MSC requires services to perform 6000hr maintenance on 2 SSDGs. Federal contract opportunity
Solicitation number
N3220519Q6876
Issued by
Department of the Navy Military Sealift Command

About this file

SOW SSDG 6000HR MAINTENANCE

View the file

Other files for this federal contract opportunity

Other files attached to MSC requires services to perform 6000hr maintenance on 2 SSDGs., newest first.
File Type Posted
COMBINED_SYNOPSIS_SOLICITATION__(Ver_2.0_01_July_2018)_19Q6876.docx DOCX document
Redacted_EPF_JA_FMSNA_SSDG_IDIQ_N00L_SIG_9.19_(002)_-_Copy.pdf PDF
TAX_LIABILITY_FORM.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS BRUNSWICK

(EPF 6)

MACHINERY, AUXILIARY

06 June 2019
ITEM NO. SO-19-003CATEGORY “A”MSC/WR

PERFORM SSDG 6000 HR SERVICE

1.0 ABSTRACT

1.1 This item describes technical services to perform the 6000hr maintenance service on the #3 and #4 SSDGs.

2.0 REFERENCES:

2.1 SSDG Tech. Manual

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Locations:

3.1.1 Generator Room 1

3.1.2 Generator Room 2

3.2 Quantity:

3.2.1 2 Total (1 in each location)

4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None

5.0 NOTES:

5.1 Contact James Phillips (primary) 757-443-2924 or Johnathan Overton (secondary) 757-443-5803, for details and requirements concerning access to an MSC vessel.

5.2 Contractor is required to submit personnel on the EPIC spreadsheet. To gain access to MSC vessel's on the East Coast, contractors must submit an EPIC request to MSFSC(underscore)EPIC(underscore)EAST(at)navy(dot)mil MSFSC_EPIC_EAST@navy.mil.

5.3 Contractors, shall allow 3 business days (5 for NASSCO, OCONUS, & Earl NJ) for processing of all requests. EPIC will take up to 48 hrs to process, the request must be approved by EPIC before access can be sent to the facility for approval, access will not be guaranteed without approval from EPIC.

5.4 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 26, 28 and 29.

5.5 The Contractor shall be an authorized Fincantieri Marine Systems North America, experienced with IFV1312C2ME-HPCR engines and the JHSV Class.

5.6 The contractor shall not operate ship’s equipment without a vessel representative present.

5.7 The contractor shall follow the MSC Lock Out Tag Out Procedure administered by the vessel’s Chief Engineer.

5.8 Performance Period:

5.8.1 Oct MTA, 21Oct – 1Dec 2019

5.8.2 21 working days in the timeframe of the MTA.

5.8.3 SSDG schedule to be coordinated with Shipyard

5.9 Location of Work:

5.9.1 Far East AOR, TBD.

5.10 Port Engineer:

5.10.1 William Rivero

Cell: 757-803-4612 Email: william.rivero@navy.mil

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 The contractor is responsible for cleaning areas affected and disturbed by the maintenance performed.

6.2 The contractor shall perform all system pre-checks and operational completion checks with vessel crew present.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide the service of Authorized Fincantieri OEM Representation to perform the listed work items related to 6000 Hour Maintenance for two (2) SSDG’s (#3 & #4). Contractor shall furnish labor, tools and materials except where specified. Contractor shall perform all work to OEM specifications.

7.2 Furnish all required tools and test equipment.

7.3 Reassemble all removed parts using contractor furnished gaskets and sealants.

7.4 Replace Jacket Water Pumps for #1&2 SSDG that was not accomplished during 6000hr maintenance.

7.5 Provide three (3ea) Mag Pick-up (MPU) per CFR J619003-006.

7.6 Provide two (2ea) Oil Heaters and two (2ea) gaskets per CFR J619003-007.

7.7 Provide all labor and material to clean all four SSDG generators IAW reference 2.1.

7.8 Perform operational tests on all machinery in the presence of MSCREP and ABS.

7.9 Demonstrate to the Chief Engineer the use of the “SSDG Over-Speed Testing Tool”.

7.10 Submit condition report detailing recommended repairs and final as-released condition report detailing all work performed.

7.11 Contractor shall furnish documentation of all work completed with time sheets signed by Chief Engineer. This item shall include 1 hard copy to Chief Engineer and 1 Electronic copy in .PDF or .XLS to Port Engineer and Chief Engineer.

7.12 OEM Rep shall travel to ship location for the performance period specified.

7.13 Manufacturer’s Representative:

Simone Scaffetti Technical Manager Fincantieri Marine Systems North America, Inc. 800-C Principal Court Chesapeake, VA 23320 Phone: (757) 548-6000 ext. 133 Cell: (757) 289-7269 Fax: 757) 540-6012

8.0 GENERAL REQUIREMENTS: None additional.

SO-19-003 - 3