N00253-16-T-0165.pdf

PDF 579 KB Posted

Attached to
Power Supply Federal contract opportunity
Solicitation number
N00253-16-T-0165
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Power Supply

View the file

Other files for this federal contract opportunity

Other files attached to Power Supply, newest first.
File Type Posted
N00253-16-T-0165_A0002.pdf PDF
N00253-16-T-0165_A0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL UNDERSEA WARFARE CENTER

RECEIVING OFFICER

ATTN: DIVISION KEYPORT SUPPLY OFFICER

BLDG 893

610 DOWELL STREET

KEYPORT WA 98345-7610

TEL: 360 396-2760 FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

DO-C9N00253-16-T-0165 11-Mar-2016

5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NO TE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA

FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

NAVAL UNDERSEA WARFARE CENTER

ATTN: MURRAY LANCASTER

MURRAY.LANCASTER@NAVY.MIL

610 DOWELL ST, BLDG 206

KEYPORT WA 98345

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

21-Mar-2016(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

360-315-6740MURRAY K LANCASTER II

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

N00253-16-T-0165

Section SF 30 - BLOCK 14 CONTINUATION PAGE

NOTES TO VENDOR

NOTES TO VENDOR

NOTE 1: Government Point of Contact for this Solicitation / Request for Quote (RFQ) is: Murray Lancaster, Purchasing Agent, Phone: 360-315-6740, Fax: 360-396-5657

Email: murray.lancaster@navy.mil

NOTE 2: All questions regarding this solicitation should be submitted in writing as soon as practicable after receipt of solicitation. Email questions to murray.lancaster@navy.mil. Questions received after a reasonable time may not be entertained. (DO NOT include government drawings or government protected information in your reply emails unless they are digitally signed and encrypted per Federal Information Processing Standard (FIPS) Publication140-

2.)

NOTE 3: Utilize the pages in this solicitation to list all unit prices, extended prices, manufacturers and their part numbers, along with description changes (if any). Each Item No. or “CLIN” must be filled out. Company quote forms may be used, but not substituted for a completed solicitation / amendment pages.

NOTE 4: If you cannot meet the requested delivery date / Period of Performance (POP), line through and replace with your availability. All line items must state the unit price and extended price. Quote quantities as stated in this

RFQ.

NOTE 5: Military Specification (MILSPEC) can be accessed on line at: http://assist.daps.dla.mil and offer electronic copies.

NOTE 6: Offers shall be FOB Destination pricing to Keyport, WA. 98345. If your pricing does not include shipping and you want to quote FOB Origin, you must state so by providing the city/state you will be shipping from, along with the estimated weight and cost of the shipment.

NOTE 7: You must supply Manufacturers information as requested in provision C.108. Supply city/state if in the

United States and/or the country of origin if outside the United States.

NOTE 8 Due to the size of this RFQ the government prefers that submission be electronically by email or fax.

NOTE 9: Failure to provide all required information from this solicitation and any subsequent amendment(s) may deem your company to be considered non-responsive.

mailto:murray.lancaster@navy.mil http://assist.daps.dla.mil/

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 2 Each

POWER SUPPLY-FIRST ARTICLE

FFP

Manufacturer: KEPCO

Part number: 27402, or equivalent IAW specifications and dimensions provided in

Attachment A (Specifications for New Power Supply), and Attachment B

(Dimensions for New Power Supply), must be met

Vendor to place temporary marking tag on the first article, identifying the item as such

Power assemblies must be packaged with ESD protective packaging IAW MIL-

STD-1686.

Package must be marked with Manufacturer Cage Code, P/N, and Contract

Number.

Vendor must provide a Certificate of Conformance.

Inspection to be completed IAW Combat Systems Performance Acceptance Test

70677905 checklist

Please see attached Statement of Work for additional requirements.

Brand name or equal

FOB: Destination

NET AMT

0002 38 Each

POWER SUPPLY-PRODUCTION LOT

FFP

Manufacturer: KEPCO

Part number: 27402, or equivalent IAW specifications and dimensions provided in

Attachment A (Specifications for New Power Supply), and Attachment B

(Dimensions for New Power Supply), must be met

Power assemblies must be packaged with ESD protective packaging IAW MIL-

STD-1686.

