0701-01_-_Foster-Miller_Repairs_-_SOW.docx

DOCX document 33 KB Posted

Attached to
FOSTER-MILLER REPAIRS Federal contract opportunity
Solicitation number
N00178-16-T-0201
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to FOSTER-MILLER REPAIRS, newest first.
File Type Posted
SF18_N00178-16-T-0201.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION & REPAIR SERVICES

STATEMENT OF WORK (SOW)

1.0 BACKGROUND

In today’s modern battle spaces, where potential enemies understand the United States (US) strengths and capitalize on the asymmetric nature of specific areas, small unit leaders will increasingly enter these hostile environments and encounter life-threatening situations. The Marine Corps Warfighting Laboratory/Future’s Directorate (MCWL/FD) recognizes that tactical units need an organic suite of unmanned systems to conduct Reconnaissance, Surveillance, and Target Acquisition (RSTA) in these complex environments. The MCWL/FD also believes that an integrated Tactical Robotic Controller (TRC) can assist this mission by providing a single universal controller for the suite of unmanned systems (Unmanned Ground Vehicles (UGVs) and Unmanned Aerial Vehicles (UASs)). The TRC provides observational data of confined/distant areas where human access is impractical or unsustainable, mitigating risk to the Marines normally carrying out these missions.

The MCWL/FD Science and Technology (S&T) Division, Ground Combat Element (GCE) Branch, is instrumental in quickly adapting to our adversaries through counter measures. In order to support MCWL’s efforts and ultimately the warfighter, TRCs’ require timely integration and testing with a mesh network and other tactical unmanned sensors. MCWL conducts experiments to determine the efficacy of such a computer system at the Marine small unit level. Focus is primarily on the minimization of the sensor to shooter timeline, and facilitating a rapid prosecution of tactical targets.

2.0 APPLICABLE DOCUMENTS

Original Equipment Manufacturer (OEM) Specifications

3.0 REQUIREMENTS

The Contractor shall provide integration testing, troubleshooting, tear-down evaluation and repair, and maintenance services for the Marine Corps Warfighting Labs Tactical Robotic Controllers, ground robots, and communications modules.

3.1The Contractor shall provide maintenance and repair services for twenty (20) Government-owned Tactical Robotic Controllers (TRCs), eleven (11) Government-owned Ground Vehicle Communications Modules (GVCMs), and two (2) Foster-Miller (QinetiQ) built Government-owned ground robots.
3.2The Contractor shall ensure all services provided shall be performed by trained personnel who are fluent in the operation of the instrument and/or third party accessories.
3.2.1Contractor personnel shall have at least two (2) years of experience with the equipment identified or any third party accessories.
3.3The Contractor shall perform diagnostics on Government equipment to identify the root cause of instrument failures;
3.4The Contractor shall formulate corrective action plans and provide quotes for the repair of the components/instruments.
3.4.1The quotes shall identify the specific work required to bring the unit back to full operational status in accordance with manufacturers’ specifications.
3.4.2The quotes shall be inclusive of all required parts and labor;
3.4.3The quotes shall include the estimated repair time and targeted delivery dates;
3.4.4Corrective action plans for obsolete equipment shall identify the proposed hardware upgrades and/or equipment enhancements as well as identify the make model and serial number of the equipment planned for modification.
3.4.5The quotes shall be facilitated on a firm-fixed-price (FFP) basis.
3.4.6The quotes shall be provided to the Contracting Officer and the designated Government representative.

*The Contractor shall not repair nor incur any costs prior to the Governments’ acceptance of the quotes and modification to the contract authorizing the repairs.

3.5The Contractor shall only employ tools, instruments, test apparatus, methodologies, techniques, and practices approved for use by the respective subcomponent manufacturer.
3.6All non-direct replacement parts shall be approved for use by the designated Government representative prior to incorporation.
3.7The Contractor shall adhere to all the service protocols and instrument specifications identified in the most recent version of the operation and maintenance manuals for the specific piece of equipment when performing maintenance.
3.8The Contractor shall be responsible for obtaining all parts required for all repairs and maintenance.

NOTE: Replacement parts provided under this agreement may be either new or remanufactured and the Contractor may exchange and/or repair existing components.

3.9All repairs shall result in the instruments meeting all manufacturer’s specifications identified in the most recent version of the operation and maintenance manual for the covered equipment.
3.10Any parts or components removed for replacement shall become the property of the MCWL unless otherwise agreed to by the designated Government representative.
3.11The Contractor shall provide telephone support for the equipment identified within the SOW during regular business hours.
3.11.1Regular business hours are Monday through Friday, 8:00 am to 5:00 pm EST.
3.11.2Telephone support shall include responses to questions about functionality, integration, operating procedures, and service issues that can be diagnosed and/or resolved over the telephone.
3.12The Contractor shall ship the repaired equipment to the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) located in Dahlgren, Virginia.
3.13The Contractor shall notify Naval Surface Warfare Center, Dahlgren Division (NSWCDD), Technical Point of Contact (TPOC) identified below within 24 to 48 hours before delivery to inform the receiving agency of the estimated shipment arrival time and any tracking information available.

3.14 All services shall be performed at the Contractors’ facilities.

*The Contractor shall not perform any services outside of the evaluation of equipment and formulation of corrective action plans. Once corrective actions are identified, the Contractor shall submit the quote to the TPOC and Contracting Officer for approval and subsequent contract modification prior to completing any additional service.

**The Government reserves the right to modify this contract at a later date to cover repair services/upgrades identified during the initial inspections.

4.0DELIVABLES
4.1The Contractor shall provide Repair Procedures IAW CDRL A001;
4.2The Contractor shall provide Obsolescence Alert Notices IAW CDRL A002; and
4.3The Contractor shall provide Repairable Item Inspection Reports IAW CDRL A003.
5.0ACCEPTANCE/INSPECTION
5.1The Government reserves the right to conduct quality assurance testing to confirm that a given component meet’s the original performance specifications.
5.2All Government testing will be completed within ten (10) working days upon receipt of repaired items.
6.0SECURITY
6.1The work to be performed under this contract is unclassified.
6.2The Contractor shall be responsible for safeguarding all Government information or property provided for Contractor use.
6.3At the end of each work period, Government information, equipment and materials shall be secured per Contractor processes and procedures.
7.0GOVERNMENT FURNISHED EQUIPMENT/MATERIALS

The Government will send the following instrument components in need of evaluation for repairs to the Contractor during the period of performance for evaluation: Twenty (20) Government-owned Tactical Robotic Controllers (TRCs); Eleven (11) Government-owned Ground Vehicle Communications Modules (GVCMs); and Two (2) QinetiQ built Government-owned ground robots.

8.0 TECHNICAL POINT OF CONTACT

Alex MacMurray, H42 Phone: 540-284-0518 Email: alex.macmurray@navy.mil