Deliverables-Requirements_List.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
GMRCS Computer Prototype Federal contract opportunity
Solicitation number
N00178-16-T-0015
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Deliverables/Requirements List

View the file

Other files for this federal contract opportunity

Other files attached to GMRCS Computer Prototype, newest first.
File Type Posted
SF18_-_N00178-16-T-0015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sole Source Requirements

Proposed GMRCS Prototype
Requested ItemDescriptionPart NumberSpecifications
VPX 3U ComputerProcessorVPX7664-3516i7-4700EQ
8 Gigabit RAM
No Flash Memory
1x HDMI Port
2x USB 3.0 Port
3x USB 2.0 Ports
1x SATA (Serial ATA)
4x Serial Ports (configurable)
8x GPIO (General Purpose Input/Output)
Reconfigurable Personality Module (21mm x 22.5mm)
2 10 Gb Ethernet Base-T Ports Auto Negotiating

10GbE/1GbE/100MbE

3 PCIe 3.0 Fatpipes
XMC Site

VPX Video A/D-Overlay-D/A Card Video Capture Card 801-3201-000 AMD Video Capture Card

Power Supply CardPower SupplyOTI5100Up to 715 W Maximum
Up to 21A for +12 VDC
Up to 40A for +5 VDC
Up to 50A for +3.3 VDC
+12 V / -12 V AUX 4.2 A
Up to 94% Efficient

PCIE 104 Ethernet Switch Switch PCI6122 PCIE/104 Ashley Avery: A 3U VPX Switch is available but it will not be removable with the SSD(s) (if feasible with remote memory) 12 Port Gigabit Smart Switch (shared memory TBD)

Classified Hard Drive Removable BumpEnclosureOTI84216Conduction Cooled 3U VPX 6 Slot Enclosure
Backplane with removable SSD drives
Environmental Requirements

Ashley Avery: Unit will be designed to meet all these environments

Ashley Avery: A 3U VPX Switch is available but it will not be removable with the SSD(s) Operational 0 to 125 F

Storage -40 to 160 F

Humidity 95% MIL-STD-810F, Method 507.4

Fungus Resistance MIL-STD-810F, Method 508.5

Settling Dust6 g/m2/day
MIL-STD-810F, Method 510.4, Procedure 3

Shock MIL-S-910D, Grade B

Vibration Custom

Transport Shock and Vibration MIL-STD-810F, Method 516.4, 514.4

File details come from the government source that posted it. Updated .