Package must be marked with Manufacturer Cage Code, P/N, and Contract

Number.

Inspection to be completed IAW Combat Systems Performance Acceptance Test

70677905 checklist

Please see attached Statement of Work for additional requirements.

0003 15 Each

OPTION POWER SUPPLY-OPTION 1

FFP

Manufacturer: KEPCO

P/N: 27402

Option to support CLIN 0002. This is a Not-To-Exceed amount to provide up to an additional 15 ea, if required. At the time it is exercised, the Government shall identity the exact amount required at time of option exercise.

This is an Option Item only and in no way are purchased or guaranteed under the resulting contract. Work cannot be started or performed under the Option Item without Option Exercise by the Contracting Officer. Options will be individually exercised in accordance with FAR Clause 52.217-7.

0004 15 Each

OPTION POWER SUPPLY-OPTION 2

FFP

Manufacturer: KEPCO

P/N: 27402

Option to support CLIN 0002. This is a Not-To-Exceed amount to provide up to an additional 15 ea, if required. At the time it is exercised, the Government shall identity the exact amount required at time of option exercise.

This is an Option Item only and in no way are purchased or guaranteed under the resulting contract. Work cannot be started or performed under the Option Item without Option Exercise by the Contracting Officer. Options will be individually exercised in accordance with FAR Clause 52.217-7.

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)

This entire contract is fixed price.

(End of Text)

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

Manufacturer: KEPCO

Part number: 27402, or equivalent IAW specifications and dimensions provided in Attachment A (Specifications for

New Power Supply), and Attachment B (Dimensions for New Power Supply), must be met

The Following notes apply:

Part must meet all minimum & maximum requirements provided in attachment A.

Dimensions and bolt pattern must meet all dimensional requirements provided in attachment B.

Vendor must provide units to provided specifications and dimensions in attachments A and B.

All requests for variance must be submitted to NUWC Division Keyport.

Material will be subject to testing at NUWC Division Keyport to ensure material meets the noise/ripple at full load requirements IAW specifications listed Attachment A.

Power assemblies must be packaged with ESD protective packaging IAW MIL-STD-1686.

Package must be marked with Manufacturer Cage Code, P/N, and Contract Number.

- Environment specifications IAW:

- MIL-S-901 rev. D, 17 Mar 1989

- MIL-STD-461 rev F, 10 Dec 2007

- CE101, CE102, CS106, CS114, RE101 & RE012

- MIL-STD-167-1A, 02 Nov 2004

- MIL-STD-810 rev G, Ch 1, 15 Apr 2014

Vendor to place temporary marking tag on the first article, identifying the item as such

Inspection to be completed IAW Combat Systems Performance Acceptance Test 70677905 checklist

Allow 45 days for inspection and acceptance.

Material must be delivered to Bldg. 489 Fir Wing for Acceptance Testing

HQ C-2-0027 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (SEP 1990)

(a) For the purpose of this contract, the "First Article" is synonymous with the terms "preproduction model(s)" and

"preproduction equipment".

(b) The production equipment shall be manufactured with tools, materials and methods which are the same as, or representative of the tools, material and methods which were used to manufacture the First Article. The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "FIRST

ARTICLE APPROVAL--GOVERNMENT TESTING" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements and it has been preliminarily accepted by the Contract

Administration Office. The Contractor shall make a record of all data obtained during such tests in such form as is consonant with good engineering practice and furnish five (5) copies thereof. The cover sheet of each copy of this record shall be marked with this contract number and the item identification. One (1) copy shall be furnished to the Contract

Administration Office at the time of inspection for preliminary acceptance, one (1) copy shall accompany the First

Article on delivery thereof, and three (3) copies shall be furnished to the Naval Sea Systems Command at the time of

First Article delivery.

