N0017424R0004 - FINAL.docx

DOCX document 188 KB Posted

Attached to
MK 85 Motor Tubes - Solicitation Federal contract opportunity
Solicitation number
N0017424R0004
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Request for Proposal (RFP) for the fabrication, test, inspection, and shipment of MK 85 Motor Tubes in accordance with drawing number 1638AS301. The Naval Surface Warfare Center Indian Head Division (NSWC IHD) has a requirement for approximately 550 motor tubes during the base year, with optional quantities in the option year. The contractor shall provide first article testing, production work, and required documentation such as certificates of analysis, quality assurance plans, and progress reports. The RFP outlines detailed technical requirements, including manufacturing processes, inspections, testing, packaging, and delivery. Pricing is requested using stepladder pricing for quantities between 150-550 units. The contract will be firm-fixed price, and the first article must be delivered 40 weeks after contract award. The solicitation number is N0017424R0004.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0017424R0004

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QTY
U/I
UNIT PRICE
AMOUNT
0001
Base Year

MK85 Motor Tubes - First Article Testing

10
Each

DWG NR: 1638AS301

FOB: Destination

FFP

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
550
Each

Base Year

FFP

MK85 Motor Tubes - Production

Stepladder Pricing 150 to 249 250 to 349 350 to 449 450 to 550 FOB: Destination

DWG NR: 1638AS301

PSC CD: 1420

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Base Year

FFP

Contract Data Requirements List (CDRL)

NOT SEPARATELY PRICED

A001- Final Inspection Plan A002-Certification of Analysis for Motor Tubes A002-Certification of Analysis of Aluminum Alloy A002-Certification of Analysis of Heat Treatment A002-Certification of Analysis Hydrostatic Test A002-Certification of Analysis for Dimensional Inspection A003-Request for Variance A004-Quality Assurance A005-Progress Reports A006-Certificates of Compliance FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
550
Each
OPTION
Option Year I

FFP

MK85 Motor Tubes - Production

Stepladder Pricing 150 to 249 250 to 349 350 to 449 450 to 550 FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot
OPTION
Option Year I

FFP

Contract Data Requirements List (CDRL)

NOT SEPARATELY PRICED

A001- Final Inspection Plan A002-Certification of Analysis for Motor Tubes A002-Certification of Analysis of Aluminum Alloy A002-Certification of Analysis of Heat Treatment A002-Certification of Analysis Hydrostatic Test A002-Certification of Analysis for Dimensional Inspection A003-Request for Variance A004-Quality Assurance A005-Progress Reports A006-Certificates of Compliance FOB: Destination

MAX

Section C - Descriptions and Specifications

Statement of Work MK 85 Motor Tubes

1.0 INTRODUCTION

This Statement of Work (SOW) establishes and defines the requirements for fabrication, test, inspection, and shipment of MK 85 Motor Tubes, drawing number 1638AS301.

1.1 Scope

The MK 85 Motor Tube is an item designed as a container for the wiring, the ignition, the propellant, and the nozzle of a rocket motor. The tube is made of aluminum alloy 7075-T6 or T651. The motor tube must be manufactured in accordance to the technical data package. The requirements of the drawing must be met.

The contractor who is awarded the contract will purchase the material, fabricate, perform in-process inspection, acceptance tests, and package motor tubes.

1.2 Applicable Documents

* Copies of Government documents are available online at http://quicksearch.dla.mil/ or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094

