N0025319Q0085.pdf
PDF 663 KB Posted
- Attached to
- IMU Assembly Federal contract opportunity
- Solicitation number
- N0025319Q0085
About this file
Request for Quote
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL_2.pdf | ||
| CDRL.pdf | ||
| 1300764322_inertial_measurement_unit_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL UNDERSEA WARFARE CENTER
RECEIVING OFFICER
ATTN: DIVISION KEYPORT SUPPLY OFFICER
BLDG 893
610 DOWELL STREET
KEYPORT WA 98345-7610
TEL: 360 396-2760 FAX:
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
DO-A5N0025319Q0085 12-Mar-2019
5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NO TE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
THIS RFQ [ ] IS X[ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
NAVAL UNDERSEA WARFARE CENTER
ATTN: JODI HULTQUIST
JODI.HULTQUIST@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
27-Mar-2019(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
360-315-3519JODI L HULTQUIST
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
N0025319Q0085
Section A - Solicitation/Contract Form
SOLICITATION NOTES
NOTE 1. Government Point of Contact for this Solicitation/Request for Quote (RFQ) is: Jodi Hultquist, Purchasing
Agent, Phone: 360-315-3519, Fax: 360-396-7036, Email: jodi.hultquist@navy.mil.
NOTE 2. All questions regarding this solicitation should be submitted in writing as soon as practicable after receipt of solicitation. Email questions to jodi.hultquist@navy.mil. Questions received after a reasonable time may not be entertained. (DO NOT include government drawings or government protected information in your reply emails unless they are digitally signed and encrypted per Federal Information Processing Standard
(FIPS) Publication140-2.)
NOTE 3. Firms interested in submitting quotes must (1) utilize the pages in this solicitation to complete the pricing providing unit prices and extended pricing, manufacturers and their part numbers, along with description changes (if any). Each Contract Line Item No. or “CLIN” must be filled out. (2) complete all representations and certifications found within this document and ensure your company’s registration in
SAM is current and active. https://www.sam.gov.
NOTE 4. Company quote forms may be provided but not substituted for a completed solicitation/amendment pages.
The government terms and conditions (T&C’s) listed in this solicitation are required by law through the
Federal Acquisition Regulations (FAR) and the Department of Defense FAR Supplement (DFAR). It is preferred that company T&C’s not be included with your quote submittal as many company T&C’s are inconsistent with federal law and unenforceable.
NOTE 5. Quote ONLY the requested quantities with the requested packaging. Quotes for quantities other than the amount requested will be considered non-responsive.
NOTE 6. If you cannot meet the requested delivery date, line through and replace with your availability. All line items must state the unit price and extended price. Quote quantities as stated in this RFQ.
NOTE 7. Offers shall be FOB Destination in accordance with FAR Clause 52.247-34.
NOTE 8. The government prefers submission of this RFQ by email or fax.
NOTE 9. The Constructive Acceptance Timeframe is 45 days after receipt of material.
NOTE 10. ARMS EXPORT CONTROL DRAWINGS
Restricted Drawings and Technical Information are only available by accessing Federal Business
Opportunities (FBO). Registration instructions and Vendor Guide books can be found on the FBO homepage https://www.fbo.gov.
Drawings referenced in this solicitation are restricted by the Arms Export Control Act and are ONLY available to vendors/contractors appointed Data Custodians that are registered with Defense Logistics
Information Service (DLIS) Joint Certification Program (JCP). Vendor’s/Contractor’s Data Custodian’s that are not registered with DLIS JCP can obtain registration information at www.dlis.dla.mil/jcp/ or by phone at 888-352-9333.
Drawings for this solicitation have been posted to the FBO website: https://www.fbo.gov. Bidders who have registered with FBO and have registered in DLIS JCP can access this data under solicitation number:
N0025319Q0085.
mailto:jodi.hultquist@navy.mil https://www.sam.gov/ https://www.fbo.gov/ http://www.dlis.dla.mil/jcp/ https://www.fbo.gov/
NOTE 11. Performance under this contract requires the contractor to adhere to Operations Security (OPSEC) requirements. Explanation of these requirements is detailed in Section I of the Operations Security Guide for Defense Contractors available online at:
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx; click on OPSEC
Guide For Defense Contractors.
NOTE 12. COMPLIANCE WITH SPECIFICATIONS
In order to ensure compliance with all the specification requirements, the contractor shall indicate in its offer and notify the Government in a cover letter, what specifications, if any, the offeror does not intend to meet. The offeror shall explain, in detail, how any proposed deviation/exception will nonetheless meet the
Government's functional requirements. Should descriptive literature be supplied by the offeror, it will be presumed that the offeror intends to meet all of the specifications, regardless of the descriptive literature, unless the offeror specifically notes its exceptions.