(c) Pursuant to paragraph (e) of the clause entitled "FIRST ARTICLE APPROVAL--GOVERNMENT TESTING", the

First Article shall not be delivered as part of the production quantity.*

* Optional paragraph which may be tailored.

Section D - Packaging and Marking

HQ D-2-0004 IDENTIFICATION MARKING OF PARTS (NAVSEA) (NOV 1996)

Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.

To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

HQ D-2-0006 MARKING AND PACKING LIST(S) (NAVSEA) (NOV 1996)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with best commercial practice.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped.

The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

[ISO 9001-2008]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)

(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source.

In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of

Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) The Contractor's signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the

DD Form 250) is performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment.

(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.

(d) The certificate shall read as follows:

"I certify that on ______ [insert date], the ____ [insert Contractor's name] furnished the supplies or services called for by Contract No._____ via ____ [Carrier] on ________[identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document."

Date of Execution: _______________________________

Signature: ______________________________________

Title: __________________________________________

C.102 ACCEPTANCE INSPECTION

Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4-

2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.

Constructive Acceptance Timeframe for this procurement is 45 days after receipt of material.

HQ E-2-0003 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (APR 2015)

Calibration System Requirements. The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of ANSI/NCSL Z540.3-2006.

HQ E-2-0004 COST OF QUALITY DATA (NAVSEA) (MAY 1995)

Cost of Quality Data: The contractor shall maintain and use quality cost data as a management element of the quality program. The specific quality cost data to be maintained and used will be determined by the contractor.

These data shall, on request, be identified and made available for "on site" review by the Government representative.

HQ E-2-0008 INSPECTION AND TEST RECORDS (NAVSEA) (MAY 1995)

Inspection and Test Records: Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness.

HQ E-2-0014 QUALITY IN SOFTWARE DEVELOPMENT AND PRODUCTION (NAVSEA) (MAY

1995)

Quality in Software Development and Production: The contractor's software quality program shall be an integral part of the overall Quality Assurance Program. Software quality program controls shall be applicable to all project software that is developed, maintained, or modified within the following categories:

(a) All deliverable software

(b) All deliverable software that is included as part of deliverable hardware or firmware.

(c) Non deliverable software (commercially available or user-developed) used for development, fabrication, testing, or acceptance of deliverable software or hardware (includes automated fabrication, test, and inspection/acceptance equipment software and software design, test, and inspection tools).

(d) Commercially available, reusable, or Government software designated as part of a deliverable item.

HQ E-2-0015 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (SEP 2009)

Quality Management System Requirements. The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ANSI/ISO/ASQ 9001-2008 Quality Management Systems and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The

Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall require of subcontractors a quality management system achieving control of the quality of the services and/or supplies provided. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

HQ E-2-0017 USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (MAY 1995)

Use of Contractor’s Inspection Equipment: The contractor's gages, and measuring and testing devices shall be made available for use by the Government when required to determine conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operations of such devices and for verification of their accuracy and condition.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

0001 28-JUL-2016 2 NAVAL UNDERSEA WARFARE CENTER

RECEIVING OFFICER

ATTN: DIVISION KEYPORT SUPPLY

OFFICER

BLDG 893

610 DOWELL STREET

KEYPORT WA 98345-7610

360 396-2760

N00253

0002 14 wks. AFATA 38 (SAME AS PREVIOUS LOCATION)

N00253

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.242-15 Stop-Work Order AUG 1989

52.242-17 Government Delay Of Work APR 1984

52.247-34 F.O.B. Destination NOV 1991

HQ F-2-0004 F.O.B. DESTINATION (NAVSEA) (APR 2015)

All supplies hereunder shall be delivered with all transportation charges prepaid, in accordance with the clause hereof entitled "F.O.B. DESTINATION" (FAR 52.247-34) in accordance with the delivery instructions specified herein.

The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant

Contract Administration Office.

Except when the Material Inspection and Receiving Report (MIRR) (DD 250) is used as an invoice, the Contractor shall enter unit prices on all MIRR copies. Contract line items shall be priced using actual prices, or if not available, estimated prices. When the price is estimated, an "E" shall be entered after the price.

All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the

Contract Data Requirements List(s), DD Form 1423.

Section G - Contract Administration Data

252.204-0001 Line Item Specific: Single Funding SEP 2009

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and

“Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in

WAWF, as specified by the contracting officer.

INSPECTION (DESTINATION) / ACCEPTANCE (DESTINATION)

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N62839

Issue By DoDAAC N00253

Admin DoDAAC N00253

Inspect By DoDAAC ____

Ship To Code N00253

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send

Additional Email Notifications” field of WAWF once a document is submitted in the system.

receiptcontrol.nuwckpt.fct@navy.mil

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(1) Keyport Vendor Pay Group: (360) 315-8500 or vendorpay.nuwckpt.fct@navy.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

HQ G-2-0002 CONTRACT ADMINISTRATION DATA

Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.

HQ G-2-0004 PURCHASING OFFICE REPRESENTATIVE

PURCHASING OFFICE NAVAL UNDERSEA WARFARE CENTER

REPRESENTATIVE: ATTN: MURRAY LANCASTER

MURRAY.LANCASTER@NAVY.MIL

610 DOWELL ST, BLDG 206

KEYPORT WA 98345

HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (APR 2015)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide

Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data

Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.

Section H - Special Contract Requirements

5252.202-9101 ADDITIONAL DEFINITIONS (MAY 1993)

As used throughout this contract, the following terms shall have the meanings set forth below:

(a) DEPARTMENT - means the Department of the Navy.

(b) REFERENCES TO THE FEDERAL ACQUISITION REGULATION (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(c) REFERENCES TO ARMED SERVICES PROCUREMENT REGULATION OR DEFENSE ACQUISITION

REGULATION - All references in this document to either the Armed Services Procurement Regulation (ASPR) or the Defense Acquisition Regulation (DAR) shall be deemed to be references to the appropriate sections of the

FAR/DFARS.

(d) NATIONAL STOCK NUMBERS - Whenever the term Federal Item Identification Number and its acronym

FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number

(NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item

Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four position Federal Supply Class (FSC) plus the applicable nine position NIIN assigned to the item of supply.

C.106 QUALIFIED U.S. CONTRACTORS FOR EXPORT-CONTROLLED TECHNICAL DATA

(a) By Department of Defense (DOD) Directive 5230.25 (hereinafter referred to as “the Directive”), a program was established to allow Qualified U.S. Contractors to obtain export-controlled technical data under certain conditions. A "Qualified U.S. Contractor" is a private individual or enterprise (hereinafter described as a "U.S.

Contractor") that, in accordance with procedures established by the Under Secretary of Defense for Research and Engineering, certifies, as a condition of obtaining export-controlled technical data subject to the Directive from the Department of Defense, that:

(1) The individual who will act as recipient of the export-controlled technical data on behalf of the U.S.

Contractor is a U.S. citizen or a person admitted lawfully into the United States for permanent residence and is located in the United States;

(2) Such data are needed to bid or perform on a contract with the Department of Defense, or other U.S.

Government agency, or for other legitimate business purposes in which the U.S. Contractor is engaged, or plans to engage. The purpose for which the data are needed shall be described sufficiently in such certification to permit an evaluation of whether subsequent requests for data are related properly to such business purpose.

(3) The U.S. Contractor acknowledges its responsibilities under U.S. export control laws and regulations

(including the obligation, under certain circumstances, to obtain an export license prior to the release of technical data within the United States) and agrees that it will not disseminate any export-controlled technical data subject to the Directive in a manner that would violate applicable export control laws and regulations.

(4) The U.S. Contractor also agrees that, unless dissemination is permitted by the Directive, it will not provide access to export-controlled technical data subject to the Directive to persons other than its employees or persons acting on its behalf, without the permission of the DOD component that provided the technical data.

(5) To the best of its knowledge and belief, the U.S. Contractor knows of no person employed by it, or acting on its behalf, who will have access to such data, who is debarred, suspended or otherwise ineligible to perform under U.S. Government contracts; or has violated U.S. export control laws or a certification previously made to the Department of Defense under the provisions of the Directive.

