776_Firewatch_PWS.pdf
PDF 23 KB Posted
- Attached to
- Firewatch/Tankwatch Services Federal contract opportunity
- Solicitation number
- N32253-16-T-0005
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_Training_Standard.pdf | ||
| Attachment_8_009-07_FY16.pdf | ||
| Attachment_1_Trade_Description.docx | DOCX document | |
| Attach_5_Safety_Addendum_Rev._14MAR2013.pdf | ||
| Attachment_2_Resource_Estimate.docx | DOCX document | |
| Attach_7_Nuclear_Addendum_Rev._NOV2010.pdf | ||
| Attach_4_Security_Addendum_Rev.__OCT_2013.pdf | ||
| Attach_6_Environmental_Addendum_Rev._17JAN13.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SCOPE:
1.1 Pearl Harbor Naval Ship Yard & IMF Trade Support Services; provide PHNSY &
IMF Firewatch/Tankwatch (FW/TW) resources and Competent Person services from 04/04/2016 – 09/30/2016.
2. REFERENCES/PLANS:
2.1 Attachment(1) Trade Descriptions
2.2 Attachment(2) Resource Estimate
2.3 Attachment(3) Training Standard
2.4 Attachment(4) Security Addendum (Rev. OCT 2013)
2.5 Attachment(5) Safety Addendum (Rev. 14MAR13)
2.6 Attachment(6) Environmental Addendum (Rev. 17JAN13)
2.7 Attachment(7) Nuclear Addendum (Rev. 11 NOV 2010)
2.8 Attachment(8) NAVSEA Standard Item 009-07 (FY16)
1. REQUIREMENTS:
1.1 Provide a total of, not to exceed, 1782 MANDAYS (1485 MANDAYS ST & 297
MANDAYS OT) of the following trade services support at PHNSY.
3.1.1 Journey Level Firewatch/Tankwatch support services.
1.1.1.1 Provide RED badge Firewatch/Tankwatch to support services from
04/04/2016 – 09/30/2016. Total 1584 MANDAYS (1320 MANDAYS ST &
264 MANDAYS OT).
1.1.1.2 Provide RED badge Firewatch/Tankwatch Supervisor from 04/04/2016 – 09/30/2016. Total 158 MANDAYS (132 MANDAYS ST & 26 MANDAYS OT). Trade supervisor support services to support the trades identified in 3.1.1.1. In addition, the Supervisor is required to have a minimum of 1 year experience as a Supervisor in the trade.
1.1.2 Competent Person Support services.
1.1.2.1 The competent person service may only be utilized
intermittently, estimate is 40 MANDAYS (33 MANDAYS ST & 7
MANDAYS OT).
1.2 Description/Specification/Work Statements
See Attachment (1) Trade Descriptions
1.3 Training
1.3.1 PHNSY & IMF Provided Training:
1.3.1.1 Contractor Indoc (Course 070-A110)
1.3.1.2 Non-Nuclear Quality Control
1.3.1.3 SUBSAFE Awareness
1.3.1.4 Safety/Environmental Awareness
1.3.1.5 Fire Watch/Tank Watch Brief
1.3.2 Contractor Furnished Training:
1.3.2.1 Fire Watch – contractor personnel provided must be trained in accordance with Naval Ships' Technical Manual Chapter 074 Volume 1, Welding and Allied Processes, S9086-CH-STM-010/CH- 074V1 (Revision 5), Section 074-10.8 (Fire Prevention and Control of Damage from Hot Work Processes)and NAVSEA Standard Item 009-07 paragraph 3.3
1.3.2.2 Confined Space Safety – contractor personnel provided must be trained in accordance with 29 CFR 1915 Subpart B
1.3.2.3 Negative Pressure Respirator - contractor personnel provided must be trained in accordance with 29 CFR 1910.134
3.5 Equipment
3.5.1 Contractor shall provide all Personal Protection Equipment (PPE) to include: hard hat, safety glasses, safety shoes, noise protection, tank suit, and respirator.
3.6 Management
3.6.1 Maintain accurate account charging for each employee.
3.6.2 Time card shall be fully filled out in typed format
3.6.3 Submit time card for each employee in hard copy
3.6.4 Employee is required to signature in far left block
3.6.5 Home Department: (Block A) = Contractor code
3.6.6 Badge Number: (Block B) = Contractor Badge Number
3.6.7 Employee Name: (Block C) = Last Name, First Name
3.6.8 Charge Department: (Block E) = PHNSY Code
3.6.9 Home Foreman: (Block F) = Contractor Foreman
3.6.10 Notes:
3.6.10.1 Signature of government SUPERVISOR
3.6.10.2 Badge Number of government SUPERVISOR (xx-xxxxx)
3.6.10.3 Date
3.6.11 Provide overall management, oversight and supervision to ensure proper execution to effectively manage the work of this order.
3.6.12 Resolve contractor personnel problems.
3.6.13 Ensure contract labor hours are reported daily by Task Group
Instruction (TGI), Deficiency Log (DL), or Deficiency Report (DR).
This can be accomplished by reporting by job order and key-op.
3.6.14 Maintain total program oversight
2 NOTES:
4.1 The Shop Contract Surveillance Representative (CSR) and Trade Point of
Contact for this PWS is Code 920 Shop Resource Manager, Kennedy Sumajit, #(808) 473-8000 X3104 or #(808) 368-0155. Contractors to send names, and pertinent info for security and training qualifications no later than fourteen (14) calendar days prior to reporting to PHNS & IMF.
4.2 Security/Names: Email to kennedy.sumajit@navy.mil
4.3 Training/Names: Email to kennedy.sumajit@navy.mil
5 GOVERNMENT FURNISHED EQUIPMENT(GFE):
5.1 Special tools, if applicable.
5.2 Should specialized tools be required from shipyard tool room, contractor agrees to return tools and reimburse the government for any tools lost or damaged mailto:kennedy.sumajit@navy.mil
File details come from the government source that posted it. Updated .