ASTM E 10-01
Standard Test Method for Brinell Hardness of Metallic Materials
ASTM 18-17
Standard Test methods for Rockwell Hardness and Rockwell Superficial Hardness of Metallic Materials
ASQ-Q9003
Quality Systems – Model for Quality Assurance in Final Inspection and Test
ISO 9001
Quality Assurance Requirements for Measuring Equipment
DOD-STD-2101
Classification of Characteristics
MIL-HDBK-61A
Configuration Management Guidance
MIL-STD-810G
Environmental Engineering Considerations and Laboratory Tests
MIL-P-16594A
Manufacture of Projectiles, Bombs, Rockets, and Guided Missile Warheads, Inert Parts,
MIL-DTL-5541E
Chemical Conversion Coatings on Aluminum and Aluminum Alloys
MIL-E-16663A
Enamel, Type I, Class 1 or 2, Color No. 27875, Semi-gloss Insignia White
MIL-STD-130N
Identification Marking of U.S. Military Property
MIL-STD-1168C
Ammunition Lot Numbering and Ammunition Data Card
MIL-H-18911A
Military Specification for Heads and Motors, Rocket, Inert Parts, Painting and Marking
MIL-HDBK-1461A
Ammunition Manufacturers and Their Symbols
SAE-QQ-A-200/11
Aluminum Alloy 7075, Bar, Rod, Shapes, Tube, and Wire, Extruded
SAE-A-22771
Aluminum Alloy Forgings, Heat Treated
SAE 2270N
Heat Treatment of Wrought Aluminum Alloy Parts
ASME B1.8-1988
Stub ACME Screw Threads
ASTM E 3-11
Standard Practice for Preparation of Metallographic Specimens
ASTM E8/E8M-16
Standard Test Methods for Tension Testing of Metallic Materials
ASTM B 557-15
Standard Test Methods of Tension Testing Wrought and Cast Aluminum- and Magnesium-Alloy Products

2.0 REQUIREMENTS

2.1 Manufacture, Inspect, & Shipment Requirements

This section discusses the requirements for manufacture, inspection, and shipment/delivery of motor tubes. It is required to send a first article sample of 15 motor tubes to NSWC before full production of tubes at the quantities specified in the matrix below. If parts are inspected and rejected by NSWC IHD, the vendor is liable for re-inspection costs.

2.1.1 Motor Tubes

2.1.1.1 Motor Tube Manufacturing Process

The contractor shall manufacture the integral bulkhead motor tube using an impact extrusion or flow forming process.

2.1.1.2 Surface Finish

The contractor shall finish all motor tubes surfaces IAW the finish requirements of Drawing 1638AS301.

2.1.1.3 Hydrostatic Test

The contractor shall hydrostatically test each motor tube per Note 10 of 1638AS301. The motor tube must not have any leakage, pressure drop, or permanent deformation as called out in Note 10 after the hydrostatic test is completed.

2.1.1.4 Dimensional Analysis

The Contractor shall perform a dimensional analysis. The analysis shall occur after the hydrostatic test and before the chemical conversion coat as per Note 13 of Drawing 1638AS301. Actual measured dimensions for the two critical, and a sampling plan measurement of the 24 major and all minor characteristics shall be listed on a copy of a Final Inspection Plan (CDRL A001) as developed by the contractor.

A quantity of Motor Tubes shall be manufactured in accordance with drawing 30003-1638AS301 No Rev according to the delivery schedule below.

Motor Tube Quantity Matrix 150 to 249

250 to 349

350 to 449

450 to 550

2.1.2 Certification and Dimensional Inspection

The contractor shall provide a Certification of Analysis in accordance with CDRL A002 to drawing and specifications to NSWC IHD for each delivery.

2.1.3 Lot Numbering

The contractor shall assign and mark each delivery with a Lot number per MIL-STD-1168. The appropriate lot number shall be listed on each certification of analysis.

2.1.4 Packaging

The contractor shall package the motor tubes horizontally in a cardboard box. Each box should contain seven motor tubes. Up to seven boxes should be on a single pallet. Each pallet shall be permanently labeled with: “MK 85 Mod 0 Motor Hardware”, drawing number with revision, item description or component part name, manufacturer name, contract number, lot number per MIL-STD-1168, quantity per palette, and weight. Pallet of components shall be stretched wrapped on pallets to commercial standards. Total pallet height is not to exceed 72 inches.

2.1.5 Number of Motor Tube Lots per CLIN

All motor tubes delivered per contract line item number (CLIN) shall be manufactured as a single production lot.

2.2 Documentation

The contractor shall provide the documentation as specified by the attached Contract Data Requirements List DD 1423.

2.2.1 Requests for Variance

The contractor shall prepare requests for variations as necessary to request proposed changes to the specified engineering requirements or to document the as-built configuration. Request for variations are a deliverable per CDRL A003.