(b) Private individuals or enterprises are certified as Qualified U.S. Contractors by submitting a DD Form 2345 to

U.S./Canada Joint Certification Office, Defense Logistics Information Services, Federal Center, 74 Washington

Avenue, North, Battle Creek, MI 49017-3084.

(c) Canadian contractors may be qualified in accordance with the Directive for technical data that do not require a license for export to Canada under section 125.12 of the International Traffic in Arms Regulations and sections

379.4(d) and 379.5(e) of the Export Administration Regulations, by submitting an equivalent certification to the

DLSC.

C. 107 INSTRUCTIONS FOR OBTAINING EXPORT-CONTROLLED TECHNICAL DATA

An offeror may not receive export-controlled technical data, which are specified in this solicitation, unless it is a qualified U.S. contractor as defined in clause C.106. See clause C.106 for instructions on becoming a qualified U.S.

contractor. Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification

Office, Defense Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084; or telephone (616) 961-4358, toll free (800) 352-3572; or email jcp-admin@dlis.dla.mil.

If a contractor is requesting qualification, they must submit the request to DLIS within 2 days after the solicitation issue date with an email to murray.lancaster@navy.mil stating they have requested qualification. If it is determined necessary (and if time permits), an additional 2 days will be added to the closing date if any requests are received.

An amendment to this effect will be issued, and if not issued, offerors shall assume no requests were received and the original closing date applies.

If an offeror is a qualified U.S. contractor and needs a copy of the restricted technical data, its appointed Data

Custodian must be registered with DLIS (Defense Logistics Info Svc Joint Certification Program (JCP).

Registration instructions and Vendor Guide book can be found on the FedBizOpps homepage https://www.fbo.gov.

C.116 CONSTRUCTIVE ACCEPTANCE (NON-COMMERCIAL)

In accordance with FAR 32.904(b)(1)(ii)(B)(4), the Contracting Officer has determined that more than seven days are needed for constructive acceptance. The following number of days for constructive acceptance applies to paragraph (a)(5)(i) of FAR Clause 52.232-25 “Prompt Payment” which is incorporated by reference: 45 days for constructive acceptance.

mailto:jcp-admin@dlis.dla.mil https://www.fbo.gov/

C.121 CONTROLLED UNCLASSIFIED INFORMATION (INCLUDES FOR OFFICIAL USE ONLY

INFORMATION)

Ref: (a) DoD Regulation 5200.01, DoD Information Security Program

(b) SECNAV M-5510.36, DON Information Security Program Manual

Contractor may be required to handle Controlled Unclassified Information (CUI). There are numerous types of

CUI, e.g. documents with limited distribution statements, documents marked as For Official Use Only (FOUO), etc.

The minimum level of protection for all CUI is adherence to FOUO protection standards. Distribution Statements

(DS) and warning labels, such as the Arms Export Control Act Warning, identify additional protection requirements for a given document. Minimum FOUO protection requirements/controls applicable to the performance of this contract for CUI are listed below. Additional protection requirements, as marked on a given CUI document, are in addition to the standards listed.

1. Handling/Storage: Access to FOUO is limited to those needing it to conduct official business for the Department of Defense (DoD). FOUO information is not classified information, but requires extra precautions to ensure it is not released to the public. During business hours, reasonable steps shall be taken to minimize risk of access by unauthorized personnel. After business hours, FOUO information shall be stored in unlocked containers, desks, or cabinets if Government or Government-contracted building security is provided. If it is not, store in locked desks, file cabinets, bookcases, locked rooms, or similar items.

2. Transportinq/Transmitting/Release/Destruction: FOUO information shall be transported in a manner that prevents disclosure of the contents. FOUO information may be sent via USPS first-class mail, parcel post, or - for bulk shipments – 4 th class mail. Electronic transmission of FOUO information (voice, data, or facsimile) shall be by approved secure communications systems. Transmission via unsecure fax is acceptable if an authorized person is standing by on the receiving end to take custody. All emails containing FOUO or attachments with FOUO must be digitally signed and encrypted when transmitted within a Navy network or to an approved contractor email address.

