SOW_-_GAGE_Kit_-Attach_1.pdf
PDF 144 KB Posted
- Attached to
- Calibration Standards and Ancillary Equipment Federal contract opportunity
- Solicitation number
- N00421-18-R-0055
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MM_J&A_Redacted.pdf | ||
| N00421-18-R-0055.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
RF/Microwave Project Stock BS-650013.APN7METCAL92
A. Background
The use of NAVAIR METCAL equipment funding is to procure Calibration Standards (CALSTDs) and ancillary equipment for Aviation Fleet Intermediate Calibration Activities, Fleet Training Activities and Aviation Navy
Calibration Laboratories (NCLs) to support Aviation Organizational and Intermediate (I) level maintenance assets.
All Cal Standards listed for procurement must first go through an approval process. This process includes: initial submission by the fleet; review and prioritization by the Fleet TYCOM’s; laboratory workload justification and standardization review by a NAVAIR METCAL technical review team; overall procurement strategy review to assess overall program objectives, priorities and funding.
B. Tasking:
The contractor shall provide the following equipment (There are no substitutes allowed for this equipment):
1) P/N A034E 3.5/2.92 GAGE KIT Qty 90
I. To include the following:
a) Manual
b) +/- 0.000050 gage accuracy
c) Thread on
d) Corresponding master setting gages for each
e) Alignment beads
f) Wooden case for each
2) Ansi Cal- Calibration with recorded data/Cert/sticker for the A034E Qty 90
3) P/N U101A4 WR28 straight section Qty 1
C. Deliverables
Delivery of the equipment shall be provided at the following address:
1. To be delivered to:
NAVAIR Calibration Standards
Attn: Lou Cerrillo (UIC N48535)
BLDG 612, Bay 9 MCAS
Beaufort, SC 29904
Phone: (843)524-1405
D. Delivery Schedule as follows:
1st delivery of 6 kits in 14 weeks after receipt of contract
6 kits delivered every 10 days after the first shipment until order is filled.
All kits must be delivered no later than 238 Days after contract award.
***PARTIAL SHIPMENT ACCECPTED***
E. Invoicing
All invoicing shall be submitting into Wide Area Workflow for payment after ALL material is received in the condition as stated in section B.
VENDOR – IF ELECTRONIC EQUIPMENT, PLEASE MARK BOX/PACKAGE CONTAINING ELECTRONIC
EQUIPMENT WITH THE “DO NOT SCAN” STICKER
File details come from the government source that posted it.