Signed_SSJ.pdf

PDF 369 KB Posted

Attached to
EMS Rep Federal contract opportunity
Solicitation number
N3220519Q4645
Issued by
Department of the Navy Military Sealift Command

About this file

SSJ 4645

View the file

Other files for this federal contract opportunity

Other files attached to EMS Rep, newest first.
File Type Posted
N3220519Q4645.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 July 2018)

Date: 8/30/2018

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): ____USNS BIG HORN___N2162182424001______________________

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) the name of the required source or brand name

__Upgrade the Cargo Control Console_______________________________________________

b) the required delivery date/period of performance and

_____01/01/2019 – 02/12/2019_______________________________________________________

c) its intended use.

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

POC: Eileen Prisk Electronic Marine Systems Inc.

800 Ferndale Place Rahway, NJ 07065

(732) 382-4344 eileenp@emsmarcon.net

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. _____ Only one responsible source (select all that apply):

1. _XXX_ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

2 Ver 2.0 (01 July 2018)

The cargo console OEM, Electronic Marine System, is for the T-AO Class ships.

Electronic Marine System (EMS) is the only OEM authorized supplier of parts for parts, service and technical data / drawings from the original manufacturer as required by USCG and ABS regulations.

This maintains all OEM warranties, ensures engine reliability, and crew safety

b. If drawings are included, who is identified as “owning” the drawings.

EMS_____________________________________________________________

2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. _XXX_ OTHER REASON:

a. _XXX_ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: ___10.6-002-ALL lists Cargo Console as critical equipment_____

b. _____ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): ___________________

ii. Identify other vessels with this Make / Model:

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

3 Ver 2.0 (01 July 2018)

ii. Describe how the equipment must be compatible with the existing configuration.

d. _XXX_ OTHER:

MSC does not have manufacturing and technical information required to evaluate and determine whether non-OEM components and replacement parts offered are equivalent to the OEM components and replacement parts. T-AO Cargo consoles require special software, specialized repair parts, and technical expertise unique to these cargo consoles; only approved OEM parts are authorized to be installed on this highly sophisticated equipment. The OEM has access to provide parts and technical data / drawings from the original manufacturer, as required to properly repair and maintain the equipment. All OEM repair parts are in compliance with USCG and ABS IMO regulatory requirements.

4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: ______________________________

b. Required delivery date / Period of Performance: _____________________________

c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.

d. Estimated production lead time: ______________________________

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number: _________________________________________

4 Ver 2.0 (01 July 2018)

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: ___ _______

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Requester Signature / Date

Level Higher (Suppo / SPE / ASPE) / Date

Contract Specialist / Date

Contracting Officer / Date

File details come from the government source that posted it.