Amendment of Solicitation.pdf
PDF 177 KB Posted
- Attached to
- USNA Vertically Integrated Turnkey Anechoic Chamber Test System Federal contract opportunity
- Solicitation number
- N0018920Q0076
About this file
This document is an amendment to a solicitation requesting a vertically integrated turnkey anechoic chamber test system. The Naval Supply Systems Command is seeking a system for the Electrical and Computer Engineering Department at the United States Naval Academy. Interested vendors must submit any questions by 12 March 2020 and submit quotes in two volumes, with the first addressing technical and past performance factors and the second containing pricing information. Quotes are due by the amended closing date of 2:00 PM Eastern Time on an unspecified date. The amendment changes the question submission deadline but otherwise leaves all other terms and conditions the same. Vendors are advised to review all requirements and submit questions early.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment of Solicitation 0003.pdf | ||
| Attachment 2 - Past Performance Report Form.docx | DOCX document | |
| Attachment 1 - Past Performance Information Form.docx | DOCX document | |
| Question and Answer for Solicitation N0018920Q0076.pdf | ||
| Amendment of Solicitation 0002.pdf | ||
| Justification and Approval for Brand Name or Equal.pdf | ||
| Solicitation N0018920Q0076.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0016120RC93002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the vendor questions date in 52.212-1 Instruction to Offerors.. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0018920Q0076
X 9B. DATED (SEE ITEM 11)
05-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Mar-2020
CODE
NAVSUP FLC NORFOLK CONTRACTING
NORFOLK OFFICE
ATTN: L MOHNEY
1968 GILBERT STREET STE 600
NORFOLK VA 23511
N00189 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0018920Q0076
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ADDENDUM TO FAR 52.212-1
ADDENDUM TO FAR 52.212-1, Instructions to Offerors -- Commercial Items Interested vendors may send a quotation by the specified closing date and time to the Navy in the following ways:
QUESTIONS: In order to ensure that all questions submitted by potential offerors are answered prior to the solicitation closing date, one consolidated list of questions concerning the solicitation should be submitted via e-mail to the contract specialist, Lorna Mohney at lorna.mohney@navy.mil no later than 2:00 PM, Eastern Time, on 12 March 2020. The Government reserves the right not to respond to any questions concerning this solicitation received after the questions receipt date above. Accordingly, quoters are encouraged to carefully review all solicitation requirements and submit questions to the Government as early as possible.
INSTRUCTIONS TO QUOTERS
I. GENERAL
In addition to any other instructions contained elsewhere in this Request for Quotation (RFQ), the following information is provided.
Quoters are required to submit their quotes in two (2) separate volumes as follows:
Volume Factors Volume I Non-Price Factors: Factor I: Technical Factor II: Past Performance Volume II Price Factor: Factor III: Price
Each page of each copy should include the following legend:
Source Selection Information - See FAR 2.101 and 3.104
In addition to the above listed two (2) volumes, quotes consist of, and must include, the following completed documents:
- A complete and signed RFQ and executed copy of all Amendments, if applicable, completed by the quoter (to be provided in Volume II along with the Price Quote)
The completion and submission of the above items will constitute a quotation and will indicate the quoter’s unconditional assent to the terms and conditions of this RFQ and any attachments and/or exhibits hereto.
Alternate quotations are not authorized. Quoters objecting or taking exception to the terms and conditions of the RFQ may be determined to be ineligible for award.
IMPORTANT NOTES:
(1) Quoters shall respond to all requirements of the RFQ document. Quoters are cautioned not to alter the RFQ.
(2) In the event any person who is not a bona fide employee of the quoter participated in the creation, formulation, or writing of any portion of the quote, a certificate to this effect shall be included in the quote which shall be signed by an officer of the quoter. Such certificate shall identify the name of the person who is not a bona fide employee, that person’s employment capacity, the name of the person’s firm, the relationship of that firm to the quoter, and the portion of the quote in which the person participated.
(3) Quotation submissions will be emailed to lorna.mohney@navy.mil
II. REQUIREMENTS FOR QUOTE FORMAT
1. Introduction and Purpose: This section specifies the format that quoters shall use in responding to this RFQ. The intent is not to restrict the quoters in the manner in which they will perform their work, but rather to ensure a certain degree of uniformity in the format of the responses for evaluation purposes.
2. Each volume shall contain the following items in addition to the technical/descriptive data required by this RFQ:
Cover: The cover should indicate the following:
-Title of the quote -Quote category (i.e. Past Performance, and Price) -Volume number (I or II) -RFQ number -Name and address of quoter/CAGE Code, TIN, and DUNS number -Identification of original or copies of quote -Quote validity period (minimum of 120 days from the date of RFQ closing) -Vendor point of contact’s email address and phone number
3. Requirements for Style: Each quoter shall submit a quote that clearly and concisely describes and defines the quoter’s response to the requirements contained in the RFQ. Unnecessary elaboration or other presentations beyond that sufficient to present a complete and effective quote are not desired and may be construed as an indication of the quoter’s lack of understanding of cost consciousness. Elaborate art work, visual or other presentation aids are neither necessary nor desired. The quote shall contain all the pertinent information in sufficient detail in the one area of the quote where it contributes most critically to the discussion of the same information. When necessary, the quoter shall refer to the initial discussion and identify its location within the submitted quote.
4. Page Limitations: The following page limitations are established:
Title Quantities Requested Page Limit* Volume I Non-Price Factors:
Factor I: Technical 1 Original Electronic Copy 20 Pages Factor II: Past Performance 1 Original Electronic Copy 12 Pages Volume II Price Factor:
Factor III: Price 1 Original Electronic Copy No Limit
Each factor of the Non-Price quote is limited to the maximum number of pages as defined in the table above. These page limitations are inclusive of the executive summary and any charts, diagrams, and/or other graphics. Graphics (including tables) included in the proposal may use an alternative font with 8-point size type or larger. Each “page” is defined as one sheet, 8 ½” x 11”, with at least one inch margins on all sides, using a font with a point size of 12 or greater (e.g., "Times New Roman" style with 12-point font). Lines shall, at a minimum, be single spaced in Microsoft Word. Pages shall be consecutively numbered. Multiple pages, double pages, two-sided pages, or foldouts will count as an equivalent number of 8 ½" x 11" pages. The quoter is permitted to submit no more than one page for each of the following, which will not be included in the page count: a cover sheet, list of tables, list of figures, list of acronyms, compliance matrix, table of contents, tabs, and dividers. Pages submitted in excess of the page limitations described above will not be evaluated. The Price Quote is not page limited; however, the Price Quote is to be strictly limited to price information and completed solicitation documents as described in the General Section at the beginning of this text.
* Page limits represent the maximum pages the Government will evaluate and are not construed as de facto standards for the amount of material expected in the proposal.
III. QUOTE CONTENT
Volume I Non-Price Quote
The Non-Price Quote evaluation factors are listed below:
Factor I – Technical
This volume shall address the technical requirements outlined in the Performance Work Statement (PWS) and shall include all information required for proposal evaluation. This volume shall exclude any reference to the price aspects of the proposal.
Offerors shall provide, in detail, a technical submission that demonstrates a complete understanding of and the capability to fully implement and execute all requirements of the solicitation and PWS. The offeror’s response shall address each of the requirements detailed in Section 4.0 of the PWS.
Factor II – Past Performance:
The quoter shall demonstrate relevant past performance or affirmatively state that it possesses no relevant past performance. Relevant past performance is performance under contracts or efforts within the past three (3) years prior to the closing date of the solicitation that is the same as or similar to, the scope and magnitude of the work described by this solicitation.
To demonstrate its past performance, the quoter shall identify up to three (3) of its most relevant contracts within the past three (3) years of the closing date of the solicitation. Quoters shall provide a detailed explanation demonstrating the relevance of the contracts to the requirements of the solicitation. For purposes of this solicitation, a contract is defined as a single contract or a single task order placed under an IDIQ contract, a Blanket Purchase Agreement (BPA), or a Federal Supply Schedule.
If the quoter includes delivery orders/task orders as past performance, the quoter shall state specifically what work was performed by the quoter under the delivery order/task order and the dates during which work was performed.
Subcontractor performance (either the quoter 's own subcontractor experience or proposed subcontractors experience) of major or critical aspects of this requirement will be considered as highly as prime contractor past performance information for the quoter.
If proposed subcontractor past performance is provided as part of the three (3) of its most relevant contracts or efforts, the percentage and type of work to be done by the subcontractor on the solicitation requirement must be stated. The quoter’s proposal shall detail clearly the aspects of the work in the solicitation that the subcontractor is proposed to perform. A Past Performance example which does not detail clearly the aspects of the work in the solicitation that the subcontractor is proposed to perform will not be evaluated. Quoters may submit a combination of no more than three (3) delivery orders (DOs), task orders (TOs), technical direction letters (TDLs), and/or technical area tasks (TATs) placed under an ID/IQ or BPA as one of the three examples of past performance. Each individual example in the combination must have been performed within three (3) years of the closing date of this solicitation. No more than one combination of DOs, TOs, TDLs and or TATs is permitted in the past performance submittal.
If the prime quoter or intended subcontractor/partner submits a past performance example in which it served as a subcontractor, the prime/sub/partner shall detail clearly the work that it performed and the magnitude (dollar value) of that subcontracted work only. A Past Performance example that does not differentiate between the overall contract effort and the subcontractor effort will not be evaluated.
The references will be evaluated in the aggregate in order to allow quoters who may not have the entire scope and magnitude of the requirement under one individual contract to still be evaluated for quality if past performance with the full scope and magnitude of the requirement can be demonstrated within the allotted number of references as described above.
The quoter should complete a Past Performance Information Form (Attachment 1) for each reference submitted.
The form is an attachment to the solicitation. For additional information regarding a particular reference beyond that which will fit on the form, the quoter may continue onto another sheet of paper. The forms and any such continuation sheet(s) for submitted references will count toward the Volume I page limit described above.
In addition to the information requested above, offerors shall contact their past performance references and request that each reference complete the attached Past Performance Report Form (Attachment 2) and e-mail the completed survey directly to Lorna Mohney at lorna.mohney@navy.mil by the closing date and time of this solicitation.
The Government reserves the right to consider past performance report forms received after the closing date of the solicitation and to contact references for verification or additional information.
Volume II
Factor III – Price:
The Price Quote shall include the completed solicitation documents. The price quote shall include all elements of price and such other price information considered appropriate to support the quoter’s proposal. The pricing information shall be completed in accordance with the following:
- A complete and signed SF1449 (Solicitation/Contract/Order for Commercial items) and executed copy of Amendments, if applicable, completed by the quoter;
- All supplemental information to support the proposed price.
- A completed and signed Page 1 of the solicitation and a completed and signed Page 1 of any amendments.
- Unless completed in SAM, RFP, Representations, Certifications and Other Statements of Offerors completed by the quoter.
Small Business Subcontracting Plan (For other-than-Small Businesses Only). Each Quoter that is not a small business shall provide a Small Business Subcontracting Plan that contains all elements required by FAR 52.219-9 (DEVIATION 2018-O0007), as supplemented by DFARS 252.219-7003 (DEVIATION 2018-O0007) by the closing date and time stated in the solicitation. This plan will not be evaluated as part of the formal source selection process. The Small Business Subcontracting Plan must be determined to be acceptable by the Contracting Officer in order for the quoter to be eligible for contract award in accordance with FAR 19.702(a)(1). If the apparently successful quoter fails to negotiate a subcontracting plan acceptable to the contracting officer within the time limit prescribed by the contracting officer, the quoter will be ineligible for award. If the Contracting Officer accepts the Small Business Subcontracting Plan, it will become part of the contract. Quoters are permitted to submit a master subcontracting plan as long as it is created in accordance with FAR 19.701 and FAR 19.704(b). Small Business Subcontracting Plans are not required from quoters that qualify as Small Business concerns under NAICS Code 334515 with a Size Standard of 750 Employees.
It is the goal of this solicitation that prime contractors subcontract with small businesses to the maximum extent practicable. For other-than-small prime contractors, the Small Business Subcontracting Plan goals shall be expressed in terms of whole dollars and percentages based on total planned subcontracting dollars. Of the total planned subcontracting dollars, the Small Business Subcontracting Plan shall include goals for Small Businesses, Small Disadvantaged Businesses, Woman-Owned Small Businesses, HubZone Small Businesses, Veteran Owned Small Businesses and Service-Disabled Veteran-Owned Small Business. The Government will consider prior achievement of small business subcontracting plan goals as well as the quoted dollar values and percentages related to this solicitation.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .