N00173-23-R-GD01 31 Mar 2023.docx

DOCX document 162 KB Posted

Attached to
Optical and RF Payload Systems Development Support and Integration Federal contract opportunity
Solicitation number
N00173-23-R-GD01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

View the file

Other files for this federal contract opportunity

Other files attached to Optical and RF Payload Systems Development Support and Integration, newest first.
File Type Posted
N00173-23-R-GD01 0002.docx DOCX document
Questions and Answers 1.docx DOCX document
N00173-23-R-GD01 0001.docx DOCX document
Exhibit A - CDRLs.pdf PDF
Attachment 2 - SOW.doc DOC document
Attachment 3 - Past Performance Questionnaire.pdf PDF
Attachment 5 -SBPCD.pdf PDF
Attachment 4 - Cost Spreadsheet.xlsx XLSX spreadsheet
Attachment 1 - Personnel Qualifications.docx DOCX document
Attachment 6 -Direct Labor Rate Substantiation.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0017323RGD01

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

R&D Labor

CPFF

The Contractor shall furnish all labor required to accomplish the scope of work pursuant to the Statement of Work.

FOB: Destination

PSC CD: AR13

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Other Direct Costs

COST

Other Direct Costs in support of CLIN 0001. None fee bearing.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Data - NSP

FFP

Data for CLIN 0001. Exhibit A, Not Separately Priced (NSP)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Contractor Acquired Property (CAP)

FFP

IAW FAR 52.245-1, delivery of all property acquired by the contractor under this IDIQ. NSP

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00
$1,000,000.00
1.00
$70,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00
$10,000.00
1.00
$70,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

SECTION B NOTES

B-1 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.

(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

B-2 CONTRACT TYPE

This is a cost-plus-fixed-fee (CPFF), indefinite-delivery, indefinite-quantity contract vehicle. The contract will contain provisions for Task Orders (TOs) to be awarded on a CPFF basis. The contract shall have an ordering period from date of contract award through sixty (60) months thereafter.

B-3 FIXED FEE

The fee percentage of __ (offeror to fill in their proposed fee percentage) is fixed for all Task Orders issued against this IDIQ.

Section C - Descriptions and Specifications

STATEMENT OF WORK

The statement of work is provided as Attachment 2.

The work and services to be performed hereunder shall be subject to the requirements and standards contained in Attachment 2, Statement of Work, Exhibit A, Contract Data Requirements List, and all other Attachments cited in Section J, which are incorporated by reference into Section C.

Section D - Packaging and Marking

SECTION D NOTES

D-1 UNCLASSIFIED PACKAGING AND MARKING

All unclassified data and deliverable contract line items shall be preserved, packaged, packed and marked and must conform to normal commercial packing standards to assure safe delivery at destination.

D-2 CLASSIFED PACKAGING AND MARKING

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated February 28, 2006 and the DD 254 - Contract Security Classification Specification.

D-3 MARKING OF SHIPMENTS AND REPORTS

The Contractor shall mark all shipments under this contract in accordance with the addition of ASTM-D-3951-20 “Standard Practice for Commercial Packaging” in effect on the date of the contract.

The Contractor shall comply with FED STD 313 (Symbols for Packages and Containers for Hazardous Industrial Chemical and Materials) to the extent applicable.

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report: *

(1)Name and business address of the Contractor
(2)Contract number
(3)Task order number

*To be completed at the Task Order level, when applicable.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE NOTE

E-1 Inspection and acceptance will be accomplished by the COR designated at the TO level. Inspection and acceptance will be performed at the location stated in the TO.

Constructive acceptance, in accordance with FAR 32.904, shall be deemed to have occurred on the 7th day after the final delivery.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-5
Inspection Of Services Cost-Reimbursement
APR 1984
52.246-9
Inspection Of Research And Development (Short Form)
APR 1984

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 31-OCT-2023 TO

30-OCT-2028

N/A
N/A
0002
POP 31-OCT-2023 TO

30-OCT-2028

N/A
N/A
0003
POP 31-OCT-2023 TO

30-OCT-2028

N/A
N/A
0004
POP 31-OCT-2023 TO

30-OCT-2028

N/A
N/A
52.242-15
Stop-Work Order
AUG 1989
52.242-15 Alt I
Stop-Work Order (Aug 1989) - Alternate I
APR 1984
52.247-34
F.O.B. Destination
NOV 1991

SECTION F NOTES

F-1 GOVERNMENT FURNISHED PROPERTY

As applicable, a list of GFP will be incorporated into the task order(s) via attachment, along with the following information:

· The GFP will be provided by (Insert date).

