CPCSOWDraft.pdf

PDF 52 KB Posted

Attached to
Closure Protective Covers (CPC's) Federal contract opportunity
Solicitation number
N00174-15-R-0015
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Draft SOW for the acquisition of Closure Protective Covers (CPCs) in support of the Tomahawk AUR Program.

View the file

Other files for this federal contract opportunity

Other files attached to Closure Protective Covers (CPC's), newest first.
File Type Posted
Amendment0003.pdf PDF
Amendment0002.pdf PDF
Amendment0001.pdf PDF
N0017415R0015.pdf PDF
Closure_Protective_Covers_-_PastPerformanceMatrix.doc DOC document
Closure_Protective_Covers_-_PASTQUES-LP-TA.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK – WPN Appropriation

FY 2013 Support Services for the TOMAHAWK Weapon System Provided by

NSWC Indian Head Explosive Ordnance Disposal Technology Division Naval Packaging, Handling, Storage and Transportation Center

Detachment Picatinny

1.0 BACKGROUND AND PURPOSE

The mission of the Naval Packaging, Handling, Storage and Transportation (PHST) Center is to provide testing, engineering and technical support for PHST for all naval ordnance.

For this SOW, NSWC IHEODTD Det Picatinny is responsible for the logistics supportability requirements for Closure protective covers (CPC’s) required for shipping and storage of CLS Tomahawk Weapon System, which includes (CLS) All-Up-Rounds (AURs), and empty CLS Capsules. Funding is provided for NSWC IHEODTD Det Picatinny to procure a quantity of up to 80 CPC’s in accordance with the requirements drawing JCM-14865. This will fulfill CLS AUR Shipping and Storage requirements. Procurement includes manufacture and delivery of the closure protective covers.

2.0 SCOPE

NSWC IHEODTD Det Picatinny has been tasked with the acquisition of CPCs in support of the Tomahawk AUR Program. CPCs are used to protect the Tomahawk CLS Capsule Closure Assembly during AUR handling, shipping and storage. The purpose of this contract is to manufacture, test, inspect, and deliver up to eighty CPCs.

3.0 APPLICABLE DOCUMENTS

The following documents form a part of the SOW:

Drawings:

JCM-14865 Cover Assembly, Closure Protective

Specifications:

MIL-STD-31000 Technical Data Packages ASME Y14.100 Engineering Drawing Practices ASME Y14.24 Types and Applications of Engineering Drawings ASME Y14.34M Engineering Drawing and Related Documentation Practices ASME Y14.35M Revision of Engineering Drawings and Associated Documents

Documents

NAVSEA S9074-AR-GIB-010 Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair For Machinery, Piping and Pressure Vessels

4.0 REQUIREMENTS: The contractor shall provide facilities, fabrication services and material to produce up to eighty (80) Tomahawk CPC Assemblies, in accordance with the following paragraphs:

4.1 First Article

The contractor shall perform the First Article Test/Inspection (FATI) of the CPC components, in accordance with Applicable Documents provided in Paragraph 3.0 above. The Contractor shall be responsible for conducting FATI, which shall be performed at the Contractor’s facility.

The Government estimates that FATI will take up to eight (8) days to complete.

The first article shall be available for testing/inspection within one hundred-twenty (120) calendar days following the award of contract. The Government shall be notified at least fifteen

(15) calendar days prior to First Article Testing and reserves the right to observe testing.

First Article Test/Inspection requirements are as follows:

a. The Contractor shall verify that the first article meets or exceeds all the requirements of the manufacturing drawing packages, specifications and related parts list.

b. The first article will not be destroyed in testing, and shall be considered part of the total contract quantity.

The approved first article shall provide the baseline for the remaining production units.

4.2 Production Quantity

The Contractor shall manufacture up to eighty (80) CPCs, in accordance with the methods, procedures, and material used to develop the first article.

5.0 GOVERNMENT FURNISHED INFORMATION (GFI)

Documentation provided in accordance with Paragraph 3.0 above is required for the performance of tasks described per Paragraphs 4.1 and 4.2 above.

6.0 GENERAL INFORMATION

The majority of tasking will be performed at NSWC Indian Head EODTD Det Picatinny and vendor facilities.

7.0 PERIOD OF PERFORMANCE

Period of Performance: 30 Sep 2015.