SOW.docx

DOCX document 36 KB Posted

Attached to
USNS BIG HORN MHE RECERTIFICATION Federal contract opportunity
Solicitation number
N3220520Q0125
Issued by
Department of the Navy Military Sealift Command

View the file

Other files for this federal contract opportunity

Other files attached to USNS BIG HORN MHE RECERTIFICATION, newest first.
File Type Posted
SYNSOL_.docx DOCX document
SYNSOL_.docx DOCX document
TECHNICAL EXHIBIT _ Electric Forklift.docx DOCX document
TECHNICAL EXHIBIT _ Safety Certification.docx DOCX document
TECHNICAL EXHIBIT _ Diesel Forklift.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTE (RFQ)

Date: 29 NOV 2019 (REVISED)

To: HYSTER-YALE Lift Trucks Singapore Pte. Ltd.

16 Tuas Avenue 20 Singapore 638827 Tel: (65) 6863-3387 / FAX: (65) 6863-3349 Mobile: (65) 9145-7599, POC: Zaidi Noor

From:Military Sealift Command (MSC)
Bldg. SP-64, 471 "C" Street, Norfolk VA 23511
Mr. Donnie Leger
Supervisory Contract Officer, N10
757-443-5900

Subject: MHE RECERTIFICATION SERVICE REQUEST ISO USNS BIG HORN

Reference: (a). NAVSEA SW0-23-AH-WHM-10 Eight Revision, Handling Ammunition and Explosives with industrial Material Handling Equipment (MHE) (b). NAVSUP Publication 538 Sixth Revision, Management of Material Handling Equipment (MHE) and Shipboard Mobile Support Equipment (SMSE)

Attachments:(1). Technical Exhibit - Safety Certification Requirements
(2). Technical Exhibit - Maintenance Service Requirements; Electric Forklift
(3). Technical Exhibit - Maintenance Service Requirements; Diesel Forklift

1. Purpose: In accordance with ref (a) and (b), a quote is requested to provide Materials Handling Equipment (MHE) service and support to include an open/inspection, repairs, services, and/or materials. The following information and requirements are hereby provided for planning and pricing purposes. Submission of “Price & Availability Feedback” does not constitute a guarantee of purchase, service contract, or delivery order.

2. Activity/Vessel: USNS BIG HORN

3. Location of Equipment/Services: SEMBAWANG, SINGAPORE (C7F AOR)

4. Period of Performance (POP): 06 JAN 2020 to 05 APR 2020

5. SOR: N2162193194001

6. Statement of Work (SOW): The following work items shall be accomplished by the selected service provider (contractor) in conjunction with this repair and maintenance requirement. The Government intends to award a Fixed Price Contract to the selected service provider:

a. Services to MHE identified in Table 1, below, shall be performed ashore at the Contractor’s maintenance facility. The Contractor’s quote shall specify the proposed location of the service and provide a summary of the proposed process for maintenance, repairs, and safety recertification.

b. If the service provider is capable of arranging transportation of the MHE assets to/from the service provider’s facility, the quote may include a separate line entry for transportation of the assets. If the service provider is unable to arrange transportation, the quote shall specify this and request transportation arrangements.

c. Contractor shall perform all certification, maintenance, repair and tests to MHE identified in Table 1 - in accordance with the requirements set forth in references (a) and (b), attachments 1 through 3 (technical exhibits), and appropriate technical manuals.

d. Contractor shall perform an operational check on all forklift batteries installed in MHE identified in Table 1. Contractor shall provide a condition report on batteries including all recommended repair/replacement actions.

e. Contractor shall perform an operational check on all battery chargers listed in Table 2 to ensure proper operation, voltage, and amperage settings. Contractor shall reset battery chargers in accordance with the specifications provided in the battery charger technical manuals and per direction from the ship’s Chief Engineer.

f. Contractor shall perform basic corrosion control (incl. spot painting, as needed) and proper marking/stenciling on all MHE identified in Table 1. The contractor shall utilize appropriate wire brush and spot painting techniques. Approved spot paint includes brand types: Enamel Gray Primer (V2182838), Black Rust Reformer (215634), Equipment Yellow Paint (V2148838), and Gloss Black paint (V2179838), or equivalent. If full painting is determined to be required, contractor shall include a quote as ‘Additional Work’ for this service as directed in the deliverables section, below.

g. Contractor shall remove, and inspect the counterweight, mounting bolt, and the base plate threads for wear on all shipboard diesel forklifts to include removing the bolt, and counter weights for inspection of rust, corrosion, and worn threads on the bolts, and threaded base plate surface. Contractor shall reinstall the counterweight, and mounting bolts that are within SAE standards, and re-torque the counterweight bolts to 410-foot pounds, or replace the bolts, and rethread the base plates that fail the visual inspection, as required.

h. Contractor shall perform a test of all rear brake systems on standard HYSTER forklifts listed in Table 1 by lifting the rear axle off the ground, applying the brakes and testing the brake operation. Proper operation of the rear master cylinder and wheel cylinders will be verified. Master cylinder and brake drums shall be adjusted to ensure appropriate rotational resistance of the rear wheel with brake pressure applied.

i. Contractor shall provide a condition report on each unit identified in Table 1. All condition reports shall contain, at the minimum, the ship's name, the MSC MHE registration number (ie. 23-XXXXX), manufacturer identification serial number, make and model, a complete list of recommended repairs and services, and all associated pricing information.

