J-2_Category_A_Items.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USNS GRUMMAN FY19 ROH DD SYNOPSIS Federal contract opportunity
- Solicitation number
- N3220519R4011
About this file
N3220519R4011 J-2 Attachment
View the file
Other files for this federal contract opportunity
Show all 50
USNS GRUMMAN FY19 ROH DD SYNOPSIS has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 106 | 06 FAN ROOM STEEL REPLACEMENT | |||||||||||
| 108 | OVERHAUL TANK VENT VALVES | |||||||||||
| 109 | STABILITY TEST T-AO-CLASS | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | EXHAUST RESILIENT MOUNT REPLACEMENT | |||||||||||
| 202 | PORT MAIN ENGINE 24K OVERHAUL | |||||||||||
| 203 | PORT MAIN ENGINE NEW COUPLING INSTALLATION | |||||||||||
| 204 | STBD MAIN ENGINE CLUTCH AND COUPLING OVERHAUL | |||||||||||
| 205 | REDUCTION GEAR INSPECTION | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | VARIOUS MOTOR OVERHAULS | |||||||||||
| 303 | SPARE BREAKER OVERHAULS | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | ANNUAL, GMDSS RECERTIFICATION | |||||||||||
| 402 | NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE | |||||||||||
| 403 | MAGNETIC COMPASS INSPECTION AND ALIGNMENT | |||||||||||
| 404 | RADAR/ECDIS PREVENTATIVE MAINTENANCE | |||||||||||
| 405 | ANNUAL SVDR RECERTIFICATION | |||||||||||
| 408 | DOPPLER SPEED LOG PREVENTATIVE MAINTENANCE | |||||||||||
| 409 | FATHOMETER DUAL TRANSDUCER PREVENTATIVE MAINTENANCE | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | NO.4 SSDG 60K OVERHAUL | |||||||||||
| 502 | MISC PUMP OVERHAULS | |||||||||||
| 503 | CONSTANT TENSION WINCH #3 OVERHAUL | |||||||||||
| 504 | CONSTANT TENSION WINCH #4 OVERHAUL | |||||||||||
| 505 | #1 BOILER SERVICE(ABS) | |||||||||||
| 506 | #2 BOILER SERVICE(ABS) | |||||||||||
| 507 | OVERHAUL #1,2 CENTRAL FRESH WATER COOLERS | |||||||||||
| 508 | OVERHAUL #1,2 JACKET WATER COOLERS | |||||||||||
| 509 | INCINERATOR ANNUAL SERVICE(ABS) | |||||||||||
| 510 | PACKAGE A/C INSTALL(T-ALT) | |||||||||||
| 511 | MISC STEEL REPAIRS | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | ANNUAL, LIFEBOAT DAVIT INSPECTION | |||||||||||
| 602 | ANNUAL, LIFEBOAT INSPECTION | |||||||||||
| 603 | PORT RESCUE BOAT DAVIT ANNUAL SERVICE | |||||||||||
| 604 | ANNUAL STBD RHIB DAVIT AND WINCH INSPECTION | |||||||||||
| 605 | ANNUAL RHIB INSPECTION, SERVICE AND REPAIR | |||||||||||
| 606 | ANNUAL SCBA COMPRESSOR SERVICE | |||||||||||
| 607 | SCBA EQUIPMENT ANNUAL SERVICING | |||||||||||
| 608 | ANNUAL OVERHAUL OF FIREFIGHTING EQUIPMENT | |||||||||||
| 609 | ANNUAL INSPECTION OF FIRE AND AFFF HOSES | |||||||||||
| 610 | ANNUAL ACCOMMODATION LADDERS | |||||||||||
| 611 | ANNUAL LIFE RAFT RECERTIFICATION | |||||||||||
| 612 | SHIP’S PERSONNEL ELEVATOR, RECERTIFY | |||||||||||
| 614 | ANNUAL IMMERSION SUIT SERVICE | |||||||||||
| 615 | THERMOSTATIC SWITCH REACTION TIME TEST | |||||||||||
| 616 | FIRE AND SMOKE DAMPER SERVICE | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | LAUNDRY EXHAUST SYSTEM CLEANING | |||||||||||
| 802 | GALLEY VENT CLEANING | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | DRY-DOCKING AND UNDOCKING THE VESSEL | |||||||||||
| 902 | BILGE KEEL INSPECTION | |||||||||||
| 903 | PROPELLER SHAFT WEAR DOWN GAUGE | |||||||||||
| 904 | PROPELLER SYSTEM MAINTENANCE | |||||||||||
| 905 | UNDERWATER HULL PRESERVATION | |||||||||||
| 906 | STERN TUBE SEAL REPLACEMENT | |||||||||||
| 907 | FREEBOARD PRESERVATION | |||||||||||
| 908 | RUBBER AND STERN EXAMINATION | |||||||||||
| 909 | ANCHOR CHAIN, HAUS PIPE, AND LOCKER | |||||||||||
| 910 | CATHODIC PROTECTION SYSTEM MAINTENANCE | |||||||||||
| 911 | SPUR LINE AND NUT CUTTER REPLACEMENT | |||||||||||
| 912 | OVERHAUL SEA VALVES | |||||||||||
| 913 | MARINE GROWTH INHIBTOR ANODE REPLACEMENT | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | SLIDING BLOCK MOTOR REPLACEMENT | |||||||||||
| 1002 | SPANWIRE ASD REFURBISHMENT | |||||||||||
| 1003 | HAULING WINCH TENSION TOWER ASSEMBLY REFURBISHMENT | |||||||||||
| 1004 | ASD FAN MOTOR OVERHAUL | |||||||||||
| 1005 | SLIDING BLOCK EMERGENCY SWITCH CABLE REPAIRS | |||||||||||
| 1006 | WINCH BAND BRAKE REPLACEMENT STA. 3 | |||||||||||
| 1007 | UNREP KICK PIPE, STUFFING TUBES | |||||||||||
| 1008 | WINCH HEAT EXCHANGER SHROUD AND SUPPORT BRACKETS | |||||||||||
| 1009 | RAM TENSIONER SIGHT GLASS DRAIN VALVE REPLACEMENT | |||||||||||
| 1010 | WINCH CONTROL BOOTH WINDOW REPLACMENT | |||||||||||
| 1011 | SADDLE WINCH FOUNDATION REFURBISHMENT | |||||||||||
| 1012 | AUTOMATIC RAM CONTROL BRACKETS | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS LEROY GRUMMAN (T-AO 195) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220519R4011 |
ATTACHMENT J-2
File details come from the government source that posted it.