Amendment20Q00820002.pdf
PDF 149 KB Posted
- Attached to
- Tree Trimming Bangor Annex Federal contract opportunity
- Solicitation number
- N0025320Q0082
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0025320Q00820001TreeTrimmingFinal.pdf | ||
| AttachmentCDRL DD-1423 A001 Schedule.pdf | ||
| N00253-20-F-0082Final.pdf | ||
| WD 2015-5525 Rev 10.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er preproposal inquires from site w alk conducted on 25 Jun 2020 and update the proposal due date in block 8 of SF1449. See page 2 for summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0025320Q0082
X 9B. DATED (SEE ITEM 11)
02-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jul-2020
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: REBECCA JEX
REBECCA.JEX@NAVY.MIL
610 DOWELL STREET BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0025320Q0082
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
1. Answer pre-proposal questions from site walk conducted on 25 Jun2020 as follows:
Question 1: When working near power lines, line clearance certified arborists are normally required (ANSI 1910.269). Will they be required for this project?
Answer 1: Yes, line clearance certified arborists are required for this project.
Question 2: I did not see specific wages categories relevant to the proposal. Is there another wage list we can reference?
Answer 2: Since this is not part of a larger construction project, Davis Bacon Wage Determination does not apply which is more specific. This project falls under the Service Contract Act and wages are pulled by county for non-supervisory type positions and are not specific to the project.
Question 3: Can we park equipment overnight on site in or near the work area?
Answer 3: Yes, we can park equipment onsite overnight. This will be in a designated laydown area.
Question 4: Page 4 of 25 of SOW 3.5 Tree trimming. It states during the site walk that fir trees outside of the 15' clearance could be saved and not cut back to the clearance line entire height of tree. Yet the deciduous trees should be cut down if they end up unsightly or in an unhealthy condition. Should the fir trees be cut back and above the wires 15'?
N0025320Q0082
Answer 4: The Fir Trees located in the cut zone may remain when trimming them would leave behind an unhealthy condition for the tree. The deciduous trees do need to be cut back to the 15’ and 5’ distances described in the SOW if an unhealthy and unsightly condition remains the entire tree shall be removed.
2. Closing date is hereby extended from 7 July 2020 at 2:00PM Local Time to 15 Jul 2020 at 2:00PM Local Time.
The following have been deleted:
(End of Summary of Changes)
File details come from the government source that posted it. Updated .