N0042119Q0404.docx

DOCX document 78 KB Posted

Attached to
EaseWorks Maintenance Federal contract opportunity
Solicitation number
N0042119Q0404
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Easeworks Maintenance Agreement

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0042119Q0404

Section A - Solicitation/Contract Form

POC

U.S Government ~ Tax Exempt

ISSUED BY:

Name: JaNae Williams Phone Number: 301-757-5234 Email: janae.williams@navy.mil

VENDOR CONTACT:

DUNS:

Company POC:

Phone:

Email:

Reference Your Quote:

TECHNICAL POC:

Name:

Email:

WAWF ACCEPTOR:

PAYMENT/INVOICING ISSUES: PLEASE CONTACT COMPTROLLER BELOW.

N64142 NAWCAD

COMPTROLLER

INTERNAL ENTITLEMENTS TEAM BLDG 440 ROOM 25

47122 LILJENCRANTZ ROAD

PATUXENT RIVER, MD 20670-1549

INTERNAL ENTITLEMENTS TEAM 301-342-9586

EMAIL: PAXR_ACCT_INTERNAL_ENTITLEMENTS@NAVY.MIL

WAWF Invoicing Help & Instructions:

Visit the website at https://wawf.eb.mil/ and you can find help via the link "Vendors - Getting Started Help" under the New User section.

EARLY AND PARTIAL SHIPMENTS ARE ACCEPTABLE

VENDOR – IF ELECTRONIC EQUIPMENT, PLEASE MARK BOX/PACKAGE CONTAINING ELECTRONIC EQUIPMENT WITH THE “DO NOT SCAN” STICKER

RECEIVING DOC HOURS ARE MONDAY THROUGH FRIDAY, 0630-1500 EST.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lite

Annual Software Maintenance Renewal

FFP

POP: 23 Sep 2019 - 22 Sep 2020 FOB: Destination

PURCHASE REQUEST NUMBER: 1300794942

ADDITIONAL MARKINGS: Denise Judd, 904-317-5559

PSC CD: 7030

NET AMT

Section C - Descriptions and Specifications

SOW

1. BACKGROUND

The Naval Air Systems Command (NAVAIR) Depot Maintenance System (NDMS) consists of a portfolio of applications that automate the planning, execution, management, and control of maintenance, repair, and overhaul (MRO) processes across the industrial Fleet Readiness Centers (FRCs). In support of the FRCs, NDMS integrates and automates financial, material, production, capacity, time accounting, facility, tool and equipment, hazardous material, environmental, and supply functions. Functionally NDMS is a production system that supports the resources required to perform depot level maintenance, repair, modification of aircraft, engines, components and other aeronautical equipment and to perform manufacturing and prototyping operations.

1.1 SCOPE

The contractor shall provide an Easeworks software maintenance and technical product support agreement in support of NDMS. Easeworks is a web-enabled application which provides automated labor standards generation and maintenance, time studies, and other standards analysis application and maintenance.

1.2 CONTRACT TYPE

The Government anticipates award of a Firm Fixed Price type contract.

1.3 PERIOD OF PERFORMANCE

Base Period: 23 September 2019 through 22 September 2020 Option Year 1: 23 September 2021 through 22 September 2022 Option Year 2: 23 September 2022 through 22 September 2023

1.4 PLACE OF PERFORMANCE

This is a software subscription and no physical access is required by contractor personnel.

1.5 INVOICES

In accordance with DoD Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Request, please submit all invoices using the Wide Area Work Flow (WAWF) online database system. To become a registered user, go to https://wawf.eb.mil. Additionally, training for WAWF, may be obtained by visiting http://wawftraining.com/.

1.6 This support covers the following:

Base Period:

CLIN 0001: Easeworks Software Maintenance Annual Maintenance: Free Upgrades to software as soon as they become available, live support from 8:00am to 5:00pm PST, unlimited support via the Internet and email, unlimited telephone support, Software fixes and updates delivered via the internet and Newsletters delivered via email.

Option Year 1 CLIN1001: Easeworks Software Maintenance Annual Maintenance: Free Upgrades to software as soon as they become available, live support from 8:00am to 5:00pm PST, unlimited support via the Internet and email, unlimited telephone support, Software fixes and updates delivered via the internet and Newsletters delivered via email.

