Attachment_1.doc
DOC document 44 KB Posted
- Attached to
- 099 Federal contract opportunity
- Solicitation number
- N0018913T0222
About this file
Attachment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.doc | DOC document | |
| UpdatedResumeForm.pdf | ||
| Amendment_2.doc | DOC document | |
| Attachment_6_CAP.doc | DOC document | |
| Attachment_5_CDRFORM.doc | DOC document | |
| Amendment_1.doc | DOC document | |
| Attachment_2_and_3.doc | DOC document | |
| Solicitation_N00189-13-T-0222.doc | DOC document | |
| N0018913T0222_Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Quality Assurance Surveillance Plan (QASP)
For Machinery and Machine Guarding Standards Training Contract
1. Purpose This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued thereunder. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2. Authority Authority for issuance of this QASP is provided under the Federal Acquisition Regulation (FAR) 52.212-4 “CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2003), paragraph (a), which provides for inspections and acceptance of the articles, services, and documentation called for in task orders to be accomplished by the Contracting Officer or his duly authorized representative.
3. Scope The Quality Assurance Surveillance Plan (QASP) is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not intended to duplicate the Contractor’s Management Plan.
4. Government Resources The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
Enclosure (8)
5. Responsibilities
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the project and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
5. Methods of Quality Assurance Surveillance
The below listed methods of surveillance shall be used in the administration of this QASP.
Customer Feedback – Customer feedback may be obtained from students’ critique. The COR shall maintain a summary log of all formally received critiques as well as a copy of each critique in a documentation file.
Periodic Audits – The COR will conduct periodic audits of the class to ensure adherence with the Statement of Work (SOW), to ensure the accuracy of the information presented by the instructor, and to ensure the professionalism and competency of the instructor. Audits may be performed by the COR, the course supervisor, or a designated representative.
Routine Inspection - The COR will inspect the documentation that is received from the instructor after every convening of the course. The COR will also monitor that the contractor is in compliance with all terms of the contract.
6. DOCUMENTATION
The COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function. All such records will be retained for the life of this contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
For each item on the QASP Matrix that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality services in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
Machinery and Machine Guarding Standards
QASP Matrix
| Deliverable or Service Requirement |
| Measurement/Metric |
| Performance |
Standard
| Maximum Error Rate |
| Method of |
Surveillance Procedures to be taken when performance standards are not met
| Course Completion Report (per paragraph 5.1.10 of the SOW) |
| Accuracy |
Timeliness All class in formation required by the contract must be submitted to the COR
Within 30 calendar days of the completion of the course.
0%
0% Routine inspection
Routine inspection If course completion reports are not received within the specified time period, details will be recorded on “past performance report card”.
| Student Critiques (per paragraph 5.1.10.1 of the SOW) |
| Quantity |
| The instructor shall collect critiques from at least 95% of the students in attendance. |
| 5% |
| Routine inspection |
| If course completion reports are not received within the specified time period, details will be recorded on “past performance report card”. |
| Invoices (per paragraph 5.1.12 of the SOW) |
| Accuracy |
Timeliness Completed invoices will include the fixed price cost for the convenings taught, as well as any reimbursement for travel and per diem.
Within five (5) working days after return from travel.
0%
0% Routine inspection
Routine inspection If invoices are not received within the specified time period, details will be recorded on “past performance report card”.
| Key Personnel (per paragraphs 7.1.1 and 7.1.4 of the SOW) |
| Frequency |
| Contractor shall not have more than a 20% turnover rate during the life of the contract |
| 0% |
| Routine inspection |
| If contractor exceeds maximum turnover rate, details will be recorded on “past performance report card”. |
| Audits (per paragraph 9.2 of the SOW) |
| Timeliness |
| Contractor shall make the necessary corrections either within 30 days of notification or before the next class convening, whichever occurs first. |
| 0% |
| Routine inspection |
| If recommended corrections are not incorporated as prescribed by performance standard, the Government will increase oversight, and will increase the frequency of classroom monitoring at the contractor’s expense. |
PAGE
File details come from the government source that posted it. Updated .