· The Government shall deliver the GFP to the following address: (Insert location)

· Upon completion of the award, the GFP will be returned to (Insert location or TBD, if not known upon issuing the award).

(To be completed at the Task Order level, when applicable)

F-2 SHIP TO INFORMATION

All deliverables required under each Task Order shall be shipped to the address specified in Section F of the requisite Task Order.

Task Orders will delineate the following:

All shipments delivered by the Contractor to the Government under this Task Order shall include the following “Attention To” on the shipping label: *

Contracting Officer’s Representative:* Contract Number:* Task Order Number:

Building:* Code:* Address:*

(*To be completed at Task Order, when Applicable)

F-3 ORDERING PERIOD

This is an IDIQ Type Contract with a five year ordering period for each CLIN from the effective date of the contract. Each task order shall specify a specific period of performance.

Section G - Contract Administration Data

SECTION G NOTES

G1 - ADMINISTRATION INFORMATION

In order to expedite administration of this contract, the following delineation of duties is provided including the names and contact information for each individual or office specified. Contact the individual/position designated as having responsibility for any questions, clarifications or information regarding the functions assigned herein.

The Contract Administration Office (CAO) designated in Block 24 on the Standard Form 33 is responsible for all matters specified in FAR 42.302(a) and DFARS 242.302(a), except in those areas otherwise designated herein.

Contract Specialist
Graham Irby, Code 1330, Email Address: Graham.Irby@nrl.navy.mil
NRL Competition Advocate
To be provided at award
Security Matters
Contracting Officer Representative for Security, Code 1226, (202) 767-2240, DSN 297-2240, email security-group@nrl.navy.mil.
Safety Matters
Head Safety Branch, Code 3540, (202)767-2232, safety@nrl.navy.mil
Patent Matters
Associate Counsel (Intellectual Property), Code 1008.2, (202) 404-1552, DSN 297-1552, email patents@nrl.navy.mil.
Release of Data
Public Affairs Officer, Code 1030, (202) 767-2541, DSN 297-2541, email nrl1030@ccs.nrl.navy.mil. For FOIA information, see https://www.nrl.navy.mil/foia/.

The Contract Administration Office (CAO) designated in Block 24 on the Standard Form 33 is responsible for all matters specified in FAR 42.302(a) and DFARS 242.302(a), except in those areas otherwise designated herein.

Contract administration functions withheld, additional contract administration functions assigned, or special instructions are set forth below:

NONE

G2 - PAYMENT INSTRUCTIONS FOR MULTIPLE ACCOUNTING CLASSIFICATION CITATIONS (COST-REIMBURSEMENT) In accordance with PGI 204.7108, clauses 252.204-0001 through 0011 are not applicable to this contract; therefore, use PGI 204.7108(d)(12) Other and pay as follows: If there is more than one ACRN within a contract line item, the payment office will make payment using the ACRN(s) cited on the contractor's invoice. The non-standard clause (d)(12) "Other" provides a significantly better reflection of how funds will be expended in support of contract performance. One sponsor's funds cannot be used to fund another sponsor’s program.

Based on the type of work contracted for on behalf of DOD/Navy customers, payment by CLIN/SLIN/ACRN is significantly important and using any of the payment method specified in the table identified in PGI 204.7108(b)(2) would result in the funding resources of one customer being paid for work received by another customer. The contractor completes the effort in a fluid environment; therefore, in order to accurately track and account for funding expenditures in accordance with the specific tasking associated with each funding line, payment instruction (d)(12) "Other" applies as expenditures must reflect the actual work performed, in alignment with the type of funding to avoid violations to the Anti-Deficiency Act.

Payment shall be made in accordance with the Contracting Officer/DCAA approved billing whereby the contactor shall include identification of the CLIN, SLIN, and ACRN on each invoice. This will allow for appropriate contractor invoicing based on the unique customer requirement funding and Contracting Officer's instructions. This approach also allows for proper matching of the charge to the activity that have received the service/product with the application of the payment to the corresponding entity.

G3 - INFORMATIONAL SUBLINE ITEMS

It is anticipated that the research and development services performed under this contract will be paid for from multiple sources of funds. Informational subline items will be established as necessary to identify each accounting citation classification.

G4 - REPORTING REQUIREMENTS AT THE CONTRACT LEVEL

0. The Contractor shall submit required reports to the Contracting Officer’s Representative (COR) electronically. Report formats, instructions and submittal dates can be found in Exhibit A, DD-1423, Contract Data Requirements List.

0. From time to time, the Government may require brief, informal, special reports or information associated with the overall administration at the contract level. The NRL Procuring Contracting Officer shall notify the Contractor’s representative of the specific reporting requirements and establish a mutually acceptable response time and format.

0. The Contractor shall report actual subcontracting information on Individual Subcontract Reports (ISRs) submitted through eSRS in accordance with the small business subcontracting plans.

G-5 TECHNICAL DIRECTION MEMORANDUM (TDM)

(a) For the purposes of this clause, technical direction includes the following:

Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise describes work which will accomplish the objectives described in the statement of work;

Guidelines to the Contractor, which assist in interpretation of drawings, specifications or technical portions of, work description.

(b) Technical instructions must be within the scope of work stated in the contract. Technical instructions may not be used to:

(1) Assign additional work under the contract:

(2) Direct a change as defined in the contract clause entitled "Changes";

(3) Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or

(4) Change any of the terms, conditions or specifications of the contract

(c) The TDM shall be written by the Contracting Officer’s Representative (COR), with the original given to the Contractor and a copy retained in the CORs file. Technical direction may be issued orally only in emergency situations. If technical direction is issued orally, a TDM must follow within two (2) working days from the date of the oral direction. Amendments, corrections, or changes to TDMs shall also be in written format and shall include all the information set forth in paragraph (e) below.

(d) A TDM shall be considered issued when the Government submits it electronically to the Contractor.

(e) TDMs shall include, at a minimum, the following information:

(1) Date of TDM,

(2) Contract Number,

(3) Reference to the relevant portion or item in the Statement of Work,

(4) The specific technical direction or clarification,

(5) The type of work to be performed, i.e., (a) SETA support or (b) R&D work,

(6) A reference to the appropriate CLIN or SubCLIN,

(7) The anticipated level of effort, materials and travel expected as a result of the TDM,

(8) The JON, Program Element, and associated dollar amount, and

(9) The signature of the COR

(f) Each TDM is included in the contract file and maintained for two (2) years after the final contract completion date.

(g) The only individual authorized in any way to amend or modify any of the terms of this contract shall be the Contracting Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the Contracting Officer in writing within ten (10) working days after its receipt.

G-6 ORDERING PROCEDURES

The following procedure shall be followed when placing task orders under this contract:

(a) Only properly appointed Contracting Officers employed at the Naval Research Laboratory (NRL) shall issue task orders under this contract.

(b) A DD Form 1155 will be issued for each task order. The DD Form 1155, "Order for Supplies or Services," shall constitute the instrument for the placement of requirements under this contract.

(c) Task orders under this contract will be issued on a cost-plus-fixed-fee basis and may be either completion or term form (see FAR 16.306). Each task order shall be subject to either FAR 52.232-20 Limitation of Cost or FAR 52.232-22 Limitation of Funds, as appropriate. Each term form task order is subject to the terms and conditions of the clause in Section H entitled, "H-2 Level of Effort".

(d) Prior to the issuance of a task order, the contractor will be provided with the statement of work and other submission instructions and shall promptly submit a cost proposal and other requested information for performing the work.

(e)Task orders issued may include, but not be limited to, the following information:

(1) Date of Order

(2) Contract Number and Task Order Number

(3) Accounting and Appropriation Data

(4) Description of the Work to be Performed

(5) Level of Effort (if applicable)

(6) DD Form 1423 (Contract Data Requirements List)

(7) Place of Performance

(8) Period of Performance

(9) Estimated Cost Plus Fixed Fee

(10) DD Form 254 (Contract Security Classification Specifications)

(11) List of Government furnished material and the estimated value thereof for each order.

G-7 CONTRACTING OFFICER’S REPRESENATIVE (COR) — FUNCTIONS AND LIMITATIONS

(a) *, * is hereby designated as the Contracting Officer's Representative (COR). Unless terminated sooner, this appointment is effective for the 5-year ordering period. COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the Contracting Officer, who will modify the contract to reflect the change of COR assignment. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the Contractor via contract modification. Each Task Orders issued under this IDIQ will have a designed COR.

(b) The responsibilities and limitations of the COR are as follows:

(1) Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the Contractor how to perform the work.

(2) Submitting interim and final Contractor Performance Assessment Reports (CPARS) at www.cpars.csd.disa.mil/cparsmain.htm.

(3) Quality assurance of services performed or deliveries made

(4) Inspection and acceptance of services or deliverables

(5) Ensuring that Government Furnished Property, to include any Contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.

(6) Security requirements on Government installation, such as the request and retrieval of personnel security badges and vehicle passes.

(7) Monitoring Contractor's performance and promptly report problems and recommendations for corrective action to the PCO.

(8) Annually, furnish a written report on performance of the Contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.

(9) Attend post award conference, if conducted.

(10) Ensuring a copy of all Government technical correspondence, to include Technical Direction Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.

(11) Monitoring of funds expended

(12) Ensuring that the Contractor does not exceed the defined statement of work set forth in the contract.

(c) Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or the statement of work/specifications, a modification must be issued in writing and signed by the Contracting Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting Officer.

(*To be filled in at time of award and with each Task Order award)

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1, or as specified per task order

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
TBD
Issue By DoDAAC
N00173
Admin DoDAAC**
TBD
Inspect By DoDAAC
N00173
Ship To Code
N00173/
Ship From Code
____
Mark For Code
____
Service Approver (DoDAAC)
N00173
Service Acceptor (DoDAAC)
N00173
Accept at Other DoDAAC
____
LPO DoDAAC
____
DCAA Auditor DoDAAC
____
Other DoDAAC(s)
____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Donna Dargan; donna.dargan@nrl.navy.mil; 202-767-0547

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

SECTION H NOTES

H-1 KEY PERSONNEL

(a) The Contractor agrees to assign to the contract tasks those persons whose resumes were submitted with its proposal and who are necessary to fulfill the requirements of the contract as "key personnel". No substitutions may be made except in accordance with this clause.

(b) The Contractor understands that during the first ninety (90) days of the contract performance period, no personnel substitutions will be permitted unless these substitutions are unavoidable because of the incumbent's sudden illness, death or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information described in paragraph (c) below. After the initial ninety (90) day period the Contractor must submit to the Contracting Officer all proposed substitutions, in writing, at least thirty (30) days in advance (sixty (60) days if security clearance must be obtained) of any proposed substitution and provide the information required by paragraph (c) below.

(c) Any request for substitution must include a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information requested by the Contracting Officer. Any proposed substitute must have qualifications equal to or superior to the qualifications of the incumbent. The Contracting Officer or his/her authorized representative will evaluate such requests and promptly notify the Contractor of his/her approval or disapproval thereof.

(d) In the event that any of the identified key personnel cease to perform under the contract and the substitute is disapproved, the contract may be immediately terminated in accordance with the Termination clause of the contract.

(e) The following individuals are identified as key personnel in the base award:

Key Personnel Labor Categories
Key Person

Systems Engineer

Electrical Engineer

Computer Scientist

Program Manager

Mechanical Engineer

(f) Key personnel may be additionally defined at the task order level, which will supercede this list, as applicable.

H-2 LEVEL OF EFFORT

(a) In the performance of each term form TO issued under this contract, the Contractor agrees to provide the level of effort specified in the TO and in accordance with this provision.

(b) It is understood and agreed that the rate of direct labor hours expended each month may fluctuate in pursuit of the technical objective, provided such fluctuation does not result in the use of the total hours of effort prior to the expiration of the term of the TO. The Contractor is required to notify the Contracting Officer when 85% of the total level of effort of the TO has been expended.

(c) If, during the term of the TO, the Contractor finds it necessary to accelerate the expenditure of direct labor under the Task Order to such an extent that the total hours of effort specified would be used prior to the expiration of the term, the Contractor shall notify the Contracting Officer in writing setting forth the acceleration required, the probable benefits which would result, and an offer to undertake the acceleration at no increase in the estimated cost or fixed fee together with an offer setting forth a proposed level of effort, cost breakdown, and proposed fixed-fee for continuation of the work until expiration of the term of the TO. If the maximum amount specified in the contract is not adequate to accommodate the anticipated accelerated expenditure of direct labor, the Contractor shall also include in its offer a proposed increase of the maximum amount, cost breakdown, and proposed fixed-fee for the increase. The offer shall provide that the work proposed will be subject to the terms and conditions of this contract and any additions or changes required by current law, regulations, or directives, and that the offer, with a written notice of acceptance by the Contracting Officer, shall constitute a binding contract. The Contractor shall not accelerate any effort until receipt of such written approval by the Contracting Officer. Any agreement to accelerate will be formalized by modification of the order and, if necessary, the contract.

(d) The Contracting Officer may, by written order, direct the Contractor to accelerate the expenditure of direct labor under a TO such that the labor hours of effort specified therein would be used prior to the expiration of the term. This order shall specify the acceleration required and the resulting revised term. The Contractor shall acknowledge this order within ten days of receipt.

(e) If the total level of effort specified in each TO is not provided by the Contractor during the term of the TO, the Contracting Officer shall either

(i) reduce the fixed fee of the TO as follows:

Fee Reduction = Fixed Fee X (Required LOE Hours - Expended LOE Hours) Required LOE Hours or;

(ii) subject to the provisions of the clause of this contract entitled "Limitation of Cost," require the Contractor to continue to perform the work until the total number of hours of direct labor specified in the DO/TO shall have been expended, at no increase in the fixed fee of the TO.

(f) In the event the Government fails to fully fund the TO in a timely manner, the term of the TO may be extended accordingly with no change to cost or fee. If the Government fails to fully fund the TO, the fee will be adjusted in direct proportion to that effort which was performed.

(g) Notwithstanding any of the provisions of the above paragraphs, the Contractor may furnish labor hours up to five percent in excess of the total direct labor hours specified in the TO provided that the additional effort is furnished within the term hereof, and provided further that no increase in the estimated cost or fixed-fee is required, and no adjustment in the fixed-fee shall be made provided that the Contractor has delivered at least 95% of the level of effort specified in the TO.

(h) It is understood that the mix of labor categories provided by the Contractor under the TO, as well as the distribution of effort among those categories, may vary considerably from the initial mix and distribution of effort, which was estimated by the Government or proposed by the Contractor.

(i) Nothing herein shall be construed to alter or waive any of the rights or obligations of either party pursuant to the Clause entitled "Limitation of Costs" or "Limitation of Funds," either of which incorporated herein applies to each TO under this contract

(j) The level of effort * will be provided at the Task Order level.

(*To be completed at the task order level, if applicable)

H-3 GOVERNMENT PROPERTY

(a) Government-Furnished Equipment. Government-furnished equipment, data, or services shall be identified and handled in accordance with Section F – Government Furnished Property of this task order.

(b) Contractor Acquired Property. In the event the contractor is required to purchase property in the performance of this task order, compliance with the procedures of FAR Part 45.402, Government Property and CLIN 0004 is required.

(c) Disposition of Government Property. Thirty (30) days prior to the end of the Task Order period of performance, or upon termination of the Task Order, the contractor shall furnish to the COR a complete inventory of all Government Property in his possession under the Task Order that has not been tested to destruction, completely expended in performance, or incorporated and made a part of a deliverable end item. The COR will furnish disposition instructions on all listed property which was furnished or purchased under the Task Order.

H-4 ORGANIZATIONAL CONFLICTS OF INTEREST

(a) Definitions.

The term “contractor” includes the Contractor and its employees, affiliates, marketing consultants (if any), consultants, and subcontractors at all tiers.

“Organizational Conflict of Interest” (“OCI”) means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. FAR 2.101. An OCI may result when (1) activities or relationships create an actual or potential conflict of interest related to the performance of the Statement of Work (SOW) ofthis Contract; or, (2) when the nature of the SOW on this Contract creates an actual or potential conflict of interest with respect to the Contractor in relation to a future acquisition.

“Marketing consultant,” means any independent contractor who furnishes advice, information, direction, or assistance to an offeror or any other contractor in support of the preparation or submission of an offer for a Government contract by that offeror. An independent contractor is not a marketing consultant when rendering— (1) Services excluded in FAR Subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or facilities); (3) Routine legal, actuarial, auditing, and accounting services; and (4) Training services.

(b) In accordance with the guidance in FAR Subpart 9.5, the Contracting Officer has determined that potentially significant organizational conflicts of interest (OCIs) could result if the Contractor is allowed to participate (at any level) in future Federal Government acquisitions that include requirements that may be established or affected by the performance of the Statement of Work (SOW) by the Contractor under this Contract.

(c) It is understood and agreed that the Contractor may be ineligible (unless expressly exempted as provided in FAR Part 9.5) to act as a prime contractor, subcontractor, or consultant or subcontractor to any prime contractor or subcontractor at any tier, for any future requirements (for services, systems, or components of systems) procured by any Federal Government activity where the Contractor, in performance of the SOW under this Contract, has provided or is providing support (as described in FAR 9.505-1 through 9.505-4) that establishes or affects future requirements or may affect the future competition.

(d) The contracting officer responsible for securing future requirements, in his/her sole discretion, may make a determination to exempt the Contractor from ineligibility as described in subparagraph (c) above provided the Contractor submits an acceptable mitigation plan.

(1) Items for consideration in a mitigation plan include the following: identification of the organizational conflict(s) of interest; a reporting and tracking system; an organizational conflict of interest compliance/enforcement plan, to include employee training and sanctions, in the event of unauthorized disclosure of sensitive information; a plan for organizational segregation (e.g., separate reporting chains); data security measures; and, non-disclosure agreements.

(2) The Government's determination regarding the adequacy of the mitigation plan or the possibility of mitigation is a unilateral decision made solely at the discretion of the Government and is not subject to the Disputes clause of the contract. The Government may terminate the contract for default if the Contractor fails to implement and follow the procedures contained in any approved mitigation plan.

(3) Nothing contained herein shall preclude the contracting officer in future Federal Government acquisitions from making his/her own determination as to whether an OCI exists and whether any such OCI has been successfully mitigated.

(e) The Contractor shall apply this clause to any subcontractors or consultants who: have access to proprietary information received or generated in the performance of this Contract; and/or, who participate in the development of data, or participate in any other activity related to this Contract which is subject to the terms of this clause at the prime contractor level.

(f) The Contactor agrees that it and its subcontractors at all levels shall use reasonable diligence in protecting proprietary data/information that is received or generated in performance of this Contract in accordance with this clause and any other clause of this Contract pertaining to the nondisclosure of information. The Contractor further agrees that neither it nor its subcontractors will willfully disclose proprietary data/information that is received or generated in the performance of this Contract without the prior permission of the Contracting Officer, and that proprietary information shall not be duplicated, used or disclosed, in whole or part, for any purpose other than to accomplish the work required by the Contract.

(g) The Contractor and its Subcontractors at all levels shall inform their employees that they are required to comply with the applicable requirements and restrictions contained in: restrictive markings applicable to data/information that they receive or generate in the performance of this Contract; FAR Subpart 9.5 pertaining to actual or potential OCIs; FAR 3.104 pertaining to requirements and restrictions under the Procurement Integrity Act; and, Defense FAR Supplement (DFARS) 252.204-7000 pertaining to “Disclosure of Information”.

(h) The Contractor agrees to enter into written agreements with all companies whose proprietary data it shall have access to and to protect such data from unauthorized use or disclosure as long as it remains proprietary. The Contractor shall furnish to the Contracting Officer copies of these written agreements. The Contractor agrees to protect the proprietary data and rights of other organizations disclosed to the Contractor during performance of this Contract with the same caution that a reasonably prudent Contractor would use to safeguard its own highly valuable property. The Contractor agrees to refrain from using proprietary information for any purpose other than that for which it was furnished.

(i) The Contractor shall not distribute reports, data or information of any nature received or arising from its performance under this Contract, except as provided by this Contract or as may be directed by the Contracting Officer.

(j) The Contractor agrees that if in the performance of this Contract it discovers a potential OCI, a prompt and full disclosure shall be made in writing to the Contracting Officer. This disclosure shall include a description of the actions the Contractor has taken, or proposes to take, to avoid or mitigate such conflicts.

Section I - Contract Clauses

52.202-1
Definitions
JUN 2020
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6
Restrictions On Subcontractor Sales To The Government
JUN 2020
52.203-7
Anti-Kickback Procedures
JUN 2020
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.203-13
Contractor Code of Business Ethics and Conduct
NOV 2021
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-2
Security Requirements
MAR 2021
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13
System for Award Management Maintenance
OCT 2018
52.204-18
Commercial and Government Entity Code Maintenance
AUG 2020
52.204-19
Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-21
Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.204-23
Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV 2021
52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-15
Defense Priority And Allocation Requirements
APR 2008
52.215-2
Audit and Records--Negotiation
JUN 2020
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-21 Alt II
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (NOV 2021) - Alternate II
OCT 1997
52.215-21 Alt IV
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (NOV 2021) - Alternate IV
OCT 2010
52.215-23
Limitations on Pass-Through Charges
JUN 2020
52.216-7
Allowable Cost And Payment
AUG 2018
52.216-8
Fixed Fee
JUN 2011
52.219-8
Utilization of Small Business Concerns
OCT 2022
52.219-9
Small Business Subcontracting Plan
OCT 2022
52.219-16
Liquidated Damages-Subcontracting Plan
SEP 2021
52.222-3
Convict Labor
JUN 2003
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-35
Equal Opportunity for Veterans
JUN 2020
52.222-36
Equal Opportunity for Workers with Disabilities
JUN 2020
52.222-37
Employment Reports on Veterans
JUN 2020
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
NOV 2021
52.222-54
Employment Eligibility Verification
MAY 2022
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-6
Drug-Free Workplace
MAY 2001
52.223-10
Waste Reduction Program
MAY 2011
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
JUN 2020
52.224-3
Privacy Training
JAN 2017
52.225-13
Restrictions on Certain Foreign Purchases
FEB 2021
52.227-1
Authorization and Consent
JUN 2020
52.227-1 Alt I
Authorization And Consent (JUN 2020) - Alternate I
APR 1984
52.227-10
Filing Of Patent Applications--Classified Subject Matter
DEC 2007
52.230-2
Cost Accounting Standards
JUN 2020
52.230-6
Administration of Cost Accounting Standards
JUN 2010
52.232-17
Interest
MAY 2014
52.232-18
Availability Of Funds
APR 1984
52.232-22
Limitation Of Funds
APR 1984
52.232-23
Assignment Of Claims
MAY 2014
52.232-25
Prompt Payment
JAN 2017
52.232-25 Alt I
Prompt Payment (Jan 2017) Alternate I
FEB 2002
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
OCT 2018
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
NOV 2021
52.233-1
Disputes
MAY 2014
52.233-3
Protest After Award
AUG 1996
52.233-3 Alt I
Protest After Award (Aug 1996) - Alternate I
JUN 1985
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.237-2
Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.242-1
Notice of Intent to Disallow Costs
APR 1984
52.242-3
Penalties for Unallowable Costs
DEC 2022
52.242-4
Certification of Final Indirect Costs
JAN 1997
52.242-5
Payments to Small Business Subcontractors
JAN 2017
52.242-13
Bankruptcy
JUL 1995
52.243-2
Changes--Cost-Reimbursement
AUG 1987
52.243-2 Alt I
Changes--Cost-Reimbursement (Aug 1987) - Alternate I
APR 1984
52.243-2 Alt V
Changes--Cost-Reimbursement (Aug 1987) - Alternate V
APR 1984
52.243-6
Change Order Accounting
APR 1984
52.244-5
Competition In Subcontracting
DEC 1996
52.244-6
Subcontracts for Commercial Products and Commercial Services
DEC 2022
52.245-1
Government Property
SEP 2021
52.245-9
Use And Charges
APR 2012
52.246-25
Limitation Of Liability--Services
FEB 1997
52.247-1
Commercial Bill Of Lading Notations
FEB 2006
52.249-6
Termination (Cost Reimbursement)
MAY 2004
52.249-14
Excusable Delays
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.203-7003
Agency Office of the Inspector General
AUG 2019
252.203-7004
Display of Hotline Posters
AUG 2019
252.204-7000
Disclosure Of Information
OCT 2016
252.204-7002
Payment For Contract Line or Subline Items Not Separately Priced
APR 2020
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004
Antiterrorism Awareness Training for Contractors.
FEB 2019
252.204-7009
Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
OCT 2016
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7007
Reporting of Government-Furnished Property
MAR 2022
252.215-7002
Cost Estimating System Requirements
DEC 2012
252.215-7008
Only One Offer
JUL 2019
252.215-7012
Requirements for Submission of Proposals via Electronic Media.
JAN 2018
252.217-7027
Contract Definitization
DEC 2012
252.219-7003
Small Business Subcontracting Plan (DOD Contracts)
DEC 2019
252.222-7006
Restrictions on the Use of Mandatory Arbitration Agreements
DEC 2010
252.223-7004
Drug Free Work Force
SEP 1988
252.223-7006
Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7001
Buy American And Balance Of Payments Program-- Basic
JUN 2022
252.225-7002
Qualifying Country Sources As Subcontractors
MAR 2022
252.225-7004
Report of Intended Performance Outside the United States and Canada--Submission after Award
OCT 2020
252.225-7012
Preference For Certain Domestic Commodities
APR 2022
252.225-7048
Export-Controlled Items
JUN 2013
252.226-7001
Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
APR 2019
252.227-7013
Rights in Technical Data--Noncommercial Items
FEB 2014
252.227-7014
Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation
FEB 2014
252.227-7016
Rights in Bid or Proposal Information
JAN 2011
252.227-7019
Validation of Asserted Restrictions--Computer Software
SEP 2016
252.227-7037
Validation of Restrictive Markings on Technical Data
APR 2022
252.231-7000
Supplemental Cost Principles
DEC 1991
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010
Levies on Contract Payments
DEC 2006
252.232-7017
Accelerating Payments to Small Business Subcontractors--Prohibition on Fees and Consideration
APR 2020
252.235-7010
Acknowledgment of Support and Disclaimer
MAY 1995
252.235-7011
Final Scientific or Technical Report
DEC 2019
252.237-7010
Prohibition on Interrogation of Detainees by Contractor Personnel
JUN 2013
252.239-7016
Telecommunications Security Equipment, Devices, Techniques, And Services
DEC 1991
252.242-7004
Material Management And Accounting System
MAY 2011
252.242-7005
Contractor Business Systems
FEB 2012
252.242-7006
Accounting System Administration
FEB 2012
252.243-7002
Requests for Equitable Adjustment
DEC 2012
252.244-7000
Subcontracts for Commercial Items
JAN 2021
252.244-7001
Contractor Purchasing System Administration
MAY 2014
252.245-7001
Tagging, Labeling, and Marking of Government-Furnished Property
APR 2012
252.245-7002
Reporting Loss of Government Property
JAN 2021
252.245-7003
Contractor Property Management System Administration
APR 2012
252.245-7004
Reporting, Reutilization, and Disposal
DEC 2017
252.247-7023
Transportation of Supplies by Sea
FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.203-3 GRATUITIES (APR 1984)

(a) The right of the Contractor to proceed may be terminated by written notice if, after notice and hearing, the agency head or a designee determines that the Contractor, its agent, or another representative--

(1) Offered or gave a gratuity (e.g., an entertainment or gift) to an officer, official, or employee of the Government; and

(2) Intended, by the gratuity, to obtain a contract or favorable treatment under a contract.

(b) The facts supporting this determination may be reviewed by any court having lawful jurisdiction.

(c) If this contract is terminated under paragraph (a) of this clause, the Government is entitled--

(1) To pursue the same remedies as in a breach of the contract; and

(2) In addition to any other damages provided by law, to exemplary damages of not less than 3 nor more than 10 times the cost incurred by the Contractor in giving gratuities to the person concerned, as determined by the agency head or a designee. (This subparagraph (c)(2) is applicable only if this contract uses money appropriated to the Department of Defense.)

(d) The rights and remedies of the Government provided in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or under this contract.

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall--

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.

The Contractor shall include the substance of…

This is the start of the file's text. The full file is on GovTribe.