Option Year 2 CLIN2001: Easeworks Software Maintenance Annual Maintenance: Free Upgrades to software as soon as they become available, live support from 8:00am to 5:00pm PST, unlimited support via the Internet and email, unlimited telephone support, Software fixes and updates delivered via the internet and Newsletters delivered via email.

2.0 Applicable Documents:

2.1 Government Furnished Resources

The Government will provide all necessary reference documents not generally available to the Contractor as required. Throughout the life of the contract, if any instruction or document is replaced or superseded, the replacement or superseding instruction or document shall be applicable to the requirements defined in this SOW.

2.2 Contractor Furnished Items and Services

The Contractor shall not purchase any IT equipment on behalf of NAVAIR in support of this Contract, which reports to Program Budget Information System – IT (PBIS- IT), without a NAVAIR Command Information Officer (CIO) approved Navy Information Approval System (NAV-IDAS) Information Technology Procurement Request (ITPR).

2.3 Clinger-Cohen Act:

In 1996, Congress enacted the Clinger-Cohen Act (CCA) requiring agencies to use a disciplined capital planning and investment control process to acquire, use, maintain and dispose of information technology. In accordance with the following Department of Defense Directive (DoDD), Department of Defense Instruction (DoDI), Office of the Secretary of Defense (OSD) memo, and Secretary of the Navy Instruction (SECNAVINST), CCA compliance is required for all programs that contain IT, including National Security Systems (NSS). NSS are defined in National Institute of Standards and Technology (NIST) Special Publication (SP) 800-59. Six factors are used to identify NSS, one of which is IT in weapons and weapons system programs. The law provides authority to the agency’s CIO to manage IT resources effectively and ensure cybersecurity and interoperability. The authority to grant compliance with CCA as a statutory milestone program document resides at either first echelon or second echelon. The level of the Acquisition Category (ACAT) or designation as an Abbreviate Acquisition Program (AAP) determines which echelon has this authority. ACAT III and below acquisition programs CCA compliance assertion confirmation approval authority is delegated to the second echelon Command Information Officers. ACAT I and ACAT II acquisition programs CCA compliance assertion confirmation approval resides at DON CIO (First echelon). Approval of interoperability standards compliance for all acquisition programs resides at DON CIO. Approval of the Cybersecurity Strategy (formerly Acquisition Information Assurance Strategy) is a component of CCA compliance however it is approved separately. Approval authority is divided among the DoD, and DON CIOs as well as the second echelon Command Information Officers. See Table 1 for allocation of approval authorities.

ACAT
Review and

Endorsement by Command Information Officer Approval by as Command Information Officer Review and Endorsement by DASN (C4I&Space) Review and Endorsement by DON CIO Approval by DON CIO Approval by DoD CIO

IC
X

X

X

ID
X
X
X

X1

IAM
X
X
X

X

IAC
X
X
X

X

II
X

X

X

III

X

IV

X

AAP

X

1 See Interim DoD 5000.02 Enclosure 11, Section 6.b.(1): For ACAT ID, IAM, and IAC programs, the DoD CIO will review and approve the Cybersecurity Strategy prior to milestone decisions or contract awards.

Table 1: Allocation of Cybersecurity Strategy Approval Authorities

Cybersecurity Strategy approval process begins after the Program Manager signs the Cybersecurity Strategy and puts it forward to the Command Information Officer. The final approved Cybersecurity Strategy is an appendix to the Program Protection Plan (PPP) as well as an element of CCA compliance (Interim DoDI 50000.02, Tables 2 and 9).

a. Interim DoD Instruction 5000.02, “Operation of the Defense Acquisition System”, November 25, 2013

b. OSD Memo, Clinger-Cohen Act Compliance Policy, Mar 8 2002

c. SECNAVINST 5000.2E, Implementation and Operation of the Defense Acquisition

2.4 System Software / Application Compliance:

All Information Technology Systems or software/application development, modification or support shall be performed in accordance with Defense Business Transformation guidance (formerly Business Management Modernization Program (BMMP)), Department of the Navy (DON)/ NAVAIR Functional Area Manager (FAM) Policies and Guidance, Network and Server Registration, and Web Enablement mandates.

2.5 Web Sites, Web Enablement and Application / System Development, Modification, and Maintenance Support Services:

All Information Technology systems, software, and website development, modification or support shall be performed in accordance with all applicable Federal, DoD, DON, and NAVAIR policy, guidance, standards, and strategies, and should be integrated within the NAVAIR Enterprise portal and collaboration environment whenever possible. Any Web sites/servers hosted/located in contractor facilities, or outside NAVAIR enclave, will transition to NAVAIR architecture and infrastructure in accordance with Legacy Shutdown guidance. Policies include, but are not limited to:

a. Office of Management and Budget Management of Federal Information Resources, OMB CIRCULAR NO. A-130 Revised.

b. OMB Policies for Federal Agency Public Websites, OMB M-05-04 http://www.whitehouse.gov/sites/default/files/omb/memoranda/fy2005/m05-04.pdf

c. Section 508 Amendment to the Rehabilitation Act of 1973 http://www.section508.gov/

d. Department of Defense Web Policies and Guidelines http://www.defense.gov/webmasters

e. Navy Information Operations Command (NIOC) Norfolk Web Risk Assessment Team Website http:www.public.navy.mil/fcc-c10f/nionorfolk/Pages/AboutWRA.aspx

f. DON Policy for Content of Publicly Accessible World Wide Web Sites SECNAVINST 5720.47B www.navy.mil/navydata/internet/secnav5720-47b.pdf

g. NAVAIR CIO Website (NAVAIR specific policy and guidelines) To request this policy contact the NAVAIR CIO office – 7.2.2 Applications Integration team – Web Manager: Shane Malamphy at 301- 342-1825

h. Defense Information Systems Agency (DISA) Hosting of All Navy Websites (NAVADMIN 061/08) http://www.public.navy.mil/bupers‐ npc/reference/messages/Documents/NAVADMINS/NAV2008/NAV08061.txt

i. Consolidation of Navy Web Sites - Reduction of IM/IT Footprint NAVADMIN 145/07 http://www.public.navy.mil/bupers- npc/reference/messages/Documents/NAVADMINS/NAV2007/NAV07145.txt

j. DON Web Presence Policy: The Registration, Compliance of, and Investment in, All Unclassified Web Sites and Uniform Resource Locators http://www.doncio.navy.mil/ContentView.aspx?ID=577

k. Policy and Procedures for Web Risk Assessment (WRA) of Publicly Accessible Navy Sites (ALCOM 129/09) http://www.public.navy.mil/fcc‐c10f/niocnorfolk/Documents/NTD‐08‐ 09.txt

2.6 Software Development/Server Procurement:

Any tools developed that will be hosted by the Navy Marine Corps Intranet (NMCI) or run on NMCI workstations will be certified for NMCI and comply with NMCI policy. Additionally, any servers supporting this effort will be transitioned to meet the requirements of the current NAVAIR Server Consolidation effort.

2.7 Cybersecurity:

NAVAIR’s Cybersecurity Program is a unified approach to protect unclassified, sensitive or classified information, and is established to consolidate and focus efforts in securing that information, including its associated systems and resources. Cybersecurity is required operationally throughout the DON. The DON CIO is responsible for IT within the Navy, as mandated by the Clinger-Cohen Act, and is the lead for departmental compliance with the Federal Information Security Management Act of 2002.

All Cybersecurity shall be in compliance with the following listed instructions:

a. ASD (NII) Directive-Type Memorandum (DTM) 08-027 – Security of Unclassified DoD Information on Non-DoD Information Systems, 31 July 2009

b. Chairman of the Joint Chiefs of Staff Instruction CJCSI 3170.01H (series), Joint Capabilities Integration and Development System, 10 January 2012

c. CJCSI 6211.02D Defense Information System Network (DISN): Policy and Responsibilities, 24 Jan 2012

d. CJCSI 6212.01F Net Ready Key Performance Parameter (NR KPP), 21 March 2012 e. CJCSI 6251.01D Narrowband Satellite Communications Requirements, 30 Nov 2012

f. CJCSI 6510.01F, Information Assurance (IA) and Support to Computer Network Defense (CND), 09 Feb 2011, certified current 10 Oct 2013

g. Chairman of the Joint Chiefs of Staff Manual CJCSM 6510.01B – Incident Handling Program 10 July 2012

h. Chief of Naval Operations/Headquarters, United States Marine Corps CNO N614/HQMC C4 – Navy-Marine Corps Unclassified Trusted Network Protection (UTN- Protect) Policy, Version 1.0, 31 October 2002

i. Defense Acquisition Guidebook – Chapter 7, Acquiring Information Technology, Including National Security Systems, Section 7.5 Information Assurance (IA)

j. DoD 5220.22-M, National Industrial Security Program Operating Manual, February

28, 2006 (NISPOM)

k. DoD 8570.01-M, Information Assurance Workforce Improvement Program, 19 Dec 2005 (Incorporating Change 3, 24 Jan 2012)

l. DoDD 8000.01 Management of the Department of Defense Information Enterprise, 10 February 2009

m. DoDD 8100.02, Use of Commercial Wireless Devices, Services, and Technologies in the Department of Defense (DoD) Global Information Grid (GIG), 14 April 2004, Certified Current as of 23 April 2007

n. DoDD 8570.01 Information Assurance Training, Certification, and Workforce Management, 15 August 2004, Certified Current as of 23 April 2007

o. DoDI 4630.8, Procedures for Interoperability and Supportability of Information Technology (IT) and National Security Systems (NSS), 30 June2004 p. DoDI 8500.1, Cybersecurity, 14 March 2014

q. DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 12 March 2014

r. DoDI 8520.2, Public Key Infrastructure (PKI) and Public Key (PK) Enabling, 01 April

s. DoDI 8551.1, Ports, Protocols, and Services Management (PPSM), 13 August 2004

t. DoDI 8580.1, Information Assurance in the Defense Acquisition System, 9 July 2004

u. DoDI 8581.01, Information Assurance (IA) Policy for Space Systems Used by the Department of Defense, 8 June 2010

v. DON CIO Memo 02-10, Department of the Navy Chief Information Officer Memorandum 02-10 Information Assurance Policy Update for Platform Information Technology, 26 April 2010

w. DON letter 5239 NAVAIR 726/2322 of 18 Feb 09, NAVAIR Data at Rest Policy x. Federal Information Processing Standards Publications (FIPS PUB) http://www.nist.gov/itl/fips.cfm

y. National Security Telecommunications and Information Systems Security Policy NSTISSP No. 11, Revised Fact Sheet National Information Assurance Acquisition Policy, July 2003.

aa. Office of the Chief of Naval Operations OPNAV INST 5239.1C, Navy Information Assurance (IA) Program, 20 Aug 08

bb. SECNAV M-5239.1, Department of the Navy Information Assurance Program; Information Assurance Manual, November 2005

cc. SECNAVINST 5230.15, Information Management/Information Technology Policy for Fielding of Commercial Off the Shelf Software, 10 April 2009

dd. SECNAVINST 5239.3B, Department of the Navy Information Assurance Policy, 17 June 2009

ee. SECNAVINST 5239.19, Department of the Navy Computer Network Incident Response and Reporting Requirements, 18 March 2008

ff. The National Security Act of 1947

gg. Title 40/Clinger-Cohen Act

hh. Title 44/ Federal Information Security Management Act

All IT procured on behalf of this contract shall meet all DoD/DON and NAVAIR IA polices. Failure to follow these policies will result in denied access to NMCI, One Net, Integrated Shipboard Network System (ISNS) and other DON, DoD and Joint Networks. These IA policies are standard across the Department and ensure IA compatibility and interoperability.

IT systems and or networks operated by contractors pursuant to a NAVAIR contract, regardless of the level of data processed, shall be operated in accordance with the NISPOM.

Contractor-owned equipment shall be permitted connections to NAVAIR/DoD networks in order to carry out the performance of this contract. All Contractor-owned hardware and/or software shall meet DoDI 8500.2 Cybersecurity Controls, is subject to validation scanning and must be approved by the NAVAIR site IA Manager prior to connection.

The following specific criteria must be met before the contractor may be connected to any DoD or NAVAIR network in support of this contract. Requirements include:

a. Network Vulnerability Scanning. NAVAIR Deputy CIO for Information Assurance maintains authorized auditing tools and shall provide for firewall/port scans, device discovery scan, vulnerability assessment, and other requirements as required to ensure secure interoperability with DoD Contracts. The contractor shall be responsible for the remediation of any equipment that fails these audits prior to the connection the system to the networks; Results of approvals shall be documented via Memorandum of Agreement with the Facility Security officer and the Defense Security Service Representative for that contractor;

b. Extent of Validation Scanning. To prevent scanning of corporate assets, all such networks, equipment and connections shall be physically segregated from any government/contractor corporate networks that are not in direct support of DoD contracts;

c. Circuit Provisioning. Any circuit or connection between NAVAIR and/or DoD site and the contractor site shall be provisioned via the Defense Information Security Agency and comply with CJCSI 6211.02C (series), Defense Information System Network (DISN): Policy and Responsibilities, 9 July 2008;

d. Servicing Systems from a Remote Contractor Site. Remote Access Service connections that allow off-station operation and/or administration of contractor owned systems, located at any NAVAIR facility or site, shall not be permitted, with the exception of those systems connecting to the Command via the Outreach Services identified in Section 7, Enterprise Architecture;

e. Memorandum of Agreement and Inter-Connection Agreements. An Information Assurance Memorandum of Agreement (MOA) between the contractor owning the equipment and AIR-7.2.6 shall be developed and signed before the equipment can be connected to NAVAIR networks. Failure to comply with the signed MOA shall be grounds for disconnection from the network.

2.8 Enterprise Architecture:

a. Contractor Networks and Connections. Contractor-owned and operated networks are prohibited on any Naval Air Systems Command (NAVAIR) facility or site in support of this contract. The contractor may access non-government, external IP space via the NAVAIR-provided Virtual Private Network (VPN) Outreach service or NAVAIR CIO approved Internet Protocol (IP) service.

b. Architecture Compliance. The contractor shall ensure all IT solutions, including database solutions, comply with the appropriate NAE Enterprise Architecture, and are verified by the NAVAIR Enterprise Architect (AIR-7.2.3) prior to build out.

c. Disclosure of pre-existing networks, circuits or connections. Any and all networks, circuits or connections between the contractor and any NAVAIR site related to previous contracts shall be identified in the MOA. Failure to comply and subsequent discovery of an unregistered network, circuit or connection shall be grounds for immediate disconnection.

3.0 Requirements

3.1 Software Maintenance Plan

Annual Maintenance: Free Upgrades to software as soon as they become available, live support from 8:00am to 5:00pm PST, Unlimited support via the Internet and email, unlimited telephone support, Software fixes and updates delivered via the internet and Newsletters delivered via email.

3.2 Section 508 Program Need:

Requirements for accessibility based on Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d) are determined to be relevant for the following program need: "Software maintenance"

a. Section 508 Product Requirements:

Technical standards from 36 CFR part 1194 Subpart B have been determined to apply this acquisition. Solicitation respondents must describe how their proposed Electronic and Information Technology (EIT) deliverables meet at least those technical provisions identified as applicable in the attached Government Product/Service Accessibility Template (GPAT).

Functional performance criteria from 36 CFR part 1194 Subpart C have been determined to apply this acquisition. Solicitation respondents must describe how their proposed EIT deliverables meet at least those functional performance criteria identified as applicable in the attached GPAT.

Information, documentation, and support requirements from 36 CFR part 1194 Subpart D have been determined to apply this acquisition. Solicitation respondents must describe how the information, documentation, and support proposed for EIT deliverables meet at least those information, documentation, and support requirements identified as applicable in the attached GPAT.

b. Section 508 Evaluation Factors

Responses to this solicitation will only be considered for award after it has been determined that the proposal adequately addresses the requirements for Section 508. Only proposals which contain adequate information to document their responsiveness to the Section 508 requirements (i.e. a completed GPAT or VPAT or equivalent) will be eligible for any additional merit consideration.

If the deliverable proposed in response to this solicitation includes features and functions in addition to those identified as requirements, these features and functions also need to conform to relevant Section 508 technical provisions, functional performance criteria, and information, documentation and support. The accessibility of these additional features and functions should be described in the completed GPAT, VPAT or equivalent supporting information.

NOTE TO PROPOSAL REVIEWERS: pre-solicitation market research on the commercial availability of deliverables that meet the identified Section 508 standards is reflected in the attached Evaluation Product/Service Accessibility Template (EPAT). This research on commercial availability is based on pre-solicitation market research done by the requiring official and is not exhaustive nor does it necessarily reflect the entire marketplace. This template may be used to assist in the evaluation of GPAT data supplied as part of a proposal received in response to this solicitation.

c. Section 508 Acceptance Criteria

Supplies or services delivered as a result of this solicitation will be accepted based in part on satisfaction of identified Section 508 requirements for accessibility.

If the deliverable includes features and functions in addition to those identified as requirements, these features and functions also need to conform to relevant Section 508 technical provisions, functional performance criteria, and information, documentation and support.

NOTE FOR DELIVERABLE ACCEPTANCE / QUALITY ASSURRANCE: generally accepted inspection and test methods corresponding to the identified Section 508 standards are reflected in the attached EIT Acceptance Guide. This guide may be used to assist in the inspection and testing of supplies and services provided as contract deliverables corresponding to this solicitation.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 23-SEP-2019 TO

22-SEP-2020

N/A
COMFRC 7.2.2.2

DENISE JUDD

6003 FLIGHT LINE DR

JACKSONVILLE FL 32221-8183

904-317-5559 FOB: Destination N65886

CLAUSES INCORPORATED BY REFERENCE

52.247-34
F.O.B. Destination
NOV 1991

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)

(a) Definitions. As used in this clause--

Contract financing payment means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.

(1) Contract financing payments include--

(i) Advance payments;

(ii) Performance-based payments;

(iii) Commercial advance and interim payments;

(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;

(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.

(2) Contract financing payments do not include--

(i) Invoice payments;

(ii) Payments for partial deliveries; or

(iii) Lease and rental payments.

Electronic form means any automated system that transmits information electronically from the initiating system to affected systems.

Invoice payment means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.

(1) Invoice payments include--

(i) Payments for partial deliveries that have been accepted by the Government;

(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;

(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.

(2) Invoice payments do not include contract financing payments.

Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.

Receiving report means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.

(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.

(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:

(1) Electronic Data Interchange.

(2) Secure File Transfer Protocol.

(3) Direct input through the WAWF website.

(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when--

(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or

(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.

(e) Information regarding WAWF is available at https://wawf.eb.mil/.

(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(End of clause)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
____
Issue By DoDAAC
____
Admin DoDAAC**
____
Inspect By DoDAAC
____
Ship To Code
____
Ship From Code
____
Mark For Code
____
Service Approver (DoDAAC)
____
Service Acceptor (DoDAAC)
____
Accept at Other DoDAAC
____
LPO DoDAAC
____
DCAA Auditor DoDAAC
____
Other DoDAAC(s)
____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-21
Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.212-4
Contract Terms and Conditions--Commercial Items
OCT 2018
52.244-6
Subcontracts for Commercial Items
JAN 2019

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2019)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Nov 2016) of 52.219-9.

____ (iii) Alternate II (Nov 2016) of 52.219-9.

____ (iv) Alternate III (Nov 2016) of 52.219-9.

____ (v) Alternate IV (Aug 2018) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).

____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

X (26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).

X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (28)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (Feb 1999) of 52.222-26.

X (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212).

____ (ii) Alternate I (July 2014) of 52.222-35.

X (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

____ (ii) Alternate I (July 2014) of 52.222-36.

X (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

X (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

____ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).

____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

X (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (48) 52.225-5, Trade Agreements (AUG 2018) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

____ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C. 3332).

____ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).

____ (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

____ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

____ (iii) Alternate II (Feb 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

_____ (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).

_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(v) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).

(xiii) _____ (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xvi) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).

(xvii)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).

(xviii) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xix) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

Section K - Representations, Certifications and Other Statements of Offerors

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.