7. Equipment to be serviced:

USNS BIG HORN - TABLE 1

MANUFACTURER
MODEL
MSC NUMBER
SERIAL NUMBER
TYPE/SAFETY
HYSTER
E40ZG
23-02333
G108N10752F
STD ELEC
HYSTER
E40ZG
23-02334
G108N10851F
STD ELEC
HYSTER
E40ZG
23-02335
G108N10857F
STD ELEC
HYSTER
S60FTG
23-02179
F187G12292F
STD DIES
HYSTER
S60FTG
23-02386
F187G14585G
STD DIES
HYSTER
S60FTG
23-02181
F187G12294F
STD DIES

USNS BIG HORN - TABLE 2

MANUFACTURER
SERIAL NO.
MODEL
NOMINAL OUTPUT CHARACTERISTICS
B F SYSTEMS INC
8894-1
8826
CHGRBATT440VAC IN 42.3VDC 200AMP MAX OPT
B F SYSTEMS INC
8894-2
8826
CHGRBATT440VAC IN 42.3VDC 200AMP MAX OPT
B F SYSTEMS INC
8894-3
8826
CHGRBATT440VAC IN 42.3VDC 200AMP MAX OPT
B F SYSTEMS INC
8894-4
8826
CHGRBATT440VAC IN 42.3VDC 200AMP MAX OPT

8. Deliverables:

The contractor shall provide:

(1). A condition report for all units listed in Table 1 to the MHE Program Support Office at MSC Norfolk (N44) within 5 days of receipt of MHE. A copy of the condition reports will be provided to the ship’s Master or his designated representative upon request.

(2). A quote for additional repairs and services beyond the scope of the initial contract award. The quote will be provided to the Norfolk and Singapore technical points of contact (listed below) within 10 days of receipt of MHE.

(3). Final condition reports containing all remaining additional work requirements to the MHE Program Support Office no later than 15 days prior to the end of the scheduled Period of Performance (POP) listed in paragraph 4, above.

(4). A complete and signed MHE Safety Certification form for each unit listed in Table 1. The original signed forms shall be provided to the ship's Master or his designated representative.

(5). A complete and signed Fork Inspection form for each unit listed in Table 1. The original signed forms shall be provided to the ship's Master or his designated representative.

(6). Safety Certification Markings stenciled or affixed to each unit listed in Table 1.

(7). A condition report on all batteries installed in electric and diesel forklifts, and, in addition, a condition report for all shipboard MHE battery chargers (as required).

(8). Contractor shall coordinate with the Singapore technical point of contact to arrange U.S. Government inspection of the MHE/forklifts prior to their return. The inspection will occur on a date mutually agreed upon by the service provider and the Singapore technical point of contact.

(9). A copy of all condition reports, certification paperwork and inspection forms to the Norfolk and Singapore technical points of contact, listed below.

9. Qualifications: The selected service provider/contractor must meet the following qualifications.

a. All management and technical personnel performing above listed services must be able to demonstrate the following:

- Experience performing safety certifications on shipboard-approved MHE in accordance with the requirements set forth in the NAVSEA SW023-AH-WHM-010, NAVSUP PUB 538, and equipment technical manuals.

- Experience interpreting, trouble-shooting, and resetting HYSTER on-board dash displays.

- Access to HYSTER proprietary hardware and software required to reset on-board MHE electronics.

b. Contractor personnel performing repairs and maintenance onboard MSC vessels or activities shall abide by all DOD, Navy, MSC security requirements and clearance procedures required to access U.S. Government facilities and/or MSC vessels.

c. The contractor must be able to perform the required services within the period of performance (POP) identified in the RFQ/Statement of Work document. If additional work is identified, and approved by the Government, the Contractor must have the ability to complete the additional work by the close of the period of performance as well.

10. MSC NORFOLK / SSU SINGAPORE - Technical Points of Contact (POCs):

- PRIMARY POC:
Russell Byrnes

Military Sealift Command (N44-MHE) 9276 Third Ave, Bldg. LP-26 Norfolk, VA 23511 Office: (757) 341-2309 Email: russell.byrnes.ctr@navy.mil

- ALTERNATE POC:

Robert M. Hall Office: (757) 443-2482 Email: Robert.m.hall1.ctr@navy.mil

- SINGAPORE POC:

Gary Bouchard MSC - Ship Support Unit Singapore Office: +65 6750 2564 Mobile (New#): +65 9645 0659

DSN 315-421-2564

Email: Gary.Bouchard@fe.navy.mil

11. Shipboard – Technical / Points of Contact (POCs):

BIG HORN - Chief Engineer (CHENG):

Anthony P. Kingsbury
Email: anthony.p.kingsbury.civ@bighorn.navy.mil
(and/or) cheng@bighorn.navy.mil
Ship phone: 850-549-0220 / 850-549-0221

BIG HORN - Principal Port Engineer (PPE):

Jody Bronaugh
Email: jody.bronaugh@navy.mil
Office/Cell: 757-443-0868 / 757-651-2857

BIG HORN - Supply Officer (SUPPO):

Brent Hammonds
Email: brent.l.hammonds.civ@bighorn.navy.mil

12. RFQ Submittal: In response to the above information and statement of work or work item, the contractor is afforded the opportunity to submit a quote (consistent with applicable contract rates) and total pricing to provide the aforementioned service(s) or materials.

a. Contractor shall ensure their designated representatives can access the specified Government activity, shipyard, and/or vessel prior to submitting a quotation.

b. Quotes shall be provided on company letterhead and reference the applicable RFQ number (provided above).

c. Quotes shall be provided to the following MSC contracting officer (KO), via email:

Jason L. McLaughlin Military Sealift Command Government Contracting Branch, N10 471 "C" Street, Bldg. SP-64 Norfolk, VA 23511 Phone: 757-443-2720 E-mail: jason.mclaughlin2@navy.mil

File details come from the government source that posted it. Updated .