It shall be the obligation of the contractor to exercise due diligence to discover and to bring to the attention of the contracting officer at the earliest possible time, in writing, any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated by reference herein.
NOTE 13. Failure to provide all required information from this solicitation and any subsequent amendment(s) may deem your company to be considered non-responsive.
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 2 Each
INERTIAL MEASUREMENT UNIT-FIRST ARTICLE
FFP
Manufacture In Accordance With (IAW) the attached Statement of Work (SOW) and Drawing 8290314 Rev B and WS14736 Rev J2 Distro D.
Referenced drawing attached on FBO.gov. Interested vendors are required to have an active JCP certification to access & view referenced drawings.
This is a first article/pre-production requirement. The Government reserves the right to waive the first article requirement to proven source. Although, the first article requirement may be waived, pricing must be included for the first article.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 6605
NET AMT
0002 8 Each
INERTIAL MEASUREMENT UNIT-PRODUCTION LOT
FFP
Manufacture IAW the attached SOW and Drawing 8290314 Rev B and WS14736
Rev J2 Distro D.
Referenced drawing attached on FBO.gov. Interested vendors are required to have an active JCP certification to access & view referenced drawings.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0003 1 Lot
CONTRACT DATA REQUIREMENTS LIST (CDRL)
FFP
Data Delivery Items IAW CDRL A001
Contract Data Requirements List DD Form 1423-1
NOT TO BE SEPERATELY PRICED
0004 1 Lot
CONTRACT DATA REQUIREMENTS LIST (CDRL)
FFP
Data Delivery Items IAW CDRL A002
Contract Data Requirements List DD Form 1423-1
NOT TO BE SEPERATELY PRICED
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement Of Work
1. Inertial Measurement Unit Assembly (IMU) Preproduction Sample (CLIN 0001) and
Production Units (CLIN 0002) shall be manufactured, inspected, tested and delivered in accordance with 8290314 Rev B and all associated drawings, specifications, and revisions.
2. First Article/Preproduction, and Quality Conformance Testing shall be performed by the manufacturer to prove the requirement of drawing 8290314 Rev B, sheet 2, in accordance with NOTE 4 have been fulfilled.
3. Preproduction Test Reports (CLIN 0003) shall accompany the First
Articles/Preproduction Samples in accordance with CDRL A001. Quality Conformance
Test Reports (CLIN 0004) shall accompany all Production units in accordance with
CDRL A002.
4. Procuring Activity Test/Inspection/Acceptance Criteria:
a. NUWC Division Keyport retains the right to test and inspect both First Articles and Production units for compliance to the drawing 8290314 Rev B.
b. Allow 45 days for Testing/Inspection/Acceptance (as required) for both the First
Articles and the Production Lots.
5. Performance Requirements are as follows:
a. Meet all drawing requirements outlined in Drawing 8290314 Rev B, noting the associated requirements of NOTE 4.
b. Adhere to all requirements of this Statement of Work and drawing 8290314 Rev
B.
c. Quality Management processes shall be in compliance with ISO 9001 in accordance with FAR 52.246-11.
CLAUSES INCORPORATED BY REFERENCE
252.227-7037 Validation of Restrictive Markings on Technical Data SEP 2016
CLAUSES INCORPORATED BY FULL TEXT
HQ C-1-0001 ITEM(S) A001 and A0002 - DATA REQUIREMENTS (NAVSEA) (SEP 1992)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form
1423, Exhibit(s) A001 and A002, attached hereto.
(End of Text)
HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2015)
(a) Baseline Definition - For configuration control purposes, all contractual documentation in effect at the time of contract award shall constitute the Contract Baseline which shall be considered incorporated in the baseline documentation.
(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.
The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify baseline documents to resolve the conflict or to allow non-compliance.
Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer. Change documentation shall be submitted to the Contracting Officer in accordance with the Contract Data Requirements List
(CDRL), and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015 and MIL-HDBK-
61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The
Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.
(d) Non-Engineering Change Proposals (NECPs) – An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.
DI-SESS-80640D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document.
(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting
Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be incorporated in the contract modification that implements the change.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "DISPUTES" (FAR 52.233-1).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR
52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-SESS-80639D approved 7
April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clause shall also be submitted as part of the change request.
HQ C-2-0024 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The
Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the
Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
HQ C-2-0026 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (APR 2015)
(a) For the purpose of this contract, the "First Article" is synonymous with the terms "preproduction model(s) and
"preproduction equipment".
(b) The First Article shall conform in every respect to the requirements of this contract and shall be fully tested by the
Contractor to determine compliance with said requirements. The production equipment shall be manufactured with tools, material and methods that are the same as or representative of the tools, material and methods that were used to manufacture the First Article.
(c) Pursuant to paragraph (e) of the clause entitled "FIRST ARTICLE APPROVAL--CONTRACTOR TESTING"
(FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.*
* Optional paragraph which may be tailored.
HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (SEP 1990)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
(Offeror to fill in contract number(s), as applicable. See Section M)
Section D - Packaging and Marking
HQ D-1-0001 PACKAGING OF DATA
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial
Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 with Change 2 dated 18
May 2016.
HQ D-1-0002 PACKAGING OF SUPPLIES
Item(s) The supplies furnished hereunder shall be packaged in accordance with best commercial practice.
HQ D-2-0004 IDENTIFICATION MARKING OF PARTS (NAVSEA) (NOV 1996)
Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.
To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
HQ D-2-0006 MARKING AND PACKING LIST(S) (NAVSEA) (NOV 1996)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with best commercial practice.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.
Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped.
The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.
HQ D-2-0008 MARKING OF REPORTS (NAVSEA) (SEP 1990)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) contract dollar amount
(4) whether the contract was competitively or non-competitively awarded
(5) sponsor: AS DETAILED IN THE ATTACHED CDRL
(Name of Individual Sponsor)
NUWC KEYPORT
(Name of Requiring Activity)
KEYPORT WA
(City and State)
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001-2008 or equivalent.
If proposing an equivalent, provide documentation that demonstrates an equivalent quality assurance program.
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)
(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source.
In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of
Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.
(b) The Contractor's signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the
DD Form 250) is performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment.
(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.
(d) The certificate shall read as follows:
"I certify that on ______ [insert date], the ____ [insert Contractor's name] furnished the supplies or services called for by Contract No._____ via ____ [Carrier] on ________[identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document."
Date of Execution: _______________________________
Signature: ______________________________________
Title: __________________________________________
C.102 ACCEPTANCE INSPECTION
Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4-
2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.
Constructive Acceptance Timeframe for this procurement is 45 days after receipt of material.
HQ E-1-0001 INSPECTION AND ACCEPTANCE OF DATA
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form
1423.
HQ E-1-0003 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES
Item(s) 0001 and 0002 - Inspection and acceptance shall be made at destination by a representative of the
Government.
HQ E-2-0003 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (APR 2015)
Calibration System Requirements. The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of ANSI/NCSL Z540.3-2006.
HQ E-2-0004 COST OF QUALITY DATA (NAVSEA) (MAY 1995)
Cost of Quality Data: The contractor shall maintain and use quality cost data as a management element of the quality program. The specific quality cost data to be maintained and used will be determined by the contractor.
These data shall, on request, be identified and made available for "on site" review by the Government representative.
HQ E-2-0008 INSPECTION AND TEST RECORDS (NAVSEA) (MAY 1995)
Inspection and Test Records: Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness.
HQ E-2-0015 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (APR 2017)
Quality Management System Requirements. The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ANSI/ISO/ASQ 9001-2015 Quality Management Systems and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The
Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall require of subcontractors a quality management system achieving control of the quality of the services and/or supplies provided. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
HQ E-2-0017 USE OF CONTRACTOR'S INSPECTION EQUIPMENT (NAVSEA) (MAY 1995)
Use of Contractor's Inspection Equipment: The contractor's gages, and measuring and testing devices shall be made available for use by the Government when required to determine conformance with contract requirements. If conditions warrant, the contractor's personnel shall be made available for operations of such devices and for verification of their accuracy and condition.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 12 wks. ADC 2 NAVAL UNDERSEA WARFARE CENTER
RECEIVING OFFICER
ATTN: DIVISION KEYPORT SUPPLY
OFFICER
BLDG 893
610 DOWELL STREET
KEYPORT WA 98345-7610
360 396-2760
N00253
0002 12 wks. AFATA 8 (SAME AS PREVIOUS LOCATION)
0003 12 wks. ADC 1 (SAME AS PREVIOUS LOCATION)
0004 12 wks. AFATA 1 (SAME AS PREVIOUS LOCATION)
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
HQ F-2-0004 F.O.B. DESTINATION (NAVSEA) (APR 2015)
All supplies hereunder shall be delivered with all transportation charges prepaid, in accordance with the clause hereof entitled "F.O.B. DESTINATION" (FAR 52.247-34) in accordance with the delivery instructions specified herein.