2.2.2 Quality Assurance Program Plan

A Quality Assurance Program Plan shall be written and submitted by the contractor. This document shall address all aspects of production, testing, and inspection as called out in the technical data package and this statement of work. This document shall be submitted within 30 days of contract award. All production, inspection, and testing shall adhere to the requirements of this document. If any changes are made to the Quality Assurance Program Plan during the use of this contract, the contractor shall notify NSWC IHD in writing of these changes. Changes to the Quality Assurance Program Plan could result in the necessity of additional first article testing. This additional first article sample and test series shall be at the vendor’s expense. The Quality Assurance Program plan is a deliverable per CDRL A004.

2.2.3 Progress Reports

The contractor shall submit monthly progress reports to the Contracting Officer and the Technical POC. These reports shall be the vehicle where by the Navy may be appraised as to work accomplished, work remaining, key personnel changes, milestone achievement, quality problems, raw material procurement schedules, tooling plans, and potential design changes. This report cycle starts on the award date of the contract and continues until the contract is completed. Progress reports are deliverables per CDRL A005.

2.3 First Article Testing

The contractor must submit ten (10) First Article Test Units (1638AS301) for evaluation. The First Article submission shall be performed after contract award and prior to production. The units submitted shall be production representative. This means that the first articles shall be manufactured and processed using the same materials, processes and procedures that will be used during full-scale production. If at any time, a first article test unit fails to meet the requirements of Drawing 1638AS301, applicable specifications, SOW, and/or contract, the first article lot submission will be rejected without further testing.

2.3.1 First Article Approval

The Government will conduct all first article approval testing and will relay test results to contractor within 30 calendar days after receipt of the first article test units. Once the First Article of an item is approved/accepted, the Contractor shall not change sub-contractors without prior approval from the Government.

NOTE:Any offeror that has previously completed and passed the first article testing and MK 85 motor tube production that has not been shut down for more than two consecutive years can waive the requirements of Section 2.3 in this statement of work.
NOTE:If a new aluminum alloy manufacturer is used, the following first-article testing must be completed and all results passed the requirements of drawing 1638AS301, applicable specifications, SOW, and/or contract before the offeror can proceed with production.
2.3.2First Article Test Results

Testing for First Article will be performed by the Government. The following are the tests that will be performed:

2.3.2.1 Visual Inspection

The contractor shall perform a visual inspection on each first article units submitted. The inspection will be used to identify scratches, dents, paint chips, peeling paint, and any anomalous conditions. This inspection by itself will not be used to disposition the first article submission.

2.3.2.2 Dimensional Inspection

A dimensional inspection will be conducted by Receipt Inspection on each first article submitted. The inspection will measure the two critical, 23 major, and all minor characteristics per drawing 1638AS300. Failure to meet any critical, major, or minor dimensional characteristic will result in the rejection of the first article lot.

2.3.2.3 Salt-Fog Test

A salt-fog test will be conducted on five of the ten first article test units after completion of Steps 2.3.2.1, 2.3.2.2, and 2.3.2.4 by the Government. This inspection will test for corrosion after exposure to 196 hours of an aqueous salt solution and a 24-hour drying period in accordance with MIL-STD-810G, Change Notice 1, Method 509.6. The visual inspection of Section 2.3.1 will be repeated after the salt fog testing. A motor tube will fail this test if the chemical conversion coating or paint blisters, peels, flakes, or otherwise shows any sign of corrosion. Failure to meet corrosion resistance requirement will result in the rejection of the first article lot.

2.3.2.4 Hydrostatic Pressure Test

A hydrostatic pressure test will be performed on all five of the first article units by the Government. This test will subject each motor tube to 3,500 50 psig for a minimum of 30 seconds. Evidence of leakage, pressure drop, or permanent deformation during this test will result in the rejection of the first article lot.

2.4 Production Work

2.4.1 Testing of Aluminum Alloy

If a change in aluminum alloy manufacturer is made from previous production work, all first-article testing called out in Section 2.3 shall be performed by the contractor and at the contractor’s expense. All first-article test results shall be submitted to the procuring activity for acceptance before production can start.

2.4.2 Certificates of Analysis

The contractor shall provide a lot acceptance test report and certificates of analysis summarizing all the data collected per the document provided in Section 2.3.2 (First Article). The dimensional attributes for the two critical for all motor tubes and a sampling plan for the dimensional attributes of the 24 major and all minor characteristics shall be included in the test report. These reports are a deliverable per CDRL A002.

