T-1380_CHAIN_SPECIFICATIONS.docx

DOCX document 15 KB Posted

Attached to
SLIDING BLOCK CHAIN ASSY Federal contract opportunity
Solicitation number
N32205-15-T-1380
Issued by
Department of the Navy Military Sealift Command

About this file

MANDATORY CHAIN SPECIFICATIONS

View the file

Other files for this federal contract opportunity

Other files attached to SLIDING BLOCK CHAIN ASSY, newest first.
File Type Posted
T-1380_SLIDING_BLOCK_ROLLER_CHAIN_SPEC.docx DOCX document
T-1380_PART_LISTING-SUPPLY.docx DOCX document
MEMO_OF_STANDARD_PROCEDURES.docx DOCX document
T-1380_PART_LISTING.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 ABSTRACT

1.1. Provide 300 feet of Double Strand Chain for replacement of Chains on UNREP Stations on USNS WALTER S. DIEHL.

2.0 REFERENCES/ENCLOSURES:

2.1. References:

2.1.1. NAVSEA Drawing 5363392 Rev D Double Strand Chain

2.2. Enclosures:

2.2.1. Procedure for Hot Dipping Sliding Block Drive Chain

2.2.2. Shipping Box Guidance Information

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location/Quantity:

3.1.1. Location:

3.1.2. Quantity: 300 Hundred (300) Feet of Double Strand Chain P/N: 5363392 5 each Connecting Links P/N: 160-2 C/L

3.2. Item Description/Manufacturer's Data: None Additional

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Arrangement/Outfitting:

7.1.1. Contractor shall provide required chain manufactured per reference 2.1, chain shall be modified by accomplishing procedures in enclosure 2.2.1. Enclosure 2.2.1 provides amplifying information for General Note 4 of reference 2.1.

7.1.2. Failure to comply with this specification may result in rejection of supplied materials in lieu of rejection contractor may be held responsible for cost of onsite corrective action if supplied materials do not comply with this specification.

7.2. Structural: None

7.3. Mechanical/Fluids: None

7.4. Electrical: None

7.5. Electronics: None

7.6. Preparation of Drawings/Documentation: None

7.7. Inspection/Test:

7.7.1. Contractor shall submit written documentation of compliance with reference 2.1 and enclosure 2.2.1.

7.7.2. (Checkpoint) Contractor shall provide government with 72 hour notice prior to coating chains and allow access for government representative for the purposes of witnessing coating of chains per requirement.

7.8. Painting: None

7.9. Marking:

7.9.1. Upon completion of work fabricate shipping containers for chain using Encl 2.2.2 as guidance. Stencil container and arrange for delivery of material to government per contract.

7.10. Manufacturer’s Representative: None

GENERAL REQUIREMENTS: None additional

File details come from the government source that posted it. Updated .