The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant
Contract Administration Office.
Except when the Material Inspection and Receiving Report (MIRR) (DD 250) is used as an invoice, the Contractor shall enter unit prices on all MIRR copies. Contract line items shall be priced using actual prices, or if not available, estimated prices. When the price is estimated, an "E" shall be entered after the price.
All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the
Contract Data Requirements List(s), DD Form 1423.
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of
Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-
7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items— https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting
Officer.
Document Type: COMBO
Inspection Location: DESTINATION
Acceptance Location: DESTINATION
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the
Contracting Officer.
Document Type: COMBO
Inspection Location: DESTINATION
Acceptance Location: DESTINATION
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62839
Issue By DoDAAC N00253
Admin DoDAAC** N00253
Inspect By DoDAAC ____
Ship To Code N00253
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition
Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
Receiptcontrol.nuwckpt.fct@navy.mil
For WAWF Invoicing questions, contact:
Keyport Vendor Pay Group at (360) 315-8500 or at vendorpay.nuwckpt.fct@navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT
OFFICE (NAVSEA) (JUN 2018)
(a) The following table of payment office allocation methods applies to the extent indicated.
mailto:Receiptcontrol.nuwckpt.fct@navy.mil mailto:vendorpay.nuwckpt.fct@navy.mil
For Government Use Only
Contract/Order Payment
Clause
Type of Payment
Request
S u p p ly
S er v ic e
C o n st ru ct io n
Payment Office
Allocation Method
52.212-4 (Alt I), Contract
Terms and Conditions—
Commercial Items
52.216-7, Allowable Cost and Payment
52.232-7, Payments under
Time-and-Materials and
Labor-Hour Contracts
Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each
ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-1, Payments Navy
Shipbuilding
Invoice (Fixed
Price)
X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-1, Payments;
52.232-2, Payments under
Fixed-Price Research and
Development Contracts;
52.232-3, Payments under
Personal Services Contracts;
52.232-4, Payments under
Transportation Contracts and
Transportation-Related
Services Contracts; and
52.232-6, Payments under
Communication Service
Contracts with Common
Carriers
Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each
ACRN on the deliverable line or deliverable subline item for which payment is requested.
Contract/Order Payment
Clause
Type of Payment
Request
S u p p ly
S er v ic e
C o n st ru ct io n
Payment Office
Allocation Method
52.232-5, Payments Under
Fixed-Price Construction
Contracts
Construction
Payment Invoice
N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress
Payments
Progress
Payment*
X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR
32.501-3.
52.232-29, Terms for
Financing of Purchases of
Commercial Items;
52.232-30, Installment
Payments for Commercial
Items
Commercial Item
Financing*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and
32.1007(b)(2).
52.232-32, Performance-
Based Payments
Performance-
Based Payments*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and
32.1007(b)(2).
252.232-7002, Progress
Payments for Foreign
Military Sales Acquisitions
Progress
Payment*
X X N/A Allocate costs among line items and countries in a manner acceptable to the
Administrative Contracting Officer.
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).
This entire contract is fixed price.
(End of text)
HQ G-2-0002 CONTRACT ADMINISTRATION DATA
Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.
HQ G-2-0004 PURCHASING OFFICE REPRESENTATIVE
CONTRACTING OFFICER: Jennifer Calkins
REPRESENTATIVE Attn: Jodi Hultquist jodi.hultquist@navy.mil
Telephone: 360-315-3519
PURCHASING OFFICE Naval Undersea Warfare Center
Bldg. 206, 1st Floor, Room 103
610 Dowell Street, Code 023
Keyport, WA 98345-7610
HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (APR 2015)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide
Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data
Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.
Section H - Special Contract Requirements
5252.202-9101 ADDITIONAL DEFINITIONS (MAY 1993)
As used throughout this contract, the following terms shall have the meanings set forth below:
(a) DEPARTMENT - means the Department of the Navy.
(b) REFERENCES TO THE FEDERAL ACQUISITION REGULATION (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(c) REFERENCES TO ARMED SERVICES PROCUREMENT REGULATION OR DEFENSE ACQUISITION
REGULATION - All references in this document to either the Armed Services Procurement Regulation (ASPR) or the Defense Acquisition Regulation (DAR) shall be deemed to be references to the appropriate sections of the
FAR/DFARS.