3.0 QUALITY ASSURANCE PROVISIONS

3.0.1 Responsibility for Inspection

Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may utilize his own facilities or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in the specifications or drawings. The test procedures called out in drawing 1638AS301 or this statement of work are the standards by which all testing shall be performed.

3.0.2 Government Inspection of Facilities

The Government, through any authorized representative, may visit the plant or plants of the contractor or of any subcontractors engaged in the performance of this contract.

If the Government on the premises of the contractor/subcontractor makes any examination/test, the contractor shall provide and require subcontractors to provide all reasonable facilities and assistance for the safety and convenience of the Government inspectors in the performance of their duties. All examinations and tests by the Government shall be performed in such a manner as will not unduly delay work.

Production motor tube inspection/acceptance will be made at source by a DCMA representative.

3.1 Material Certification

The Contractor shall submit a Certificates of Compliance in accordance with DI-MISC-81356A per CDRL A006 to accompany the shipment of each lot, as required in Table 1 below. The certificate shall state compliance of the material with its respective drawing or specification, the approved acceptance test and inspection plans from SOW 3.2.1, and contract/order requirements. The certificate shall, as a minimum, state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a Certificates of Analysis in accordance with DI-MISC-82386 per CDRL A002, showing the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing in PWS 3.2.1, and as required in Table 3 below. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate.

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Table 1. Material Cert Requirements

Test
Requirement
Certificate
CDRL
Dwg
Location
Material
1638AS301
Note 2
CoA
A002
Inspection
1638AS301
Note 3
CoC
A006
Hydrostatic Test
1638AS301
Note 10
CoA
A002
Hydrostatic Test
1638AS301
Note 10
CoC
A006
Chemical Conversion Coat
1638AS301
Note 11
CoC
A006
Paint
1638AS301
Note 13
CoC
A006
Stamp / Engrave
1638AS301
Note 14
CoC
A006
Wall Thickness
1638AS301
Note 15
CoC
A006

4.0 DELIVERABLES

Documentation deliverables as specified herein shall be delivered to the Technical Point of Contact, for arrangement of review and approval/acceptance

Deliverables

Deliverable
Quantity
Due
Motor Tube (First Article)
10
40 weeks after contract award
Motor Tube (Base Production)
550
12 weeks after receipt of order
Motor Tube (Option Year)
550
36 weeks after receipt of order
CDRL A001 Final Inspection Plan
1
With each delivery/lot
CDRL A002 Certification of Analysis for Motor Tubes
1
With each delivery/lot
CDRL A002 Certification of Analysis of Aluminum Alloy
1
With each delivery/lot
CDRL A002 Certification of Analysis for Heat Treatment
1
With each delivery/lot
CDRL A002 Certification of Analysis for Hydrostatic Test
1
With each delivery/lot
CDRL A002 Certificate of Analysis for Dimensional Inspection
1
With each delivery/lot
CDRL A003 Request for Variance
As Required
CDRL A004 Quality Assurance
As Required
30 days after contract award for first submission
CDRL A005 Progress Reports
As Required
Monthly
CDRL A006 Certificates of Compliance
As Required
With each delivery/lot

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-209-H002 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (OCT 2018)

(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used. The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "First Article Approval--Government Testing" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements.

(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.

(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Government Testing", the First Article shall not be delivered as part of the production quantity.

C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018)

If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):

(Offeror to fill in contract number(s), as applicable. See Section M)

(End of Text)

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No. .

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

*To be filled in at time of award.

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above; and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-242-H002 POST AWARD MEETING (NAVSEA) (OCT 2018)

(a) A post-award meeting with the successful offeror will be conducted within [ * ] days after award of the [contract / task order]. The meeting will be held at the address below:

Location/Address: [ * ]

(b) The contractor will be given [ * ] working days notice prior to the date of the meeting by the Contracting Officer.

(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the [contract / task order].

(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out. Specific topics shall be mutually agreed to prior to the meeting.

[ * ] To be specified at [contract / task order] award.