Transmission of FOUO (i.e. any CUI) to personal email accounts (e.g. AOL, Yahoo, Hotmail, Comcast, etc.) is strictly prohibited. FOUO sent out of the contractor's facility electronically must be encrypted (DoD FIPS 140-2 standard). FOUO material shall not be released outside the contractor's facility except to representatives of DoD.

When no longer needed, destroy FOUO by a method that precludes its disclosure to unauthorized individuals.

3. Markings: Unclassified documents (paper or electronic) generated in support of this contract which contain

FOUO are to be marked "For Official Use Only'' at the bottom on the outside of the front cover (if any), on each page containing FOUO information, and on the outside of the back cover (if any). Each paragraph containing

FOUO information shall be marked as such. Within a classified document, an individual page with both FOUO and classified information shall be marked at the top and bottom with the highest security classification of information appearing on the page. Individual paragraphs shall be marked at the appropriate classification level, as well as unclassified or FOUO, as appropriate. Within a classified document, an individual page that contains FOUO information but no classified information shall be marked "For Official Use Only'' at the top and bottom of the page, as well as each paragraph that contains FOUO information. Other records, such as photographs, films, tapes, or slides, shall be marked "For Official Use Only'' or "FOUO" in a manner that ensures that a recipient or viewer is aware of the status of the information therein. DS on technical documents identify access restrictions. DS "B" through "D" preclude public release and while not marked as FOUO, are subject to all FOUO protection requirements, including the prohibition on unencrypted transmission over the public Internet.

Section I - Contract Clauses

52.204-2 Security Requirements AUG 1996

52.204-7 System for Award Management JUL 2013

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2015

52.204-13 System for Award Management Maintenance JUL 2013

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.211-5 Material Requirements AUG 2000

52.211-15 Defense Priority And Allocation Requirements APR 2008

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000

MAY 2014

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-20 Prohibition on Conducting Restricted Business Operations in

Sudan--Certification

AUG 2009

52.232-23 Assignment Of Claims MAY 2014

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.243-1 Changes--Fixed Price AUG 1987

52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-8 Default (Fixed-Price Supply & Service) APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A System for Award Management Alternate A FEB 2014

252.204-7005 Oral Attestation of Security Responsibilities NOV 2001

252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

DEC 2015

252.204-7009 Limitations on the Use or Disclosure of Third-Party

Contractor Reported Cyber Incident Information

DEC 2015

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

DEC 2015

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014

252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.225-7048 Export-Controlled Items JUN 2013

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.244-7000 Subcontracts for Commercial Items JUN 2013

252.247-7023 Transportation of Supplies by Sea APR 2014

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(Contracting Officer shall insert details)

(a) The Contractor shall deliver 2 EA unit(s) of Lot/Item CLIN 1 by 28 July, 2016 to the Government at NUWC

Keyport, WA 98345 for first article tests. The shipping documentation shall contain this contract number and the

Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 45 calendar days after the Government receives the first article, the Contracting Officer shall notify the

Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The

Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The

Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor--

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting

Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (FEB 2016).

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are ncorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

(ii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(iii) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).

(iv) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(v) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(vi) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JUL 2013).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).

(vii) 52.233-1, Disputes (MAY 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (DEC 2015).

(ix) 52.253-1, Computer Generated Forms (JAN 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282)

(31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).

(ii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2016) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold).

(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014) (41

U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin

Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).

(v) 52.222-36, Equal Employment for Workers with Disabilities (JUL 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the

United States). (For purposes of this clause, ``United States'' includes the 50 States, the District of Columbia, Puerto

Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vi) 52.222-37, Employment Reports on Veterans (Oct 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).

(vii) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United

States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.

Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(viii)(A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O 13627) (Applies to all solicitations and contracts).

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (Executive Order 13658) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50

States and the District of Columbia)).

(x) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xi) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR[supreg]

Program or Federal Energy Management Program (FEMP) will be--

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xii) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .