N3220523R4059 RFP Attachment E.xls

XLS spreadsheet 54 KB Posted

Attached to
25-day Dry Cargo Time Charter Federal contract opportunity
Solicitation number
N3220523R4059
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a technical evaluation spreadsheet for a 25-day dry cargo time charter solicitation. The solicitation is for a vessel capable of transporting a minimum of 250 TEU of ammunition between Jacksonville, FL and Agadir, Morocco over 25 days, with a layday of April 20, 2023. The evaluation spreadsheet requires bidders to specify how their vessel and proposal meet various technical requirements, including vessel name and flag, cargo capacity of a minimum 250 TEU and 33,400 pounds, hazardous material carriage capability, minimum speed of 13 knots, certifications, and safety plans. Bidders must also specify delivery and redelivery locations and ranges, charter period, laydays, and whether their vessel and crew can meet health and safety standards. The related federal contract opportunity provides additional details on the solicitation number, name, type, description, and issuing agency, the Department of the Navy Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to 25-day Dry Cargo Time Charter, newest first.
File Type Posted
N3220523R4059 RFP Attachment E.xls XLS spreadsheet
N3220523R4059 RFP.pdf PDF
DRYTIME Fuel Consumption Temp.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP RESPONCE

Technical Evaluation responses for:25-Day Dry Cargo Time Charter
RFP Number:N3220523R4059
Port Rotation:Jacksonville, FL. (USA)

Agadir, Morocco

Charter Days:25
Layday:20-Apr-23
DETAILDETAILDETAILACKACKACKACKACKACKACKACKACKACKACKDETAILACKACKACKACKACKACKACKDETAILDETAILDETAILDETAILDETAILDETAILDETAILDETAILACKDETAILACK
Box 1ABox 1ABox 1ABox 1BBox 1CBox 1DBox 1EBox 1FBox 2Box 2Box 3Box 4Box 5Box 6A1, 3-4Box 6A2Box 6BBox 6CBox 6D, Part V(i)Box 6E, Part V(j)Box 6F. Part V(k)Box 6G Part V(l)Box 6H, Part V(m)1Box 6H, Part V(m)2.Box 6H, Part V(m)3.Box 6H, Part V(m)4.Box 6H, Part V(m)6.Box 6H, Part V(m)7.Box 6I, Part V(n)Box 6J, Part V(o)Box 6KBox 6LPART III(c)viPart xi( e)a
VESSEL NAME:FlagSelf-sustainingCargo CapacityHazard Class MaterialContainer
DescriptionMinimum Military CapacityMinimum Laden speedCargo ListPlace / Range of DeliveryPlace / Range of DeliveryPlace / Range of RedeliveryCharter PeriodLaydays / ETAHealth & Safety RequirementsCrew's Health and Safety PlanDocumenta-tionSuper Cargo (Min 2)Lashing GearSpreader BarSegregationSelf-sustainingDOCSMCISSCCOIIMDG835'sStow PlanFully BunkeredClassified RequirementOffer DetailPosition ReportsCharter day CountsTechnically Acceptable
OWNERS:US / FFYESMinimum 250 AMMO TEU's1.1 - 1.4SAvg: 33,400 lbs
Max: 33,400 lbs1000 FT/305 meters29.5 FT/8.9 meters13 KNYESJacksonville, FL. (USA)Agadir, Morocco20 days26-Apr-2023YESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYES/ NOCOMMENTS
Instructions: please answer in all highlighted cells with ability to meet reqwuirement (YES or NO), where the information can be found in the proposal, and information detail if required. See "example" tab for sample response.YES or NO
Where information is found in proporsal
Details on information (if no details are necessary, write N/A)

example

Technical Evaluation responses for:MISSION NAME
RFP Number:RFP#123456
Port Rotation:New York, NY, USA - Miami, FL, USA
Charter Days:4 days
Layday:6-Mar-22
DETAILDETAILDETAILACKACKACKACKACKACKACKACKACKACKACKDETAILACKACKACKACKACKDETAILACKDETAILDETAILDETAILDETAILDETAILDETAILDETAILACKACK
Box 1ABox 1ABox 1ABox 1BBox 1CBox 1DBox 1EBox 1FBox 1GBox 2Box 3Box 4Box 5Box 6A1, 4-7Box 6A2Box 6A3Box 6BBox 6CBox 6D, Part V(i)Box 6E. Part V(j)Box 6F. Part V(k)Box 6G, Part V(l)Box 6H, Part V(m)1.Box 6H, Part V(m)2.Box 6H, Part V(m)3.Box 6H, Part V(m)4.Box 6H, Part V(m)6.Box 6H, Part V(m)7.Box 6I, Part V(n)Box 6J,
Part V(o)Box 6K
VESSEL NAME:M/V American LibertyFlagSelf-sustainingCargo CapacityHazardous MaterialContainer DimensionsLength Over AllLaden DraftMinimum Laden speedPacking ListPlace / Range of DeliveryPlace / Range of RedeliveryCharter PeriodLaydays / ETAHealth & Safety RequirementsCrew's Health and Safety PlanCrew Change
(ROM)Documenta-tionSuper Cargo (Min 2)Lashing GearSpreader BarSegregationSelf-sustainingDOCSMCISSCCOIIMDG835'sStow PlanFully BunkeredClassified RequirementTechnically Acceptable
OWNERS:Blue Ocean Transportation Company LLCUS / FFYES____TYPESDETAILSMaximum
___ FT/ ___MMaximum
___FT/___M___ KNYESYESYES_____ daysDATEYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYES/ NOCOMMENTS
Instructions: please answer in all highlighted cells with ability to meet reqwuirement (YES or NO), where the information can be found in the proposal, and information detail if required. See "example" tab for sample response.YES or NOYES;YES;YES;YES;YES;NO;YES;YES;YES;YES;YES;YES;NO;YES;YES;YES;YES;NO;YES;YES;YES;YES;YES;YES;YES;YES;YES;YES;YES;To be completed by MSCTo be completed by MSC.
Where information is found in proporsaloffer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 1offer page 2offer page 3offer page 3offer page 3offer page 3offer page 3offer page 3Stoe PlanOffer page 3attached DOCattached SMCattached ISSCattached COIattached IMDG papersattachedoffer page 2
Details on information (if no details are necessary, write N/A)Vessel is US flagVessel has x2 cargo cranes, side ramp, stern ramp…Vessel cargo capacity is 457 TEUAble to carry hazardout material up to class 1.4.N/ALOAMax Draft 10.7 M.Max SOA 15 KN.Asked for and received cargo list.N/AN/AN/ACan make layday of 8 MARN/AHealth and Safety plan attached.N/AN/ANot able to accommodate.N/AN/ASee stow plan for cargo segregation plan.N/ASee attached document.See attached document.See attached document.See attached document.See attached document.N/A

File details come from the government source that posted it. Updated .