20R4134 A0001 Reopen-Laydays.pdf

PDF 56 KB Posted

Attached to
Dry Cargo Voyage Charter Federal contract opportunity
Solicitation number
N32205-20-R-4134
Issued by
Department of the Navy Military Sealift Command

About this file

This document amends a request for proposals for a dry cargo voyage charter. The amendment changes the load port to the Military Ocean Terminal in Concord, California with an available load date of August 25, 2020. The discharge port is specified as West Loch, Hawaii with an earliest and latest arrival date of September 8 through September 10, 2020. Offerors must propose a two-day layday window that meets the load date in Concord and arrival date in West Loch. Self-sustaining equipment in the form of a contractor-provided crane barge or floating crane is now required for discharge in West Loch as pier cranes are prohibited. Offerors must specify the intended self-sustaining equipment and provide a crane operator. The offer due date is amended to August 3, 2020 at 1:00pm Eastern Time. All other terms and conditions remain unchanged.

View the file

Other files for this federal contract opportunity

Other files attached to Dry Cargo Voyage Charter, newest first.
File Type Posted
FAR 52.204-25.pdf PDF
FAR 52.204-26.pdf PDF
20R4134 A0004 Reopen.pdf PDF
FAR 52.204-24.pdf PDF
WD 19-0288 Rev 4.pdf PDF
Shipyard Data Template for Offeror.xlsx XLSX spreadsheet
20R4134 RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29 JULY 2020

THIS IS THE MILITARY SEALIFT COMMAND NORFOLK, STRATEGIC SEALIFT

PROGRAM SUPPORT OFFICE, N103A

TO: ALL POTENTIAL OFFERORS

SUBJECT: N32205-20-R-4134, AMENDMENT 0001

REF: (A) MSC RFP N32205-20-R-4134, DATED 20 JULY 2020

1. REF (A) IS HEREBY RE-OPENED.

A. OFFERORS WHO HAD PREVIOUSLY SUBMITTED TIMELY OFFERS MUST

EITHER REAFFIRM THEIR EXISTING OFFER OR RESUBMIT IT. FAILURE

TO SUBMIT OR REAFFIRM AN OFFER WILL RESULT IN THE OFFER NOT

BEING CONSIDERED FOR AWARD.

B. ALL OTHER OFFERORS MUST SUBMIT THEIR ENTIRE OFFER TO BE

CONSIDERED FOR AWARD.

C. OFFERS OR REAFFIRMED OFFERS MUST BE SUBMITTED BY THE

CLOSING DATE AND TIME SPECIFIED IN BOX 8, FORM 1449.

2. REF (A) IS HEREBY AMENDED AS FOLLOWS (MSC DRYVOY BOXES):

A. AMEND PART I, BOX 3 ‘LOAD PORT(S)/PLACE(S)’, TO READ: “MILITARY

OCEAN TERMINAL, CONCORD (MOTCO), CA / AVAILABLE LOAD DATE

(ALD) 25 AUGUST 2020.”

B. AMEND PART I, BOX 5 ‘DISCHARGE PORT(S)/PLACE(S)’, TO READ: “WEST

LOCH, HAWAII / EARLIEST ARRIVAL DATE AND LATEST ARRIVAL DATE

IS 08 SEPTEMBER 2020. PORT IS RESERVED FOR THIS MISSION FROM 08

SEPTEMBER THROUGH 10 SEPTEMBER.”

C. AMEND PART I, BOX 6 ‘LAYDAYS (COMMENCING/CANCELLING)’, TO

READ: “TWO-DAY WINDOW TO BE PROPOSED BY OFFEROR SUCH THAT

THE ALD OF 25 AUGUST 2020, IN CONCORD, CA AND THE ARRIVAL DATE

OF 08 SEPTEMBER 2020, IN WEST LOCH, HAWAII ARE MET.”

D. AMEND PART 1, BOX 7(I) ‘SELF-SUSTAINING’, TO READ: “NO CRANE IS

PERMITTED ON PIER IN WEST LOCH. CONTRACTOR-PROVIDED CRANE

ON BARGE OR FLOATING CRANES, AT THE CONTRACTOR’S EXPENSE,

WILL EQUATE TO BEING SELF-SUSTAINING. OFFER MUST PROVIDE

SPECIFICATION OF SELF-SUSTAINING EQUIPMENT INTENDED FOR USE

FOR THIS CONTRACT. CONTRACTOR MUST ALSO PROVIDE CRANE

OPERATOR.”

3. STANDARD FORM 1449, BOX 8 ‘OFFER DUE DATE,’ TO READ:

“MONDAY, 03 AUGUST 2020, AT 1300 EASTERN TIME”.

4. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

SIGNED: ROBBIN JEFFERSON, CONTRACTING OFFICER, N103A

File details come from the government source that posted it. Updated .