  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Burlington

( EPF 10 )

COMMUNICATION AND NAVIGATION
CONTRACT NO. 19-009
ITEM NO. 19-009
CATEGORY "A"
2019-01-08

NAV-SOLAS-VDR FCT Support

1.0 ABSTRACT

1.1 This item describes technical services for Navigation, SOLAS, and Voyage Data Recorder systems in support of FCT Mock and Final Contract Trials (FCTs).

2.0 REFERENCES:

2.1 AV-5 Moriah In-Port Demonstration

2.2 AV-5A Moriah Underway Demonstration

2.3 NV-1 Navigation Equipment Demonstration

2.4 NV-2 Autopilot Demonstration

2.5 NV-3 Speed Log Demonstration

2.6 NV-4 Misc Navigation Equipment Demonstration

2.7 NV-5 Radar Demonstration

2.8 NV-8 Navigation Control Demonstration

2.9 NV-9 Gyro Demonstration

2.10 NV-10 Navigation, Signal & Search Lights Demonstration

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Locations:

3.1.1 Wheel House

3.1.2 Various

3.2 Quantity:

3.2.1 Various

4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: NONE

5.0 NOTES:

5.1 Performance Period:

5.1.1 17 - 21 June 2019, FCT walk through

5.1.2 08 - 12 July 2019, FCT Mock Trial

5.1.3 28 July - 02 August 2019, FCT Test with INSURV

5.2 Location of Work:

5.2.1 JEB-Little Creek, Virginia Beach, VA. 23459

Pier: TBD

5.3 Port Engineer:

5.3.1 Jonathan Twiford P.E.

Cell:

757-756-6362 Email:

jonathan.twiford1@navy.mil

5.4 Contact the Port Engineer for details and requirements concerning access to an MSC vessel.

5.5 Contractor is required to submit personnel on the EPIC spreadsheet. To gain access to MSC vessel's on the East Coast, contractors must submit an EPIC request to MSFSC(underscore)EPIC(underscore)EAST(at)navy(dot)mil MSFSC_EPIC_EAST@navy.mil.

5.6 Contractors, shall allow 3 business days (5 for NASSCO, OCONUS, & Earl NJ) for processing of all requests. EPIC will take up to 48 hrs to process, the request must be approved by EPIC before access can be sent to the facility for approval, access will not be guaranteed without approval from EPIC.

5.7 Contractor is responsible to gain access to JEBLC Base and Pier 11.

6.0 QUALITY ASSURANCE REQUIREMENTS: NONE

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide the service of one (1) Northrop Grumman OEM rep for the performance period stated in 5.1 to perform Reference 2.0. The OEM shall be a Sr. Service Tech Rep Experienced with ABS High Speed Craft Navigational Aids Acceptance Trial requirements and the JHSV Class. All work shall be performed by an authorized Service Representative. OEM to be onboard by 0800.

7.2 Equipment that shall be inspected, operational condition tested and presented to INSURV inspectors shall include items include, but may not be limited to Item 2 References and below:

7.2.1 NAVIGATION SYSTEM

7.2.1.1 Voyage Management System, ECDIS-C

7.2.1.2 Radar ARPA Display and System

7.2.1.3 AIS System

7.2.1.4 Moriah Wind System

7.2.1.5 Speed, Depth, Heading, GPS Systems

7.2.2 SOLAS EQUIPMENT

7.2.2.1 GMDSS Equipment including backup battery

7.2.2.2 EPIRBS (2 EA) & Lanyards

7.2.2.3 SARTS

7.2.2.4 IAD

7.2.2.5 MF/HF radiotelephone and TELEX

7.2.2.6 VHF

7.2.2.7 NAVTEX

7.2.2.8 SARTS (2 EA)

7.2.3 VOYAGE DATA RECORDER SYSTEM

7.2.3.1 Sensor Interface Unit

7.2.3.2 Bridge Alarm Unit

7.2.3.3 Protected Data Capsule

7.2.3.4 DAU

7.2.3.5 Microphones

7.3 Service Representative shall be onboard for three (3) days during FCT Mock. Two (2) days when the ship is pier side and one (1) day underway with the ship from 0600 to 1800. The ship will return to the same port at JEBLC and same day.

7.4 Service Representative shall be onboard for three (3) days during FCT Test. Two (2) days when the ship is pier side and one (1) day underway with the ship from 0600 to 1800. The ship will return to the same port at JEBLC and same day.

7.5 OEM shall provide support for the ship’s crew during pre underway and underway testing for Final Contract Trials (FCT). Support will include oversight and testing of equipment required to demonstrate to MOCK and NAVY INSURV Board safe operation of equipment in accordance with references in paragraph 2.0.

7.6 OEM will help expedite any emergent material needs to support scheduled underway operations.

7.7 OEM will provide other necessary services related to operation and troubleshooting during Final Contract Trials (FCT).

7.8 Contractor shall use References 2.0 and 7.2 as guidance.

7.9 Contractor shall furnish tools and test equipment to satisfactorily present ship’s equipment listed in paragraph 7.2.

8.0 GENERAL REQUIREMENTS: NONE