Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SYNSOL_REV1.docx | DOCX document | |
| SYNSOL.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS BIG HORN
( T-AO 198 )
AUXILIARY MACHINERY
| CATEGORY "A" |
| 6/25/19 |
| SERVICE ORDER |
| MSC/N75/JDB |
1.0 ABSTRACT:
1.1 Provide the services of OEM EMS MARCON technical representative to groom, upgrade and test the Cargo Control Console.
2.0 REFERENCES/ENCLOSURES:
2.1 References:
2.1.1 NAVSEA Drawing 573-2071456, “Wiring Diagram Cargo Control Center”
2.1.2 NAVSEA Drawing 250-4981S100098, “Cargo and Ballast Control System”
2.1.3 COMSCINST 4700.16, “MSC General Technical Requirements (GTR)”
2.1.4 2019 Service Report, Dated 2/17/19
2.2 Enclosures:
2.2.1 Cargo Console Check List
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Description:
3.1.1 Main Cargo Console (EMS MARCON) 06 level
3.2 Location:
3.2.1 TBD
3.3 Period of Performance:
3.3.1 10 consecutive days within timeframe: February 1, 2020 – March 30, 2020
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
4.1 Government Furnished Equipment: None
4.2 Government Furnished Material: None
4.3 Government Furnished Services: None
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
6.0 QUALITY ASSURANCE REQUIREMENTS:
6.1 All work to be accomplished to the satisfaction of the Chief Engineer and the Port Engineer.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Provide an EMS Marcon Technical Representative (OEM) to groom, upgrade, and test the system Cargo Control System, using 2.1.1 as guidance.
7.1.1 Perform checks as per enclosure 2.2.1 and submit results to the MSCREP at completion.
7.1.2 Provide and install newest approved version of the Primary, Secondary, and GR Node computers. Service report from 2019 MTA (2/10/19-2/17/19) refers.
7.1.3 Provide and install latest update to all associated software. Service report from 2019 MTA (2/10/19-2/17/19) refers.
7.2 Upon completion of repairs, the Tech Rep shall complete all required testing for cargo console to verify console and system are operating correctly in the presence of MSCREP.
7.3 Original Equipment Manufacturer Representative:
POC: Eileen Prisk Electronic Marine Systems Inc.
800 Ferndale Place Rahway, NJ 07065
(732) 382-4344 eileenp@emsmarcon.net
8.0 GENERAL REQUIREMENTS:
8.1 None additional.
CARGO CONSOLE CHECK LIST
USNS BIG HORN (T-AO 198)
Inspection on Console, Radar Gauging Cabinet, and all RTU's
Console
| Initial | ||
| 1. All terminals wiring are tight | [ ] |
2. All trough covers installed [ ]
| 3. Record CPU processor | [ ] | ||
| Primary: | Secondary: | GR Node: |
4. Circuit breakers labeled and closed where required [ ]
5. Check retaining bars on master cards. [ ]
6. Clean [ ]
| 7. Check firmware version on all IOC Modules ___________ | [ ] | ||
| Slave 1_______ | Slave 2 _______ | Slave 3 __________ | |
| Slave 4_______ | Slave 5 _______ | Slave 6 __________ |
8. Make sure all terminal blocks are numbered [ ]
9. Resistors installed on main MOD buss input terminals [ ]
10. Resistors installed on the A buss [ ]
11. Control disabled operation verified in alarm history. [ ]
12. Battery test: Power supply turned off [ ] Voltage level ______VDC after 1min Voltage level ______VDC after 3min Voltage level ______VDC after 5mins
13. On deck horn and strobe test [ ]
14. Local horn test [ ]
15. ACK/SCAN buttons on independent overfill system [ ]
16. Check overfill and high level on independent overfill system [ ]
17. Control disable test in alarm history [ ]
18. Lamp dimmer TEST [ ]
19. Console buzzer/horn TEST [ ]
Enclosure 2.2.1
CARGO CONSOLE CHECK LIST
20. Console ACK Button TEST [ ]
21. Trim & Heel TEST [ ]
22. EMS VT TEST verify by activating and email received to EMS [ ]
23. Port cargo spill level active test [ ]
24. Stbd cargo spill level active test [ ]
25. All meters dim [ ]
26. Emergency pump shutdown [ ]
27. Bilge summary alarm to bridge [ ]
28. Bilge alarms to engine room [ ]
29. Test all meters with process meter [ ]
30. Tank Mgr. Version Primary__________ Secondary ___________ [ ]
Radar Cabinet
1. All terminals with wiring are tight [ ]
2. All trough covers installed [ ]
3. Remove any debris [ ]
4. Circuit breakers labeled and values correct. [ ]
5. Clean [ ]
6. Battery test: Power supply turned off [ ] Voltage level ______VDC after 1min Voltage level ______VDC after 3mins Voltage level ______VDC after 5mins
7. UPS Power Failover Test. 100% battery power for 5mins [ ]
8. ISB Power Test [ ]
| 9. Stem Module Version | [ ] | ||
| Stem A ____ | Stem B ____ | Stem C ____ |
Enclosure 2.2.1
CARGO CONSOLE CHECK LIST
All RTUs RTU____ Buss____
1. All terminals with wiring are tight [ ]
2. All trough covers installed [ ]
3. Remove any debris [ ]
4. Circuit Breakers Labeled and values correct. [ ]
5. Check retaining bars on master cards. [ ]
6. Clean [ ]
| 7. Check firmware version on all IOC Modules RTU __________ | [ ] | ||
| Slave 1_______ | Slave 2 _______ | Slave 3 __________ | |
| Slave 4_______ | Slave 5 _______ | Slave 6 __________ |
8. Make sure all terminal blocks are numbered [ ]
9. Resistors installed on main MOD buss input terminals [ ]
10. Resistors installed on Display MOD buss input terminals [ ]
11. Control Disable operation verified to relay terminals. [ ]
12. Battery test: Power supply turned off RTU_____ [ ] Voltage level ______VDC after 1min Voltage level ______VDC after 3mins Voltage level ______VDC after 5mins
Enclosure 2.2.1