N0040620C0012 Award.pdf

PDF 955 KB Posted

Attached to
Telecommunication Support Service Federal contract opportunity
Solicitation number
N0040620R0004
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is an award notice for a firm fixed-price contract issued by the Department of the Navy Naval Supply Systems Command. First American Business Solutions, Inc. was awarded contract N0040620C0012 for $3,970,762.22 to provide telecommunication support services. The contract was awarded on April 29, 2020 and requires the contractor to perform operations and maintenance of telecommunications, provide materials and replacement parts, conduct emergent repairs, and complete a phase-in period in accordance with the performance work statement. The contractor must comply with quality assurance and surveillance requirements, information assurance provisions, and security program guidelines. The contract has a base period of one year with four additional option years that can be exercised.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N0040620R0004 07-Feb-2020

b. TELEPHONE NUMBER

360-476-7806

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 12 Mar 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

X

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.401-372-7792

N004069. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

N0040620C0012 01-May-2020

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JEFFERY S. BULTHUIS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N6866020RC041AK

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

James K. Wasson / Contract Specialist

See Schedule $772,796.51

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE SCHEDULE

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE 5GZ21 FACILITY

OFFEROR CODE

NAVSUP FLC PUGET SOUND

467 W STREET, 2ND FLR

ATTN: JEFFREY BULTHUIS

BREMERTON WA 98314

FIRST AMERICAN BUSINESS SOLUTIONS, INC.

DAVID COLANGELO

3524 FLORAMAR TERRACE

NEW PORT RICHEY FL 34652-3008

DFAS-CLEVELAND CENTER

P.O. BOX 99602

CLEVELAND OH 44199-8022

18a. PAYMENT WILL BE MADE BY CODE N68732

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE

SEE ITEM 9

15. DELIVER TO CODE N68660 16. ADMINISTERED BY

Net 30

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

NCTAMSPAC DET PS

GOVERNMENT REPRESENTATIVE

1100 HULEY RD STE 116

SILVERDALE WA 98315-1100

360-476-1115FAX:

TEL: 360-476-7806

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$12,000,000

NAICS:

811213

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

X

EMAIL: james.wasson@navy.mil

360-476-4472TEL:

31c. DATE SIGNED

29-Apr-2020

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF80

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N0040620C0012

Section A - Solicitation/Contract Form

AWARD INFORMATION

1. CLINS 0001- 0004 ARE AWARDED IN THE AMOUNT OF $772,796.51

2. The Period of Performance is 01 May 2020 through 30 April 2021.

3. The Government reserves the right to exercise options in accordance with 52.217-9:

CLINs 1001- 1003 with a period of performance of 1 May 2021 through 30 April 2022;

CLINs 2001- 2003 with a period of performance of 1 May 2022 through 30 April 2023;

CLINs 3001- 3003 with a period of performance of 1 May 2023 through 30 April 2024;

CLINs 4001- 4003 with a period of performance of 1 May 2024 through 30 April 2025;

4. CONTRACTOR POINT OF CONTACT (POC)

POC: David Colangelo

PHONE: 401-258-2095

FAX: 360-476-4656

E-MAIL: david.colangelo@firstamericanbusiness.com

5. BUYER POINT OF CONTACT (POC)

POC: Jeff Bulthuis

PHONE: 360-476-7806

FAX: 360-476-4656

E-MAIL: Jeffrey.bulthuis@navy.mil

6. CUSTOMER POINT OF CONTACT:

POC: Fred Fox

Phone 360-396-7067

Email: frederick.g.fox@navy.mil

7. ADMINISTRATION ISSUES: PLEASE SEE ADMINISTERED BY BLOCK # 9.

PLEASE EMAIL YOUR QUESTIONS OR ADMINISTRATION ISSUES TO THE

BUYER LISTED ABOVE SO THAT THEY MAY BE FORWARDED TO THE CORRECT ADMINISTRATOR.

8. INVOICE INFORMATION:

THE CONTRACTOR SHALL UTILIZE THE ELECTRONIC INVOICING UPON DELIVERY OF SUPPLIES

INDICATED HEREIN. INVOICES MUST BE SUBMITTED ELECTRONICALLY USING WIDE AREA WORK

FLOW (WAWF) – RECEIPT AND ACCEPTANCE. THE CONTRACTOR SHALL SELF-REGISTER AT THE

WEB SITE: HTTPS://WAWF.EB.MIL . CONTRACTOR TRAINING IS AVAILABLE ON THE INTERNET AT

HTTPS://WAWFTRAININGEB.MIL . ADDITIONAL SUPPORT CAN BE ACCESSED BY CALLING THE

NAVY WAWF ASSISTANCE LINE: 1-877-251-WAWF (9293). SEE DFARS CLAUSE 252.232-7006

LOCATED ON THE CONTRACT

9. KEY PERSONNEL: THE PERSONNEL PROPOSED ARE DEEMED ESSENTIAL TO THE CONTRACT

PERFORMANCE AND WILL NOT BE REPLACED WITHOUT THE CONTRACTING OFFICER’S

APPROVAL. FABS WILL PROVIDE A RESUME IAW ATTACHMENT 1 OF SECTION J FOR THE

PROPOSED REPLACEMENT KEY PERSONNEL.

mailto:david.colangelo@firstamericanbusiness.com mailto:Jeffrey.bulthuis@navy.mil mailto:frederick.g.fox@navy.mil

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 11.50 Months $54,851.87 $630,796.51 Operations and Maintenance

FFP

Provide services to support Operation and Maintenance of telecommunications in accordance with the PWS.

