N0042120Q00940002 Amendment.pdf
PDF 172 KB Posted
- Attached to
- Enhanced Depot Level Test Set Federal contract opportunity
- Solicitation number
- N0042120Q0094
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0042120Q0094 Solicitation.pdf | ||
| N0042120Q00940001 Amendment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to include Statement of Work.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042120Q0094
X 9B. DATED (SEE ITEM 11)
23-Jan-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jan-2020
CODE
NAVAL AIR WARFARE CENTER AD
CODE 2.5.1.3, BLDG 433, 47060 LILJENCRAN
TZ ROAD
PATUXENT RIVER MD 20670
N00421 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:301-757-5263TEL:
TBD /
N0042120Q0094
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
STATMENT OF WORK
Statement of Work for Production of Enhanced Depot Level Test Set (EDLTS) for Australia
05 August 2019
1. SCOPE.
This Statement of Work (SOW) sets forth requirements to manufacture one (1) Enhanced Depot Level Test Set (EDLTS) along with associated hardware and software.
2. APPLICABLE DOCUMENTS. The following documents form part of this SOW. Copies of these documents may be obtained from the Government upon request. Contractor shall use current applicable revision.
Government Nomenclature (Common usage nomenclature as used in this SOW)
Drawing(s) Product Function Specification
(PFS)
Acceptance Test Procedure
(ATP)
Enhanced Depot Level Test Set , P/N 3009510-1
FT3009510 Rev – (EDLTS Family Tree)
SJXE13-L0814—0001-4 SJXE13-L0814—0004-5
2.1 Military Standards / Documents.
MIL-STD-130N DoD Standard Practice Identification Marking of U.S. Military Property DODI 8520.2 DoD Information Assurance Program
2.2 Commercial Documents.
ANSI/ASQC Q9000 American National Standard, Quality Systems NAS411 Hazardous Materials Management Program ISO/IEC 16022 Bar Code Markings
2.3 Order of Precedence.
In the event of a conflict between the SOW and the references cited herein, the text of this SOW shall take precedence. Except for dimensional constraints, in the event of a conflict between the drawings and specifications, the specifications shall take precedence. Nothing within this SOW shall supersede applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS. The Contractor shall manufacture and test EDLTS as specified below.
3.1 Manufacturing.
The Contractor shall manufacture one (1) EDLTS along with associated hardware and software in accordance with this SOW, and the documentation and specifications listed in paragraph 2.0 above.
3.2 Acceptance Tests.
Using the Government-approved ATP identified in paragraph 2.0, the Contractor shall subject the EDLTS to the acceptance tests described in the ATP.
3.3 Quality Assurance (QA) Program.
The Contractor shall notify the government of any changes to the configuration previously delivered and ensure those changes are fully documented. Any changes in the hardware shall result in a new part number (dash) allocation for this EDLTS. A part number revision shall include an update to the family tree, the technical data package and the government version of the software drawing, as applicable. If a change is made to hardware and/or software it shall be made available to the government for verification for backwards compatibility.
Any change requirement(s) to the EDLTS Technical Manual will be provided to the government for incorporation into the technical manual.
4. DELIVERABLES.
4.1 Hardware. One (1) EDLTS system, to include interface cables and accessories shall be delivered as directed within the contract. This unit shall be serialized number 0005.
4.2 Software. The Contractor shall deliver software as follows:
All EDLTS operating software files shall be installed on the EDLTS unit.
Deliver two (2) back-up copies on CD-ROM media for EDLTS operating system and associated software files. Per paragraph 3.3, if no changes are made to EDLTS software, the delivery shall include copies of applications and support files; no source files shall be included.
APPENDIX A – List of Acronyms
ATP
CD-ROM
DoD
EDLTS
Acceptance Test Procedures Compact Disc-Read Only Memory Department of Defense Enhanced Depot Level Test Set
PFS
QA
SOW
Product Function Specification Quality Assurance Statement of Work
End of Appendix
End of SOW
(End of Summary of Changes)
File details come from the government source that posted it. Updated .