Attachment_III_-_QASP.doc
DOC document 64 KB Posted
- Attached to
- see previous Federal contract opportunity
- Solicitation number
- N0018918R0096
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0018918R0096_Attachment_VII_-_AUDIOVISUAL_J_A_Redacted.pdf | ||
| N0018918R0096_Attachment_V_CDR.docx | DOCX document | |
| N0018918R0096_Attachment_IV_-_CAP.docx | DOCX document | |
| N0018918R0096_Attachment_VI_-_Wage_Determinations_Suffolk,_VA_and_Washington_DC.docx | DOCX document | |
| SYN-SOL_N0018918R0096.docx | DOCX document | |
| Attachment_I_-_Draft_PWS.docx | DOCX document | |
| Attachment_II_-_Draft_DD254.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) AND MATRIX
1.0
PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2.0
AUTHORITY
Authority for issuance of this QASP is provided under FAR 52-212-4(a), Inspection/Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the Contracting Officer or their duly authorized representative.
3.0
SCOPE
The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet quality standards set forth by the contract. The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan. The Government may provide the Contractor an information copy of the QASP as an Attachment to the solicitation to support the Contractor’s efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract.
4.0
RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
· Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
· Contracting Officer’s Representative (COR) – An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for the COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5.0
METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP. The QASP Matrix describes the methods of surveillance that may be used to monitor the services and deliverables to be provided under the contract.
· Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the Contractor. The Contractor shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.
· Random Checks/Inspections – Random checks will be conducted to ensure compliance with the Standard Operating Procedures (SOP). The CO or Technical Point of Contact (TPOC) will conduct the random monitoring.
6.0
IDENTIFIED QA SURVEILLANCE ITEMS
The PBSC items that have been identified for surveillance are identified in the Performance Work Statement (PWS).
1.2.3 Elements of the PWS will be monitored in the QASP for the following positions and based upon the job descriptions as listed in the QASP:
· Provide on-site support to maintain the availability of the A/V systems installed
· Assist in troubleshooting and repairing any customer related concerns/issues
· Document any findings, recommendations and procedures for maintaining environment
· Provide configuration, optimization, and maintenance support for A/V system
· Provide design and implementation on A/V system upgrades and enhancements
· Spearhead transitioning from ISDN to IP based VTC systems (if procured)
· Provide current and accurate architectural designs and schematics of existing and any installed A/V systems QASP Matrix
| Performance Element |
| Performance Requirement |
| Method of Surveillance |
| Frequency |
| Acceptable Quality Level (AQL) |
| Procedures to be taken when performance standards are not met |
Perform on-site Support
| Act as technical support to assist with customer service concerns |
| File reviews, periodic inspections, and random observations, and customer complaints |
99%
FAR Clause 52.212-4(a) Inspection/Acceptance
| Perform installations and upgrades as required |
| Completed installation meeting final testing performed by Facilities Mgr |
| File reviews, periodic inspections, and random observations, and customer complaints |
99%
FAR Clause 52.212-4(a) Inspection/Acceptance
Provide diagrams and documentation
Final documentation of installed components
File reviews, periodic inspections, and random observations, and required reports
| 99% |
| FAR Clause 52.212-4(a) Inspection/Acceptance |
INCENTIVES/DISINCENTIVES:
The COR makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the COR’s annual report, may result in termination of the contract and may also result in the loss of future Government contracts. Additionally, the contractor’s failure to achieve satisfactory performance under the contract may also result in the non-exercise of available options.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
File details come from the government source that posted it.