Amendment SF18 N0017818Q0136

View the file

Other files for this federal contract opportunity

Other files attached to PREFABRICATED STRUCTURES, newest first.
File Type Posted
SF18_N0017818Q0136.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the specifications. All other terms and conditions shall remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017818Q0136

X 9B. DATED (SEE ITEM 11)

01-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jun-2018

CODE

NSWCDD 3

ATTN: RITA NEWMAN/CODE 026

DORITHA.NEWMAN@NAVY.MIL

17632 DAHLGREN ROAD SUITE 157

DAHLGREN VA 22485

N00178 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

vikki.rouleau@navy.milEMAIL:540-653-8982TEL:

VIKKI L ROULEAU / CONTRACTING OFFICER

N0017818Q0136

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Jun-2018 05:00 PM to 21-Jun-2018 05:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SPECIFICATIONS

Two 8’ W X 40’ 9’6” high cube one-trip CONEX boxes are required, outfitted as specified below, both to be Delivered to Navy on Wallops Island, VA:

1. Restroom/Lunchroom container

40’x8’x9’6” New One‐Time Used Steel High Cube Container, Wood Floor, Double Locking Rear Doors, Watertight and Structurally Sound, Primed and painted for exterior harsh (near salt water) environment

‐ CONEX Box must accommodate the Government’s plan to secure them with twist locks at each corner.

‐Insulate and finish interior of unit using textured Light Gray (FRP) sheets laminated to OSB Board mounted onto 2”x4” studs, and R13 insulation. The walls, doors, and ceiling to have studs on 16” centers. Vinyl molding to give interior finished look. Inside “finished” Height 8ft.

‐tack weld rear swing doors shut

‐Install Bard 36,000 Btu Cool 8Kw Heat unit in nose, with interior thermostat.

‐ Install (Insulated) Ductwork (above) ceiling and (5) vents mounted in ceiling.

‐Install commercial grade polyvinyl (rubber like) floor over existing floor

‐Install (1) 36” HD 16‐gauge steel personnel door in side of unit with interior Emergency Crash Bar and Closer.

Install Emergency exit sign with arrow point towards door.

‐ Door will be lockable/operable from interior and exterior

‐Install (2) 32”x38” double hung Low E windows on sides of container. All windows to be installed into a hole framed with 2”x2” square steel tubing welded to container, with security bars.

‐install 30in Sink base cabinet, with (3) addition base cabinets all totaling 10’, (2) 33” wall cabinets, all cabinets white shaker, with SS sink, sink faucet, 1 gpm Instant Hot, plumbing to side of container, 10ft countertop, 2.0

cu. ft. microwave, 18 cu. ft. refrigerator, (2) GFI outlets

‐ Build wall for (2) bathrooms, (1) unisex and (1) handicap, and install 30” x6’8” in unisex and 36” x 6’8” in handicap, wood door with vent to separate section for bathrooms, sized per drawing.

‐ Raise floor of container under toilet and vanity area approximately 8” high to allow for draining. Install 2‐ piece 1.28 GPF High Efficiency Single Flush Toilet. Install 24” x18.75 Vanity with white composite Sink and engineered solid surface, includes medicine cabinet with mirror. Install 3 kW 110V 0.5 GPM Tankless instant

N0017818Q0136 water Heater. Supply and install all faucets, fixtures, soap dish, and towel bars. Supply and rough in all plumbing to exterior connection portal on side wall

Electrical Work (surface mounted) As Follows:

‐install (4) 2‐lamp 4ft 120V channel ceiling lights evenly spaced in ceiling with LED Bulbs and light switch ‐install (8) 120V 20A duplex electrical outlets, 100‐amp service panel box and breakers.

‐install small ceiling light, wall exhaust fan, and GFI outlet in each bathroom ‐install exterior elbow to prepare panel box for hookup to outside electric hardwire source.

2. Office container

40’x8’x9’6” New One‐Time Used Steel High Cube Container, Wood Floor, Double Locking Rear Doors, Watertight and Structurally Sound, Primed and painted for exterior harsh (near salt water) environment

‐Insulate and finish interior of unit using textured Light Gray (FRP) sheets laminated to OSB Board mounted onto 2”x4” studs, and R13 insulation. The walls, doors, and ceiling to have studs on 16” centers. Vinyl molding to give interior finished look. Inside “finished” Height 8ft.

‐Install Bard 36,000 Btu Cool 8Kw Heat unit in nose, with interior thermostat.

‐ Install (Insulated) Ductwork (above) ceiling and (5) vented mounted in ceiling.

‐Install commercial grade polyvinyl (rubber like) floor over existing floor ‐Install (2) 36” HD 16‐gauge steel personnel door in side of unit with interior Emergency Crash Bar and Closer.

Install Emergency exit sign between doors with arrow point towards doors.

Doors will be lockable/operable from interior and exterior ‐Install (6) 32”x38” double hung Low E windows on sides of container. All windows to be installed into a hole framed with 2”x2” square steel tubing welded to container, with security bars.

‐install 60in Sink base cabinet painted white, with SS sink, sink faucet, 1 gpm Instant Hot, plumbing to side of container, 5ft countertop, (2) GFI outlets Electrical Work (surface mounted) As Follows:

‐install (4) 2‐lamp 4ft 120V channel ceiling lights evenly spaced in ceiling with LED Bulbs and (2) light switches ‐install (8) 120V 20A duplex electrical outlets, 100‐amp service panel box and breakers.