T-1380_CHAIN_SPECIFICATIONS.docx
DOCX document 15 KB Posted
- Attached to
- SLIDING BLOCK CHAIN ASSY Federal contract opportunity
- Solicitation number
- N32205-15-T-1380
About this file
MANDATORY CHAIN SPECIFICATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| T-1380_SLIDING_BLOCK_ROLLER_CHAIN_SPEC.docx | DOCX document | |
| T-1380_PART_LISTING-SUPPLY.docx | DOCX document | |
| MEMO_OF_STANDARD_PROCEDURES.docx | DOCX document | |
| T-1380_PART_LISTING.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 ABSTRACT
1.1. Provide 300 feet of Double Strand Chain for replacement of Chains on UNREP Stations on USNS WALTER S. DIEHL.
2.0 REFERENCES/ENCLOSURES:
2.1. References:
2.1.1. NAVSEA Drawing 5363392 Rev D Double Strand Chain
2.2. Enclosures:
2.2.1. Procedure for Hot Dipping Sliding Block Drive Chain
2.2.2. Shipping Box Guidance Information
3.0 ITEM LOCATION/DESCRIPTION:
3.1. Location/Quantity:
3.1.1. Location:
3.1.2. Quantity: 300 Hundred (300) Feet of Double Strand Chain P/N: 5363392 5 each Connecting Links P/N: 160-2 C/L
3.2. Item Description/Manufacturer's Data: None Additional
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1. Arrangement/Outfitting:
7.1.1. Contractor shall provide required chain manufactured per reference 2.1, chain shall be modified by accomplishing procedures in enclosure 2.2.1. Enclosure 2.2.1 provides amplifying information for General Note 4 of reference 2.1.
7.1.2. Failure to comply with this specification may result in rejection of supplied materials in lieu of rejection contractor may be held responsible for cost of onsite corrective action if supplied materials do not comply with this specification.
7.2. Structural: None
7.3. Mechanical/Fluids: None
7.4. Electrical: None
7.5. Electronics: None
7.6. Preparation of Drawings/Documentation: None
7.7. Inspection/Test:
7.7.1. Contractor shall submit written documentation of compliance with reference 2.1 and enclosure 2.2.1.
7.7.2. (Checkpoint) Contractor shall provide government with 72 hour notice prior to coating chains and allow access for government representative for the purposes of witnessing coating of chains per requirement.
7.8. Painting: None
7.9. Marking:
7.9.1. Upon completion of work fabricate shipping containers for chain using Encl 2.2.2 as guidance. Stencil container and arrange for delivery of material to government per contract.
7.10. Manufacturer’s Representative: None
GENERAL REQUIREMENTS: None additional
File details come from the government source that posted it. Updated .