N290023216A177 SSJ - Redacted.pdf

PDF 237 KB Posted

Attached to
USNS MEDGAR EVERS Butterfly Wafer Valve Federal contract opportunity
Solicitation number
N3220523Q2322
Issued by
Department of the Navy Military Sealift Command

About this file

This memorandum documents a justification for using other than full and open competition to acquire a butterfly wafer valve from a sole source provider. The document identifies the need to replace a failed butterfly valve on the USNS MEDGAR EVERS to comply with USCG and SMS requirements. Only Crane Valve Services Division of Crane Co can provide the proprietary replacement valve, model 10KG577315, to ensure standardization across the T-AKE class ships. The required delivery date is October 4, 2023 to address the urgent need created by the failed valve. The Military Sealift Command lacks the manufacturing and technical data to evaluate non-OEM replacement parts as equivalents.

View the file

Other files for this federal contract opportunity

Other files attached to USNS MEDGAR EVERS Butterfly Wafer Valve, newest first.
File Type Posted
N3220523Q2322_Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 July 2018)

Date: 22 AUG 2023

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) USNS MEDGAR EVERS (T-AKE 13) PR Number(s): N290023216A177

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

VALVE, BTFL, LUG 10.00IPS 285PSI W/OPR & HNDWL P/N 10KG577315 QTY:2

a) the name of the required source or brand name

CRANE VALVE SERVICES DIV OF CRANE CO

b) the required delivery date/period of performance and

RDD 04 OCT 2023

c) its intended use.

TO REPLACE EXISTING VALVE, BTFL, LUG 10.00IPS 285PSI W/OPR & HNDWL

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

VALVE AUTOMATION AND CONTROLS

CRANE VALVE SERVICES DIV OF CRANE CO

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. Only one responsible source (select all that apply):

1. X RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

2 Ver 2.0 (01 July 2018)

VALVE AUTOMATION AND CONTROLS OWNS PROPRIETARY RIGHTS TO THE

DRAWINGS OF THE MATERIAL.

b. If drawings are included, who is identified as “owning” the drawings.

VALVE AUTOMATION AND CONTROLS

2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part

B – Brand Name.)

3. X OTHER REASON:

a. X CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: 10.6-002-01-AKE

b. X STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): VALVE AUTOMATION AND

CONTROLS / MFR ID-10KG577315

ii. Identify other vessels with this Make / Model: T-AKE 1-13

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

3 Ver 2.0 (01 July 2018)

d. X OTHER:

MSC DOES NOT HAVE MANUFACTURING AND TECHNICAL

INFORMATION REQUIRED TO EVALUATE AND DETERMINE WHETHER

NON-OEM SERVICE AND REPLACEMENT PARTS OFFERED ARE

EQUIVALENT TO THE OEM COMPONENTS AND REPLACEMENT PARTS.

4. X UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: 04 AUG 2023

b. Required delivery date / Period of Performance: 04 OCT 2023

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

DELAYED DUE TO TECHNICAL RESEARCH

d. Estimated production lead time: ______________________________

e. Explanation of why delivery / commencement of services by the date required is needed:

(explain the impact to the mission, any special circumstances or conditions, etc.) _The new butterfly valve is needed in order to replace the failed valve in the Pumproom. The current valve has failed in order to be compliant with USCG and SMS requirements the valve needs to be replaced.

f. CASREP Number: _________________________________________

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT

4 Ver 2.0 (01 July 2018)

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

File details come from the government source that posted it. Updated .