T-AKE_Class__SOW_Crane_for_Live_Loads.docx
DOCX document 16 KB Posted
- Attached to
- Live Load Crane Modification Federal contract opportunity
- Solicitation number
- N32205-16-T-7234
About this file
Statement of work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RE_SSJ_T-AKE_CLASS_BUY_CRANE_MODS.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-AKE CLASS SERVICE ORDER
29 NOVEMBER 2015
SERVICE ORDER 16-012 CATEGORY "A" MSC/JSH
CRANE MODIFICATIONS FOR LIVE LOADS
1.0 ABSTRACT
1.1 This item describes the requirement to accomplish engineering work to develop and submit a proposal detailing modifications required to allow for T-AKE cranes to handle live loads.
2.0 REFERENCE: None.
3.0 ITEM LOCATION/DESCRIPTION
3.1 Contractor's facility.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.
5.0 NOTES: None additional.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED
7.1 Accomplish engineering work to support the modification of T-AKE cranes to allow for handling of live loads.
7.2 Submit a proposal detailing modifications required to allow T-AKE cranes to handle live loads. Proposal is to include a rough order of magnitude (ROM) estimate that provides an estimate for shipyard and Appleton technical representative labor and material, lead time for material, and time (calendar days) required to accomplish the modification during a repair period.
7.3 The proposal is to include details on required modifications and installations, including, but not limited to, details on replacement of existing winch with dual brake winch, details on required programmable logic controller modifications, certification documentation from the crane block manufacturer stating the block is suitable to handle personnel, details on required replacement or modification of luff cylinders to allow emergency load release.
7.4 Estimate is also to include details of testing requirements to prove modifications.
7.5 Obtain ABS approval for modifications. Provide electronic copy and one paper copy of ABS approval documentation to MSC.
7.6 Preparation of Drawings: None additional.
7.7 Manufacturer's Representative: None additional.
8.0 GENERAL REQUIREMENTS: None additional.