FOB: Destination

MILSTRIP: N6866020RC041AK

PURCHASE REQUEST NUMBER: N6866020RC041AK

PSC CD: J058

NET AMT $630,796.51

ACRN AA

CIN: N6866020RC041AK0001

$630,796.51

0002 115,000 Each $1.00 $115,000.00 NTE Materials

FFP

This is a not to exceed CLIN for 115,000 dollars for consumables, materials, and replacement parts to support operation and maintenance services. Contractor agrees to bill materials at cost plus 10 percent.

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $115,000.00

CIN: N6866020RC041AK0002

$115,000.00

0003 18,000 Each $1.00 $18,000.00 NTE Emergent Repairs

FFP

Provide services for outside of normal hour emergency operations and maintenance of telecommunications. This not to exceed CLIN is for 18,000 dollars in support of an estimated 180 hours. Proposed overtime rates are to be filled in below

ISP at 72.85 dollars per hour

OSP at 65.83 dollars per hour

Site Manager 89.22 dollars per hour

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $18,000.00

CIN: N6866020RC041AK0003

$18,000.00

0004 1 Each $9,000.00 $9,000.00 NTE

EXERCISED

OPTION

Phase in Period

FFP

Conduct phase in period in accordance with the PWS.

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $9,000.00

CIN: N6866020RC041AK0004

$9,000.00

1001 12 Months $55,126.13 $661,513.56 OPTION Operations and Maintenance

FFP

Provide services to support Operation and Maintenance of telecommunications in accordance with the PWS.

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $661,513.56

1002 115,000 Each $1.00 $115,000.00 NTE OPTION Materials

FFP

This is a not to exceed CLIN for 115,000 dollars for consumables, materials, and replacement parts to support operation and maintenance services. Contractor agrees to bill materials at cost plus 10 percent.

FOB: Destination

MILSTRIP: N6866020RC041AK

1003 18,000 Each $1.00 $18,000.00 NTE OPTION Emergent Repairs

FFP

Provide services for outside of normal hour emergency operations and maintenance of telecommunications. This not to exceed CLIN is for 18,000 dollars in support of an estimated 180 hours. Proposed overtime rates are to be filled in below

ISP at 73.22 dollars per hour

OSP at 66.13 dollars per hour

Site Manager 89.67 dollars per hour

FOB: Destination

MILSTRIP: N6866020RC041AK

2001 12 Months $55,401.76 $664,821.12 OPTION Operations and Maintenance

FFP

Provide services to support Operation and Maintenance of telecommunications in accordance with the PWS.

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $664,821.12

2002 115,000 Each $1.00 $115,000.00 NTE OPTION Materials

FFP

This is a not to exceed CLIN for 115,000 dollars for consumables, materials, and replacement parts to support operation and maintenance services. Contractor agrees to bill materials at cost plus 10 percent.

FOB: Destination

MILSTRIP: N6866020RC041AK

2003 18,000 Each $1.00 $18,000.00 NTE OPTION Emergent Repairs

FFP

Provide services for outside of normal hour emergency operations and maintenance of telecommunications. This not to exceed CLIN is for 18,000 dollars in support of an estimated 180 hours. Proposed overtime rates are to be filled in below

ISP at 73.58 dollars per hour

OSP at 66.49 dollars per hour

Site Manager 90.12 dollars per hour FOB: Destination

MILSTRIP: N6866020RC041AK

3001 12 Months $55,678.77 $668,145.24 OPTION Operations and Maintenance

FFP

Provide services to support Operation and Maintenance of telecommunications in accordance with the PWS.

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $668,145.24

3002 115,000 Each $1.00 $115,000.00 NTE OPTION Materials

FFP

This is a not to exceed CLIN for 115,000 dollars for consumables, materials, and replacement parts to support operation and maintenance services. Contractor agrees to bill materials at cost plus 10 percent.

FOB: Destination

MILSTRIP: N6866020RC041AK

3003 18,000 Each $1.00 $18,000.00 NTE OPTION Emergent Repairs

FFP

Provide services for outside of normal hour emergency operations and maintenance of telecommunications. This not to exceed CLIN is for 18,000 dollars in support of an estimated 180 hours. Proposed overtime rates are to be filled in below

ISP at 73.95 dollars per hour

OSP at 66.83 dollars per hour

Site Manager 90.57 dollars per hour

FOB: Destination

MILSTRIP: N6866020RC041AK

4001 12 Months $55,957.16 $671,485.92 OPTION Operations and Maintenance

FFP

Provide services to support Operation and Maintenance of telecommunications in accordance with the PWS.

FOB: Destination

MILSTRIP: N6866020RC041AK

NET AMT $671,485.92

4002 115,000 Each $1.00 $115,000.00 NTE OPTION Materials

FFP

This is a not to exceed CLIN for 115,000 dollars for consumables, materials, and replacement parts to support operation and maintenance services. Contractor agrees to bill materials at cost plus 10 percent.

FOB: Destination

MILSTRIP: N6866020RC041AK

4003 18,000 Each $1.00 $18,000.00 NTE OPTION Emergent Repairs

FFP

Provide services for outside of normal hour emergency operations and maintenance of telecommunications. This not to exceed CLIN is for 18,000 dollars in support of an estimated 180 hours. Proposed overtime rates are to be filled in below

ISP at 74.32 dollars per hour

OSP at 67.16 dollars per hour

Site Manager 91.02 dollars per hour FOB: Destination

MILSTRIP: N6866020RC041AK

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

TABLE OF CONTENTS

SECTION 1 SCOPE OF WORK

SECTION 2 ADMINISTRATIVE MATTERS

SECTION 3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

SECTION 4 CONTRACTOR FURNISHED ITEMS AND SUPPORT

SECTION 5 QUALITY ASSURANCE SURVEILLANCE PLAN

SECTION 6 CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)

SECTION 7 CONTRACTOR SUPPORT THROUGH THE ABILITYONE PROGRAM

SECTION 8 DEFENSE BIOMETRIC IDENTIFICATION SYSTEM FOR VENDOR BASE ACCESS

SECTION 9 CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES,

SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED

HEALTH INFORMATION

ATTACHMENTS LOCATED IN SECTION J

ATTACHMENT-1… Personnel Requirements for Labor Categories

ATTACHMENT-2… Historical Level of Effort

TECHNICAL EXHIBITS

TE-1… Publications, Standard Operating Procedures (SOP’s) and Tech Manuals

TE-2… Work Order Response Times

SECTION 1.0 SCOPE OF WORK

1.1 General Requirements

1.1.1 Introduction: The mission of NCTAMS PAC DET PS is to provide telecommunications operations and maintenance (O&M). This includes secure and reliable, classified and unclassified, voice and data services in support of C4I operations and exercises to locations listed in the

Performance of Work Statement (PWS), its tenant U.S Navy, Air Force, U.S. Coast Guard commands, other DoD agencies, and Commander Navy Region North West (CNRNW) Area of

Responsibility (AOR).

The contractor shall provide all material, labor, supplies, vehicles, test equipment, and any other items required to perform the PWS. The scope of this PWS provides for maintenance of Northern

Telecom Private Automated Branch Exchange (PABX) systems, AVAYA Systems, Voice Mail systems, Remote Intelligent Peripheral Equipment (IPE), batteries and rectifier systems, proprietary digital telephone sets, fiber optic and copper cable plant, main frames, and operator consoles. The contractor shall also be required to provide labor and material to maintain and install additional inside/outside cable plant and fiber optics, as well as equipment and labor to provide switch expansion capability and dot release software updates. Contractor shall be responsible for obtaining any necessary technical representative status, licenses, permits, to comply with any applicable U.S.

and laws, codes, and regulations required to perform their duties.

The work described in this PWS shall include a base period with four additional option years as described in the solicitation instructions to offerors of the awarded contract, unless sooner terminated by the Government. The work shall also include a 15-day orientation phase-in period, as described in the PWS under section 1.1.10

1.1.2 Place of Performance: The requiring activity for this contract is NCTAMS PAC DET PS. The following list outlines the specific areas where contract performance shall take place:

A. Naval Station Everett, Everett, WA

1. 2000 West Marine View Drive, Everett, WA

2. 13918 45 th

Ave NE, Marysville, WA

3. 21027 Jim Creek Road, Arlington, WA

B. Naval Air Station, Whidbey Island, Oak Harbor, WA

C. Naval Magazine, Port Hadlock WA

D. Naval Undersea Warfare Center, Keyport, WA

E. Pacific Beach Resort and Conference Center, Pacific Beach, WA

F. Naval Hospital Bremerton

G. Naval Base Kitsap, Bangor, Silverdale, WA

H. Puget Sound Naval Shipyard & Intermediate Maintenance Facility, Bremerton, WA

I. Naval Base Kitsap, Bremerton, WA

1.1.3 All labor categories/personnel, as proposed by the Contractor in their Technical Proposal, constitute the minimum staffing under this Contract. The Contractor shall provide at least this minimum level of properly trained and qualified staffing under the contract, during both the

Orientation/Phase-in period and during the life of the contract. During the period of orientation/phase-in, and for the life of the Contract, all on-site personnel as proposed by the Contractor shall be dedicated to this Contract and working on-site for a minimum of eight hours per day, 40 hours per week. Contract support includes:

OSP O&M support

ISP O&M support

Maintenance

Reports and Records

1.1.4 Hours of Operation: The Contractor shall ensure all timelines and contract requirements are continually met without any interruption during the life of the contract. The site shall be manned by sufficient, fully qualified personnel to respond to normal and emergent tasking while complying with all safety and security requirements. In order to provide sufficient coordination with Government personnel, the Contractors normal working hours will be structured within the core hours as outlined below:

A. The ISP/OSP Technicians and Site Manager shall report to work Monday through Friday and work a minimum of eight hours a day during the government standard business hours of 0800 through 1700. The core hours that must be covered each day Monday through Friday at

Naval Hospital Bremerton, Naval Air Station Whidbey Island; Building 975, and Everett

Naval Base; Building 2114, is 0800 to 1430 PST. ISP/OSP Technician support shall also be available for emergency recall IAW the PWS and Technical Exhibits.

B. The Site Manager shall provide procedures in writing, to identify steps for activating on-call and emergency contract support 24 hours a day, 7 days a week, 365 days a year (including leap year, and all Federal Holidays). These procedures must be delivered to the COR NLT that the last day of the phase-in period. The Contractor shall not bill, or be paid by the

Government, for any overtime that has not been pre-approved by the COR in accordance with these provisions.

Federal Holidays:

New Year’s Day 1 st January

Martin Luther King Day 3 rd

Monday in January

Presidents Day 3 rd

Monday in February

Memorial Day Last Monday in May

Independence Day 4 th July

Labor Day 1 st Monday in September

Columbus Day 2 nd

Monday in October

Veteran’s Day 11 th

November

Thanksgiving Fourth Thursday in November

Christmas 25 th

December

1.1.5 Location: The primary equipment to be maintained under this PWS is located in various facilities as outlined below:

A. Main Switch (Meridian 1, Opt 81), Network Management System, Nortel Call Pilot Voice

Mail, Battery Plant.

1. Naval Air Station Whidbey Island

Oak, Harbor, Washington 98278 Building 975

Digital Trunk Quantity: 950 Serial Number Z04354

Digital Port Quantity: 2050 End User Name NAS WHIDBEY

Analog Port Quantity: 2460 System Type OPT81C

ISDB BRI Port Quantity: 16

B. Meridian 1, Opt 61, Battery Plant.

Building 993 Hospital

Digital Trunk Quantity: 115 Serial Number D18922 Digital Port Quantity: 234 End User Name NAS WHIDBEY

Analog Port Quantity: 310 System Type OPT61C

ISDN BRI port quantity: 6

C. Meridian 1, Opt 61, Battery Plant.

Building 12 Sea Plane Base

Digital Trunk Quantity: 211 Serial Number D18923

Digital Port Quantity: 70 End User Name NAS WHIDBEY

Analog Port Quantity: 139 System Type OPT61C

ISDN BRI Port Quantity: 2

D. Remote Intelligent Peripheral Equipment (IPE) Shelf, Battery Plant

Building 386 (Hg 5)

Building 2547

Building 103

Building 108

Building 2700 (NOPF)

Building 385

Building 976

Building 2771

Building 410 (Hg 6)

Building. 17 (NEX)

Building. 2733 (Hg 11)

Building. 2544 (Hg 7)

2. 21027 Jim Creek Road

Arlington, Washington 98223-8599

G650 Gateway with CICSCO 2811 STN 0005319846 Digital Trunk Quantity: 1 (24 members) Remote gateway connected back to Everett

Digital Port Quantity: 19

Analog Port Quantity: 47

ISDN BRI Port Quantity: 4

E. Main Switch, Avaya S8710, Network Management System and Callware Callegra voice mail system, battery plant.

1. Everett Naval Base

2000 West Marine View Drive

Everett Washington 98201

Building 2114

Digital Trunk Quantity: 13 (379 Members) STN 0005319846

Digital Port Quantity: 1002 CM4 Main Site

Analog Port Quantity: 753

ISDN BRI port quantity: 23

F. Avaya S8710, Battery Plant.

1. Smokey Point Complex

13918 45 th

Ave NE

Marysville Washington 98271

Digital Trunk Quantity: 4 (96) members STN 5319846

Digital Port Quantity: 128 Connected back to Everett main site has a

Analog Port Quantity: 120 survivable processor

ISDN BRI port quantity: 1

G. Avaya Definity_G3R_ Battery Plant. Voice Mail Intuity/Audix

1. Naval Hospital Bremerton

Bremerton, Washington

The switch currently has 12 trunks. STN 2932795 Main CM4 STN

6 GROUP TYPE ISDN STN 2932800

8 GROUP TYPE TIE

The switch currently has:

190 Analog cards with 16 ports per card Total: 3040

49 Digital cards with 8 ports per card Total: 392

10 Digital cards with 24 ports per card Total: 240

H. OCTEL Voice Mail

Note: NCTAMS PAC DET PS DSN Switches and voicemail systems may be upgraded; the contractor shall maintain all DSN Switches and new voice mail systems based on current type and version of equipment. For reference the AVAYA SOLD TO NUMBERS ARE:

Naval Base Bremerton #2932800

Everett #0005319846

1.1.6 Outside Plant (OSP) O&M support: The Contractor shall provide OSP O&M to include, installing, inspecting, splicing, testing, repairing, replacing, upgrading and providing documentation for both copper and fiber optic backbone and distribution systems from the vertical frame to the end-user premise equipment IAW standards, codes and regulations specified in the PWS and Technical

Exhibits. Contractor shall identify, document and request maintenance actions from the BCO trouble desk on all outside plant cable deficiencies discovered. Specifically, the Contractor shall provide OSP O&M support as follows:

A. Contractor shall accomplish work orders in accordance with the work order response times listed in PWS and Technical Exhibits.

B. Contractor shall install, modify, replace, lace, maintain, relocate, and remove all telephone instruments, Local Area Network circuits, special circuits, house cable, premise copper and fiber wiring and similar communications equipment, as approved by the NCTAMS PAC DET

PS COR via work orders. Contractor support for NCMI and PIG (Puget Infrastructure Grid) requirements is considered part of this effort.

C. Contractor shall install, modify, replace, maintain, relocate, and remove all terminal boards, cross connect boxes, fiber optic couplers, fiber media converters, and communications pedestals, and shall run all cross connects, ensuring that all are properly grounded, tagged, labeled and/or stenciled IAW the PWS and Technical Exhibits.

D. Contractor shall provide a copy of all completed work requests/trouble tickets to the BCO trouble desk and the BCO with updates for changes to communication circuits.

E. Contractor shall perform and record an annual check of all cable vaults to determine if cables are properly bonded to the ground, and to ensure cables are properly supported on the cable racks. The Contractor shall provide a written report of findings to the COR within 15 days of annual check and correct all deficiencies within 60 days.

F. Contractor shall install telephone premise wire from the outside cable plant terminal protector to the telephone instrument, IAW the PWS and Technical Exhibit 1.

G. Contractor shall install, splice, and repair all outside cable plant cables/fiber optic cables.

Fiber optic splices will use fusion splice and/or mechanical splice techniques IAW the PWS and Technical Exhibits. Contractor shall test all fiber optic cables, multimode and single mode, prior to installation, and upon completion of connections, ensuring that new installations and repairs are IAW the PWS and Technical Exhibit 1. Test results shall be reported to COR upon completion.

H. Contractor shall maintain all outside cable plant man-holes and hand-holes, and shall perform and record an annual clearing/cleaning of all foreign matter to ensure that all cables/conduits are accessible and in good condition. Man-holes/hand-holes shall be inspected for water intrusion monthly and after heavy rains, and dewatered to a maximum water level of not more than 2 inches. The Contractor shall provide a written report of findings to the COR within 30 days of inspection and correct all deficiencies within 15 days.

I. Contractor shall maintain copper cable and fiber optic assignment records in hard copy and electronic format IAW BCO requirements, programs, and processes. The Contractor shall conduct an inspection of cable records quarterly and ensure all changes to existing cable records are forwarded to the NCTAMS PAC DET PS COR.

J. Contractor shall identify and label in a manner acceptable to the COR items to include the following Government property: underground cable routes, manholes, hand holes, pedestals, and cables.

K. The Contractor shall provide data from surveys that identifies required corrective maintenance of base infrastructure to the COR within 15 days of survey.

L. Contractor shall ensure that all backup batteries for telephone switch and related equipment are maintained IAW the PWS and Technical Exhibits.

M. The Contractor shall provide Installation, Clean up and Repair of Telecommunications racks, cabinets and closets to correct deficiencies identified by the COR.

N. If required maintain the Puget Information Grid IAW with local directives.

1.1.7 ISP O&M support: The Contractor shall provide ISP O&M to include maintaining the installed telephone switches at designated sites IAW PWS, and associated ancillary equipment including voice mail. Specifically, the Contractor shall provide inside plant O&M support as follows:

A. Contractor shall be required to perform all telephone switch maintenance IAW the PWS and

Technical Exhibit 1. Contractor shall be required to troubleshoot and repair the base telephone switch at locations outlined in the PWS, to include all remote switching equipment, and ancillary equipment to include voice mail.

B. Contractor shall report all outages immediately to the COR and if unable to resolve an outage on the telephone switch or related equipment within 30 minutes, the Contractor shall contact the Technical Support “Hotline” as noted in local SOPs.

C. Contractor shall operate the telephone maintenance console to install new telephone extensions, perform programming changes on telephone numbers, set/change class of service, and to activate/deactivate special features IAW the PWS and Technical Exhibit 1.

D. Contractor shall troubleshoot telephone outages and restore service (Tier 1 support), or refer outages to the proper repair agency. When required by other communications facilities, including the commercial telephone provider, coordinate in troubleshooting end-to-end circuit problems whether operated and maintained by government or other agencies IAW the PWS and Technical Exhibit 1.

E. Contractor shall maintain the telephone main distribution frame (MDF), intermediate distribution frame(s) (IDF), and all switch and cable records.

F. Contractor shall perform all cross connects at the MDF/IDF for installation, relocation, or removal of telephone service or communications circuits transiting the facility.

G. Contractor shall serve as a single point of contact for all telephone communications outages in coordination with maintenance control, and the BCO trouble desk.

H. Contractor shall coordinate with Tier 2 maintenance support contractor in identifying, addressing and resolving difficult preventive and corrective system maintenance issues that require a manufacturer’s expert level of knowledge.

I. The Contractor shall monitor all circuits and systems within the switch for degradation. When degradation is discovered or notification is provided, the Contractor shall immediately begin corrective efforts to restore normal operations.

J. The Contractor shall perform quality control tests and measurements on all trunks, channels, circuits, and equipment for which the command is responsible for IAW the PWS and

Technical Exhibit 1.

K. The Contractor shall request and schedule authorized outages for all communications in their area of responsibilities to include subordinate sites IAW the PWS and Technical Exhibit 1.

L. The Contractor shall be responsible for proper installation, modification, and removal of all circuits, wiring, and ancillary equipment IAW TSO’s.

M. The Contractor shall respond, in accordance with Technical Exhibit 2, to all alarm conditions such as the Telephone Switch, UPS/Generator system, or other station alarms. The Contractor shall take action to investigate, isolate and clear all alarms on equipment and systems the Contractor is responsible for IAW the PWS and Technical Exhibits. In the event an alarm condition is present on equipment or systems the Contractor is not responsible for such as the

UPS/generator system, fire, HVAC, or intruder alarms, the contractor shall immediately notify the appropriate department for action to clear alarms and restore operations. The

Contractor shall be subject to recall after normal working hours to take action on all alarms and system outages they are notified of IAW NCTAMS PAC DET PS SOP’s.

N. The Contractor shall install, adjust, and test all ancillary equipment IAW the PWS and

Technical Exhibits.

O. The Contractor shall comply with all security requirements as identified in the DD-254 attached to this contract.

P. The Contractor shall perform monthly scanning and assessments alone with updating systems with fixes, patches, definitions and service packs.

Q. REMOVED

1.1.8 Maintenance: The Contractor shall provide preventive and corrective maintenance for all equipment and systems IAW the PWS and Technical Exhibits and as prescribed by NCTAMS PAC

DET PS 3M Coordinator. Specifically, the Contractor shall provide Maintenance as follows:

A. The Contractor shall implement and manage PMS. Successful performance of the Contract requires the Contractor to maintain, at a minimum, a PMS PPR of 80%. The Contractor shall complete all planned maintenance within the time frame IAW MIPs and MRCs.

B. The Government shall provide MIPs and MRCs during the Phase-In period. MIPs are normally updated quarterly and are provided by the Government. Increases maintenance hours may result in a contract modification. The man-hours expended for maintenance is identified in the Technical Exhibits.

C. The Contractor shall comply with PQS requirements IAW Technical Exhibits and station

SOPs. The Contractor shall be responsible to comply with maintenance program safety requirements during the performance of this Contract.

D. All maintenance and repair work shall conform to the highest professional standards and shall restore original equipment standards of performance, operability, reliability and accuracy.

The Contractor shall not exchange subassemblies, materials or parts among equipment

(cannibalize) without specific written approval of the COR, nor shall the Contractor substitute or replace parts or material with a grade of part or material less than that provided by the original equipment manufacturer.

1.1.9 Reports and Records: The Contractor shall provide reports and records as required to document all contract support activities. Specifically, the Contractor shall provide Reports and Records as follows:

A. Contractor shall maintain station logs IAW NCTAMS PAC DET PS SOP’s. At a minimum, the Contractor shall maintain Master Station Logs for below listed work areas and make all logs available to the Government when requested.

Outside Plant

Inside Plant

B. The Contractor shall provide Weekly Status report to include Outside Plant problems, Link/Trunk/Circuit Outages, Inside Plant and Telephone Switch Issues and Power/AC Issues to the COR. The report will identify both the problem and resolutions in the format outlined in the Technical Exhibits and SOPS.

C. The Contractor shall work with the site BCO to ensure the Government provided cable records system is maintained and updated with current records to include building numbers, cable pairs, pedestals, etc. The Contractor shall ensure that trouble reports and work requests are processed using the Government provided procedures and GFE.

D. The Contractor shall provide ISP/OSP testing (Point to Point/End to End), certification and labeling of new infrastructure IAW the PWS and Technical Exhibits.

E. The Contractor shall provide all other reports and records IAW the PWS and Technical

Exhibits.

1.1.10 Orientation/Phase-In Period: Orientation/Phase-in period is the period of time required by the

Government to ensure a satisfactory transition and turnover from the incumbent Contractor to the new

Contractor. If the incumbent Contractor is the successful offeror and becomes the new Contractor, then the Government will not exercise an Orientation/Phase-in period as part of this contract. The

Contractor shall be required to provide all personnel, as offered in their Technical Proposal, to be on-site for the 15-day period prior to the start of full contract performance. The purpose of this period is for Contractor personnel to become familiar with the duties to be assigned and to participate in the turnover of equipment and property. The start of full contract performance is the date when the new

Contractor takes full responsibility for the operation and maintenance of the equipment. All activity during the Orientation/Phase-In period will be conducted in such a manner as to not interfere with, disrupt, or hinder the incumbent personnel in the performance of their assigned functions. During the

Orientation/Phase-In period, the Contractor shall meet the following minimum performance benchmarks:

A. Observe operation and maintenance activities to gain experience and familiarization with tasks to prepare to assume full responsibilities under the Contract.

B. Establish an orderly transition of duties and responsibilities from the incumbent to the oncoming Contractor. Turnover activities shall include, as a minimum: coordinating procedures for turnover inspection and documentation; accomplishing inventory of

Government-furnished property; observing demonstration/performance of equipment familiarization with Navy and site-specific procedures and methods.

C. Establish a positive management climate by formulating and implementing appropriate internal policies or procedures designed to assign schedules and tasks appropriate to the designated positions; establish logging and record keeping procedures; integrate and train personnel; and familiarization with operational tasks and reporting procedures.

D. Establish company operations and interaction/communication with Government personnel.

E. Familiarization with manuals, site technical library (including schematics and drawings), reports, maintenance histories, logs, records and procedures.

F. Contractor Personnel Exempted from Phase-in. Personnel who are currently employed by the

Government or its Contractor work force and already working at the facility, but have been hired by the new Contractor, may be exempted from participating in the orientation/phase-in period upon written request and approval from the Contracting Officer. All requests for exemption shall be submitted by the Contractor to the COR, who shall review the list and forward it to the Contracting Officer for a determination. The Contracting Officer, or delegated representative, will make the final determination and issue approval or disapproval thereof. The request shall include, but not be limited to, a list of nominees for exemption, their titles, current positions with the U.S. Government or its Contractor work force, and reason for requested exemption. Requests for exemption shall be submitted in sufficient time for the request to be denied or granted prior to the date required to report on site.

1.1.11 Transition Plan: The Contractor shall prepare and maintain a transition plan that ensures:

A. A smooth transition from contract start date to full operational status (phase-in).

B. A smooth transition from current contract performance to performance by a different Contractor or by the Government in a follow-on period (phase-out).

1.1.12 Phase-Out Period: The Contractor shall be required to provide phase-out coordination and familiarization for a new Contractor, or Government employees, for a period of fifteen (15) days prior to the conclusion of this Contract, regardless of reason for end of contract. The Contractor shall perform a joint inventory of material assets and determine condition of equipment with the

Government and the third party Contractor during the phase-out period. The Contractor shall prepare an inventory report, in a format agreed to by the Government.

1.1.13 Deliverables

Deliverable Due Date

Names of all on-site employees End of phase-in period

Information Assurance Plan NLT 15 calander days after contract start date

Safety Plan NLT 15 calander days after contract start date

Property Control Plan NLT 15 calander days after contract start date

Security Plan NLT 15 calander days after contract start date

Weekly Status Report Weekly

Outage Report Plan NLT 15 days after start of full contract performance

Annual Cable Vault Check W/I 15 days of annual check due date

On-Call/Emergency Procedures End of phase-in period

Spare Parts Annual Inventory June

1.2 Contractor Personnel Requirements

1.2.1 General: The Contractor shall be accountable to the Government for the performance of all employees, including subcontractors, used in fulfilling the requirements of this PWS. The Contractor must be a certified Avaya Partner. Contractor personnel qualifications will be subject to Government review. Contractor’s trainees shall not operate or perform maintenance on equipment without continuous supervision by fully qualified personnel. Contractor is responsible for all costs related to training discussed in this paragraph for its employees.

Contractor shall not employ a person for work under this contract if such a person is identified to the

Contractor by the KO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

In the event it becomes necessary to replace any contract personnel for any of the above reasons, Contractor shall not be reimbursed for costs associated with such removal including the costs for replacement of personnel so removed. Contractor shall inform the COR within 24-hours and submit a written report within five working days of incidents of misconduct by their employees that violate the laws of the United States.

Contractor personnel must be United States citizens, able to communicate effectively in English, both orally and in writing.

1.2.2 Staffing Provisions: Any vacancy shall be filled by fully qualified personnel within the same management or labor category of the existing vacancy within a 30-day period.

1.2.3 Contractor Employees Report: The Contractor shall provide the Government a written report, at the end of the orientation period, and upon the occasion of a vacancy filling, with the names of all on-site Contractor employees, their position as specified in the Technical Proposal, and job assignment.

1.2.4 Contractor Employees Report Updates: The Contractor shall submit report updates within five

(5) working days, when substitutions are made, and when employees are terminated, furloughed, suspended or on extended leave of absence (for reason of illness, death, military reserve or national guard activation or any other cause).

1.2.5 Staffing during Emergency and Disaster Support: In the event of an Emergency or Disaster as declared by the station Commanding Officer (CO), the operations may come under the direct control of the station CO or duly designated representative from the EOC (Emergency Operations Center).

1.2.6 Site Manager: The Contractor shall designate one individual with primary duties as the Site Manager. The Site Manager shall have the appropriate technical and managerial experience and be knowledgeable in all facets of the work performed under this PWS. The Site Manager shall generate weekly and/or monthly work schedules that shall be posted and available to the COR at least 5 days prior to start of schedule, and shall demonstrate Contractors ability to meet all contract requirements.

The Site Manager shall be the Contractor’s primary representative and have the Contractor’s full authority to act on matters pertaining to the performance of services under this contract. The Site

Manager shall designate an Alternate or Acting Site Manager in writing to the COR. The designated

Alternate or Acting Site Manager shall have full authority to take any necessary contract support actions when the Site Manager is absent or unavailable. The Site Manager or Alternate/Acting Site

Manager is not intended to be a dedicated fulltime position and may be assigned as a collateral duty.

The Site Manager shall ensure that all other contractor personnel assigned to this contract working at designated sites meet all contract requirements. A site manager is not required at each site.

A. In the event that the Site Manager will be absent for a period of one week or more, the COR shall be notified in advance and adequate provision shall be provided by the Contractor to ensure full contract coverage and alternate points of contact are provided.

B. The Site Manager shall provide an “outage reporting plan” to the COR, not later than 15 days after start of full contract performance, that ensures the COR is kept apprised in near real-time of any and all outage situations until restoral efforts are completed. An outage report will be submitted to the COR NLT 24 hours after an outage has occurred and will document details in accordance with station SOPs.

C. The Site Manager shall meet with the Government’s representative (normally the COR) or deemed representative at least once per week during the first six months of this contract.

Thereafter, meetings shall be held as often as deemed necessary by the COR. These meetings may be face-to-face, by phone or conference call as appropriate and as determined by the

COR. The Site Manager shall provide written minutes of these meetings within five calendar days of each meeting to the COR, unless otherwise waived by the COR.

1.2.7 Names/Number of On-Site Contractor Employees: The Contractor shall provide the Government not later than (NLT) the end of the Orientation/Phase-In Period, the names of all on-site Contractor employees, their position as specified in the Technical Proposal, job assignment, functional area, location, and security clearance.

1.2.8 Maintenance of Contractor’s List of Personnel: During the life of the contract, the Contractor shall continually update the list of on-site Contractor personnel when substitutions are made and when employees are terminated, furloughed, suspended, or on extended leave of absence due to illness, death in family, or any other cause. Changes to the list of on-site Contractor employees shall be effected by the Contractor within five working days of the actual substitution or termination of the employee.

1.2.9 Personal Hygiene and Dress: Contractor shall ensure employees maintain acceptable personal hygiene, as well as neat and acceptable work attire.

1.3 Contractor’s Quality Control (QC) Program

1.3.1 Overview and Responsibilities: The Contractor shall provide and maintain an inspection system and quality control program covering the services to be provided herein. A copy of the QC Plan shall be kept on site and available to the Government upon request.

1.3.2 Quality Control Plan specifics: The design of the inspection system is left to the Contractor's discretion, so long as it provides the desired quality control. The plan shall provide the Contractor’s detailed management, organization and operational plans for a continuously conducted performance-monitoring program for all systems, equipment and circuits to ensure high quality customer services by detection and correction of degradation before service interruptions occur. The plan shall include as a minimum:

a. A description of the inspection system that will be used to monitor and check the services required by this PWS. The description shall include specifics as to the areas to be inspected on both a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspectors.

b. Control procedures for any Government provided keys or lock combinations.

c. Description of the methods to be used for identifying and preventing defects in the quality of service performed.

d. A description of the records to be kept to document inspections and corrective or preventive actions taken.

e. Compliance with OSHA.

f. Compliance with EPA regulations.

g. Compliance with information, physical and personnel security requirements.

h. Standard forms and reports to be used to document quality control/performance testing, including work flow and distribution charts.

i. Locations, formats and procedures for Master Station Logs in accordance with NTP-4 and

DISAC 310-70-1, Supplement II, Chapter II.

1.3.3 Quality Control Plan periodic review: The Contractor shall update and revise the plan as necessary and submit to the COR for annual review in September of each year. The plan shall become the property of the Government upon contract completion.

1.4 Government Inspections and Evaluations

1.4.1 DISA Performance Evaluations (PEs): DISA may conduct PEs (usually bi-annually) to evaluate operational readiness of NCTAMS PAC DET PS to include but not limited to operations, maintenance, logistics, training, power production, documentation, circuit history, grounding, bonding and shielding.

The Contractor shall cooperate in these visits and correct any deficiencies discovered during the evaluations that are within the scope of the contract. The Contractor shall further submit a monthly status report to the COR for forwarding through the chain of command to DISA, NCTAMS PAC, and the KO, which reflects those deficiencies which have been corrected and an estimated date of completion for resolving all outstanding deficiencies. The Contractor shall submit a plan to the COR to correct these deficiencies within 10 days of receipt of the DISA PE final report and correct all deficiencies within 120 days of receipt of the final report. The Contractor shall bear all costs for labor hours and repair/adjustments to correct deficiencies cited in the DISA PE report that are in the

Contractor's area of responsibility as defined in the PWS.

1.4.2 Command Readiness Inspection: Command Inspections are conducted periodically

(approximately every three years) to evaluate the operational readiness of individual stations, detachments or sites. Command Inspection teams are comprised of personnel from FFC/C10F IG Staff and NCTAMS PAC Departments or Field Activities. Notification of inspection visits is normally provided 30 days in advance. The Government will notify the Contractor of all scheduled and unscheduled inspections. The objectives of the inspection are to:

A. Evaluate facilities and equipment to identify significant deficiencies and problem areas that affect the operational capability of the station, service to the users, or system quality and reliability.

B. Present significant problems to the appropriate levels of the command to allow implementation of timely corrective actions.

C. Provide technical assistance as required.

D. Ensure that deficiencies and problem areas have been properly resolved

1.4.3 Additional Performance Review/Inspections: Below is a list of Contractor performance areas that are subject to review by inspection teams. This list is subject to change and may not be all-inclusive.

A. Physical Security and Loss Prevention Program

B. Information Systems Security Program

C. Safety/Environmental Program

D. Information and Personnel Security

1.4.4 Contractor's Responsibility: The Contractor shall provide access to spaces, records and equipment in support of inspection teams. NCTAMS PAC DET PS will respond to inspection team findings and provide technical direction for correction of deficiencies. The Contractor shall be responsible for correcting deficiencies within the time limits that are within the scope of this PWS.

SECTION 2.0 ADMINISTRATIVE MATTERS

2.1 Security Program

2.1.1 General: All Contractor personnel shall have a minimum Secret clearance based on a NACLC per

DODINST 5220.22M and comply with the security guidance of the DD Form 254 in this Contract.

Proof of security clearance shall be provided prior to the Government granting unescorted access to

NCTAMS PAC DET PS spaces and at the start of the Contract phase-in period. A Security Plan shall be submitted to the COR NLT 15 calendar days after Contract start date and within 30 calendar days of any change. The Contractor shall provide security programs as follow and in accordance with the directives indicated.

A. The Contractor shall comply with all Navy and Federal Government security laws and established policies and procedures. Contractor shall follow procedures for security compromises that conform to Navy and Government procedures; this shall include reporting to the Security Manager of any security compromises IAW Technical Exhibits.

2.1.2 Physical Security: The Contractor shall ensure all new employees are provided a security briefing covering site access control procedures, key control, government property control, the introduction of prohibited items in restricted spaces, action to be taken in the event of emergency situations (bomb threat, fire), and antiterrorism and information systems security awareness.

A. NCTAMS PAC DET PS will provide continuous physical security for contractor assigned spaces. The Contractor shall abide by security instructions IAW the PWS and Technical

B. The Contractor shall comply with NCTAMS PAC DET PS and or Standard Operating

Procedures (SOPs) Instructions for Building access.

2.1.3 Visitor Control: The Contractor shall submit a visit request, for any visitor, to the COR, who will review and provide written approval to the Contractor on visit requests, written or verbal, prior to access to the facility. The Contractor shall ensure all visitors comply with regulations related to introduction or removal of classified material and unclassified property and information. The Contractor shall maintain a record of all visitors admitted inside the facility, and an appropriately cleared Contractor employee will at all times escort visitors not holding a minimum of SECRET security clearance. Visitors requiring access to the compound (grounds keepers, facilities maintenance workers, etc.) during normal

FPCON may be allowed unescorted access provided the visit has been authorized. During heightened

FPCONs, the Contractor shall follow applicable instructions, and SOPs that may require more stringent security requirements.