alm Sys

2.7 501-7647109, Vent Mod CHT Pmp Rm

2.8 593-7647074, Sewg CHT Sys Instr Plts

2.9 803-7647108, Test Memo CHT Pmp Rm Padeye

2.10 593-66012, MACHALT-Sanitary Waste Holding Tank Flanged Level Censor

Replacement

2.11 S9086-CH-STM-030/CH-074 Rev 4, Naval Ships' Technical Manual

Chapter 074 Volume 3 - Gas Free Engineering

2.12 PHNSY & IMF C/400 Reference #106.3-001, VCHT/CHT Tank(s) Cleaning and Entry

2.13 MIL-STD-777, Schedule of Piping, Valves, Fittings, and Associated

Piping Components for Naval Surface Ships

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 through 2.12, and using 2.13 as guidance, for removals, modifications, and installations of the equipment listed in 1.3 and located in 1.2.

3.1.1 Open, empty, clean, render dry, ventilate, and maintain the tank located in 1.2.1, "Safe for Workers" and "Safe for Hot Work".

3.1.2 Accomplish a visual inspection of the CHT tank for existing

SSP: SSPH-027-16 2 of 3 ITEM NO: 501-90-001 preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tanks vents, overflows, piping, structural members, anodes, manhole covers, and to validate the proposed piping arrangements prior to performing work.

3.1.2.1 Submit one legible copy, in approved transferrable media within 48 hours of completion of inspection, of a report listing the results of the requirements of 3.1.2.

3.1.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Columns A and B, Lines One through 10 and Table 3, Column A, Lines One through 7.

3.1.4 Accomplish the requirements of 009-71 of 2.1 for new and disturbed piping.

(V)(G) "(V)(G) "TANK INSPECTION""

3.2 Inspect each tank for cleanliness prior to final closing.

(V)(G) "(V)(G) "OPERATIONAL TEST""

3.3 Accomplish an operational test of equipment, piping, electrical components and controls for proper operation within their control limits as specified in 2.2 and 2.3.

3.3.1 Verify proper direction of rotation for the new CHT motors.

3.3.2 Measure and record cold insulation resistances of windings to ground using a 500-volt megger.

3.3.3 Measure and record voltage to verify that the recordings are in accordance with nameplate data.

3.3.4 Accomplish an operational check on the controllers to ensure both automatic and manual operation is satisfactory.

3.3.4.1 Submit one legible copy, in approved transferrable

media, within 48 hours of completion of testing of a report listing the results of the requirements of 3.3.1 through 3.3.4.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: SSPH-027-16 3 of 3 ITEM NO: 501-90-001

YRBM 53 (RMC 22807) ITEM NO: 603-28-001

COAR: 28 PCN: PE16-L011

CMP: NONE

PLANNER: CROWELL, ROBERT

SSP: SSPH-027-16 1 of 2 ITEM NO: 603-28-001

1. SCOPE:

1.1 Title: Accommodation Ladder Modification; accomplish

1.2 Location of Work:

1.2.1 Throughout The Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 302-8573815 Rev A, PWR SYS MOD INC TO ACCOM LDR DAVIT & NEW QTRDK

INSTL

2.3 603-8517984 Rev A, ACCOM LDR & DAVITS INSTL

2.4 603-8622890, ACCOM LDR UPGR HOIST CONV

2.5 803-8517985, ACCOM LADDER STATIC TEST MEMO

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 through 2.4 for the

installation/modification of the quarterdeck enclosure, accommodation ladder assembly and support structures.

3.1.1 Accomplish the requirements of 009-11 of 2.1, for new

insullation

3.1.2 Accomplish a chalk test on each structural closure listed in

2.2. Chalk imprint shall be centered with 100 percent contact.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A and D, Lines One through 7.

3.3 Accomplish the requirements of 009-25 for air hose test of all new structural boundary welds. Allowable leakage: None.

(I)(G) "(I)(G) "LOAD TEST""

3.4 Accomplish ladder and davit test in accordance with 2.5.

3.4.1 Submit one legible copy, in hard copy or electronic media, of completed test memorandum 2.5 to the SUPERVISOR within 72 hours of completion.

3.5 Accomplish the requirements of 009-32 of 2.1 for all new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

SSP: SSPH-027-16 2 of 2 ITEM NO: 603-28-001

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM 53 (RMC 22807) ITEM NO: 992-16-001

COAR: 28 PCN: PE16-L009

CMP: NONE

PLANNER: DEFRIES, JACOB

SSP: SSPH-027-16 1 of 2 ITEM NO: 992-16-001

1. SCOPE:

1.1 Title: Fumigation; accomplish

1.2 Location of Work:

1.2.1 Throughout the Barge

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY-17)

3. REQUIREMENTS:

3.1 Prepare and accomplish 2 full cycles of fumigation of all interior spaces except void tanks of the barge using a gas fumigant to eliminate cockroaches and other pests. Gas fumigant shall not leave any residue on any surface in the space that has been treated. Each cycle of fumigation shall be at 4 times the normal level or the maximum level allowed by Hawaii State regulation, whichever is less.

3.1.1 The 2 full cycles shall be at a minimum of one week apart between cycles and shall require demobilization and remobilization between each cycle to allow for interfering repair work to take place.

3.1.2 Submit a report stating the normal level of concentration of gas fumigant usage level and the maximum amount to be use by the fumigation allowed by Hawaii State regulation.

3.1.3 Take all safety precautions to prevent fire and unauthorized entry of personnel into craft during fumigation operation.

3.1.4 The second cycle of fumigation shall occur one week after completion of the first fumigation cycle or as designated by the

SUPERVISOR.

3.1.5 Protect, blank, wrap, cover or mask food equipment to prevent entry of fumigation gas into food storage areas. Food equipment are refrigerators, freezers, milk and juice dispensers, ice machine and ice cream machine. Areas to protect are the areas where the food is actually stored. Areas outside of the storage part of the machine shall be fumigated.

3.1.6 Cover all exterior vent openings to prevent the escape of fumigation gas into the atmosphere during the incubation period.

3.2 Remove trash, rodents, and loose debris and vacuum clean the entire interior of the barge and each space after completion of tent fumigation.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

SSP: SSPH-027-16 2 of 2 ITEM NO: 992-16-001

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM-53 SSPH-027-16 Index
YRBM-53 SSPH-027-16 Work Items

File details come from the government source that posted it. Updated .