(d) NATIONAL STOCK NUMBERS - Whenever the term Federal Item Identification Number and its acronym
FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number
(NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item
Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four position Federal Supply Class (FSC) plus the applicable nine position NIIN assigned to the item of supply.
C.106 QUALIFIED U.S. CONTRACTORS FOR EXPORT-CONTROLLED TECHNICAL DATA
(a) By Department of Defense (DOD) Directive 5230.25 (hereinafter referred to as “the Directive”), a program was established to allow Qualified U.S. Contractors to obtain export-controlled technical data under certain conditions. A "Qualified U.S. Contractor" is a private individual or enterprise (hereinafter described as a "U.S.
Contractor") that, in accordance with procedures established by the Under Secretary of Defense for Research and Engineering, certifies, as a condition of obtaining export-controlled technical data subject to the Directive from the Department of Defense, that:
(1) The individual who will act as recipient of the export-controlled technical data on behalf of the U.S.
Contractor is a U.S. citizen or a person admitted lawfully into the United States for permanent residence and is located in the United States;
(2) Such data are needed to bid or perform on a contract with the Department of Defense, or other U.S.
Government agency, or for other legitimate business purposes in which the U.S. Contractor is engaged, or plans to engage. The purpose for which the data are needed shall be described sufficiently in such certification to permit an evaluation of whether subsequent requests for data are related properly to such business purpose.
(3) The U.S. Contractor acknowledges its responsibilities under U.S. export control laws and regulations
(including the obligation, under certain circumstances, to obtain an export license prior to the release of technical data within the United States) and agrees that it will not disseminate any export-controlled technical data subject to the Directive in a manner that would violate applicable export control laws and regulations.
(4) The U.S. Contractor also agrees that, unless dissemination is permitted by the Directive, it will not provide access to export-controlled technical data subject to the Directive to persons other than its employees or persons acting on its behalf, without the permission of the DOD component that provided the technical data.
(5) To the best of its knowledge and belief, the U.S. Contractor knows of no person employed by it, or acting on its behalf, who will have access to such data, who is debarred, suspended or otherwise ineligible to perform under U.S. Government contracts; or has violated U.S. export control laws or a certification previously made to the Department of Defense under the provisions of the Directive.
(b) Private individuals or enterprises are certified as Qualified U.S. Contractors by submitting a DD Form 2345 to
U.S./Canada Joint Certification Office, Defense Logistics Information Services, Federal Center, 74 Washington
Avenue, North, Battle Creek, MI 49017-3084.
(c) Canadian contractors may be qualified in accordance with the Directive for technical data that do not require a license for export to Canada under section 125.12 of the International Traffic in Arms Regulations and sections
379.4(d) and 379.5(e) of the Export Administration Regulations, by submitting an equivalent certification to the
DLSC.
C. 107 INSTRUCTIONS FOR OBTAINING EXPORT-CONTROLLED TECHNICAL DATA
An offeror may not receive export-controlled technical data, which are specified in this solicitation, unless it is a qualified U.S. contractor as defined in clause C.106. See clause C.106 for instructions on becoming a qualified U.S.
contractor. Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification
Office, Defense Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084; or telephone (616) 961-4358, toll free (800) 352-3572; or email jcp-admin@dlis.dla.mil.
If a contractor is requesting qualification, they must submit the request to DLIS within 3 days after the solicitation issue date with an email to jodi.hultquist@navy.mil stating they have requested qualification. If it is determined necessary (and if time permits), an additional 7 days will be added to the closing date if any requests are received.
An amendment to this effect will be issued, and if not issued, offerors shall assume no requests were received and the original closing date applies.
If an offeror is a qualified U.S. contractor and needs a copy of the restricted technical data, its appointed Data
Custodian must be registered with DLIS (Defense Logistics Info Svc Joint Certification Program (JCP).
Registration instructions and Vendor Guide book can be found on the FedBizOpps homepage https://www.fbo.gov.
mailto:jcp-admin@dlis.dla.mil https://www.fbo.gov/
C.116 CONSTRUCTIVE ACCEPTANCE (NON-COMMERCIAL)
In accordance with FAR 32.904(b)(1)(ii)(B)(4), the Contracting Officer has determined that more than seven days are needed for constructive acceptance. The following number of days for constructive acceptance applies to paragraph (a)(5)(i) of FAR Clause 52.232-25 “Prompt Payment” which is incorporated by reference: 45 days for constructive acceptance.
Section I - Contract Clauses
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-7 System for Award Management OCT 2018
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2018
52.204-13 System for Award Management Maintenance OCT 2018
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other
Covered Entities.
JUL 2018
52.209-10 Prohibition…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.