C-244-H002 SUBCONTRACTORS/CONSULTANTS (NAVSEA) (FEB 2023)

In addition to the information required by FAR 52.244-2(e) of the contract, when consent to subcontract is required per FAR 52.244-2, the contractor shall also include the following information in requests to add subcontractors or consultants during performance:

(1) Impact on subcontracting goals,

(2) Impact on providing support at the contracted value,

(3) IF SEAPORT TASK ORDER - The results of negotiations to incorporate fee rate caps no higher than the lower of (i) SeaPort NXG fee rate caps for the prime contractor, or in the case where the proposed subcontractor is also a SeaPort NXG prime, (ii) fee rate caps that are no higher than the subcontractor's prime SeaPort NXG contract.

C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)

The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

(End of text)

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.

D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor
(2) contract number
(3) sponsor:

(Name of Individual Sponsor)

(Name of Requiring Activity)

(City and State)

D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)

For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)

Item(s) 0001 - 1001 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May 2018, Standard Practice for Commercial Packing.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

SPECIAL PACKAGING INSTRUCTIONS

Motor Tubes shall be packaged horizontally in a cardboard box. Each box should contain seven motor tubes. Up to seven boxes should be on a single pallet. Each pallet shall be permanently labeled with: “MK 85 Mod 0 Motor Hardware”, drawing number with revision, item description or component part name, manufacturer name, contract number, lot number per MIL-STD-1168, quantity per palette, and weight. Pallets of components shall be stretch wrapped on pallets to commercial standards. Total pallet height is not to exceed 72 inches.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
1000
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-11
Higher-Level Contract Quality Requirement
DEC 2014
52.246-15
Certificate of Conformance
APR 1984
52.246-16
Responsibility For Supplies
APR 1984

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)

The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

E-246-H023 QUALITY REQUIREMENT FOR SOFTWARE DEVELOPMENT OR PRODUCTION (NAVSEA) (JAN 2019)

The contractor's software quality program shall be an integral part of the overall Quality Management System. Software quality program controls shall be applicable to all project software that is developed, maintained, or modified within the following categories:

(a) All deliverable software

(b) All deliverable software that is included as part of deliverable hardware or firmware.

(c) Non deliverable software (commercially available or user-developed) used for development, fabrication, testing, or acceptance of deliverable software or hardware (includes automated fabrication, test, and inspection/acceptance equipment software and software design, test, and inspection tools).

(d) Commercially available, reusable, or Government software designated as part of a deliverable item.

E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018)

(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).

(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Beneath the signature include the typed name of the individual signing this certificate.

(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.

(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.

(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(g) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________

E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018)

(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).

(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Beneath the signature include the typed name of the individual signing this certificate.

(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.

(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.

(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(g) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________

E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)

(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.

(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(d) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________

E-246-W003 INSPECTION STANDARDS (NAVSEA) (OCT 2018)

Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4-2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.

E-246-W005 SAMPLING OF RECEIVED MATERIAL – MAN-RATED MATERIAL (NAVSEA) (MAY 2021)

(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects man-rated material under this contract for catapults, cartridge actuated devices, propellant actuated devices and their related component parts, the sampling plan utilized shall be as outlined in the applicable technical data package or as otherwise specified in other controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined by one of the following:

|X| ASQ Z1.4 (ANSI/ASQ Z1.4 -2003 (R2018):

Critical: 100% Major: Level II Minor: Level I |_| MIL-STD-1916 (DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14):

Critical: Level V Major: Level II, N < 200 Level III, N > 200 Minor: Level I, N < 100 Level II, N > 100

(b) In all cases, the acceptance number of defects will be ZERO (0); the lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.

(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
40 wks. ADC
10
NSWC IHD

RECEIVING

4522 MCMAHAN ROAD B116

INDIAN HEAD MD 20640-5125

301-744-4221 FOB: Destination N00174

0002
12 wks. AFATA
550
(SAME AS PREVIOUS LOCATION)

N00174

0003
12 wks. ADC
1
N/A
1000
36 wks. ADC
550
NSWC IHD

RECEIVING

4522 MCMAHAN ROAD B116

INDIAN HEAD MD 20640-5125

301-744-4221

N00174

1001
36 wks. ADC
1
N/A
52.211-8
Time of Delivery
JUN 1997
52.211-17
Delivery of Excess Quantities
SEP 1989
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991

F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018)

In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .