N0025323Q0113 Urgency Justification Generator Rewind Redacted - Copy.pdf
PDF 224 KB Posted
- Attached to
- Generator Rewind Service Federal contract opportunity
- Solicitation number
- N0025323Q0113
About this file
This document is a justification for urgency for a simplified acquisition under $250,000 by the Naval Sea Systems Command. The justification requests repair services for a generator rotor winding that failed, damaging the wiring in the stator assembly. The required delivery date for the repair services is unspecified. Failure to meet this date will result in continued inability to support ranging events for customers at Dabob Bay and in Canada, with over $1 million in lost revenue for the fiscal year from cancelled events. It will also prevent support for a scheduled day event in early 2023 and additional financial losses if the repair cannot be made promptly. The justification lists three potential sources for the repair services and describes the generator failure and need to return the system to operation for its missions through fiscal year 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0025323Q0113 Amendment 0002.pdf | ||
| N0025323Q0113 Amendment 0001.pdf | ||
| Solicitation N0025323Q0113.pdf | ||
| N0025323Q0113 CDRL A001 Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NUWC Keyport 4200_10 (10-2019)
JUSTIFICATION FOR URGENCY (SIMPLIFIED ACQUISITIONS FROM $10,000 TO $250,000.00)
1. The service or material listed on Procurement Requisition (PR) 1301114769 number PID# N00253-23-SIMACQ-KPT-21-0023 is urgent and advertising requirements are precluded for reasons indicated below. If the service/material is not received by the Required Delivery Date (RDD), specific damages to the Navy will result.
2. In the spaces below, provide the name of all known suppliers of the required product, preferably a minimum of three manufacturers.
(Although the purchasing office maintains a list of sources, it is best to provide sources you know meet your requirements so that valuable time is not wasted in soliciting and evaluating offers from companies who can't meet your needs. Attach a copy of any market research conducted on potential offerors). Suggested Source(s) (complete with addresses, phone and fax numbers) are as follows:
(a) Integrated Power Services (Cage Code: 4V2R2) Seattle Service Center 10831 E Marginal Way South Tukwila, WA 98168
(b) Beaver Electrical Machinery Ltd. (Cage Code L3022) 7440 Lowland Dr Burnaby, BC, V5J 5A4 Canada
(c) dahl-beck electric (Cage Code 0WA51) 2775 Goodrick Avenue Richmond, CA 94801-1109
3. Brief descriptive narrative of service or material required:
experienced a failure in the rotor winding. The lugged terminal cable broke free at the lug while rotating and caused damage to both its wiring and the wiring surrounding it in the stator assembly. Both now require an inspection and rewiring repair effort to get this back up and running to be able to accomplish its missions. Estimated costs include for labor and for materials for a total of .
4. Required Delivery Date (RDD)
5. Describe the resulting damages if the above required delivery date is not met. Explain why the service/material is needed and what will happen if it’s not received by the RDD. (As necessary, describe the impact on overhaul/availability schedules, impact to base support, personnel safety issues, potential environmental damages, etc.) The impact should be expressed as the daily cost (labor, material, etc.) to the government for each day of delay beyond the RDD.
Damages incurred to this system have left the craft incapable of transit to and ranging at and unreliable for ranging on .
To date, due to generator issues Keyport has realized at least ranging events that required cancelation due to inability to support their customers, both for Dabob and Canada events. It is currently projected that the is required to continue ranging until of FY24 before the engines can be replaced during the , so every day this repair is not accomplished is a loss in funding to Keyport.
Further and most importantly, we are not able to support a day event that was scheduled the beginning of .
This support was required as outline in our with , and further cancelations will have an echoing effect of lost faith and confidence for Keyport to reliably support their missions. This has caused to have to reschedule the event until spring, along with other Direct Customers being forced to push their requirements into the new Fiscal Year. Overall estimated loss of FY23 Range Service Cost Center revenue is over with additional financial loss excepted during FY24 start up if this correction cannot be made as soon as possible.
6. Lack of prior planning does not support urgency. Please provide a time-line beginning on the date the need was first identified and ending on the date the PR was submitted to the Contracts Department. Why is the claimed "urgency" not the result of a lack of advanced planning?