This document contains Questions and Answers related to a federal contract opportunity for the replacement of compressors. The key details are:

The contract opportunity is a Request for Quotation (RFQ) issued by the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) to procure compressors and related equipment on a brand name or equal basis, with a preference for Kaeser Compressors, Inc. products. The requirement is for a "direct replacement" of existing equipment, with removal and installation being a straightforward electrical/mechanical disconnect and re-installation. Failure to procure the requested hardware and service could result in a work stoppage. The contract will be awarded on a Lowest Price Technically Acceptable basis. Offers are due by June 11, 2024 at 12:00 pm EST, with an anticipated award date of July 24, 2024. The contract will be firm-fixed price. Offerors must be registered in the System for Award Management (SAM) and must submit a letter of authorization from the Original Equipment Manufacturer (OEM).

View the file

Other files for this federal contract opportunity

Other files attached to Compressor Replacement Install, newest first.
File Type Posted
Q and A.docx DOCX document
Q and A.docx DOCX document
1449 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: Is the prime contractor expected to be an authorized reseller who have provided a Letter of Authorization or if it suffices to submit the subcontractor’s letter.

A: A Letter of Authorization from the OEM is required for the prime contractor, and if being subcontracted, the prime would need to verify through the OEM is any further Letter of Authorizations are needed.

Q: Can you get the existing tag (EMR) on the current unit?

A: Not sure what is being requested, currently e have SX-7 pumps and a KAD-60 Dryer.

Q: Do you need full redundancy? (Are both machines working at the same time)

A: YES

Q: Do you need the full aircenter? (Both compressors, Refrigerated dryer, and storage tank?

A: YES

Q: Is this 125 psig?

A: Yes

Q: What is the voltage?

A: 115VAC/60Hz/1Ø, 3.2 Amps