AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this Amendment is to extend the closing date to May 20th, change delivery to 150 days ADC and clarify the salient characteristics.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016420Q0181
X 9B. DATED (SEE ITEM 11)
04-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-May-2020
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
J. BURKHART (812-854-2909)
BLDG 121
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016420Q0181
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION SF30 - SF 30 CONTINUATION SHEET
SUMMARY OF CHANGES
SECTION SAP - SAP CONTINUATION SHEET
The required response date/time has changed from 07-May-2020 12:00 PM to 20-May-2020 12:00 PM.
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
30-JUL-2020 1 NAVAL SURFACE WARFARE CENTER
CRANE DIV
M/F: NATHAN THOMAS (BLDG 3395)
BLDG 41 SE CENTRAL RECEIVING
300 HWY 361
CRANE IN 47522-5001
812-854-2694 FOB: Destination
N00164
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
120 dys. ADC to 150 dys. ADC
1 NAVAL SURFACE WARFARE CENTER
CRANE DIV
M/F: NATHAN THOMAS (BLDG 3395)
BLDG 41 SE CENTRAL RECEIVING
300 HWY 361
CRANE IN 47522-5001
812-854-2694 FOB: Destination
N00164
The following have been modified:
SALIENT CHARACTERISTICS
Salient Characteristics for Containers.
Delivery to NSWC Crane: 120 days ADC to 150 days ADC.
40’ ISO container with split storage/Insulated configuration
Certifications o Must have valid Container Safety Certificate (CSC) after all modifications o Must meet all ISO standards for freight containers for transportation on land and sea.
Size:
o Length: 40 ft o Width: 8 ft o Height 9 ft 6 in o Nothing shall protrude this size – HVAC and connections must be recessed
Slings o Sling Wire Rope Steel/Galvanized 4 leg, c/with master link assembly, legs ending in thimble eye.
(8) ISO Corner Fittings (4 top and 4 bottom)
The containers shall be split into two 20’ sections.
o 1 section shall be insulated o 1 section shall be used for storage.
20’ Insulated section requirements o Roxtec connections: Minimum of 20 cables. Objective 40 cables. Roxtex should be capable of handling varying cable sizes with some up to two inches.
o Power:
Must be able to accept from power from all of the possible power sources:
Single phase 208 VAC 50/60 Hz power sources.
2 phase 208 VAC 50/60 Hz power sources.
120VAC 50/60 Hz power sources.
2 phase 240VAC 50/60 Hz power sources.
Rated at or above 12KVA.
External junction box shall be installed for power connection to internal panel Must have connection for external ground Internal panel shall have breakers for Lights, HVAC, Outlets o Layout Two equipment racks each with 220 and 110 VAC outlets with up to 20 AMPS each. Racks should be capable of holding at least 500 lbs. Racks should be a commercially available height with as many U’s as possible.
Objective: Equipment racks should have shock/vibe isolation mounts Work bench(es) o Fire alarm system including the below items that can connect to external fire alarm system.
1 Smoke Detector installed 1 fire alarm sounder installed All wired to a junction box externally for wiring to main fire alarm panel.
Fire Extinguisher o General Alarm: General alarm bell installed inside the room and wired to an external junction box for wiring to vessel’s main General Alarm System.
o Public Address: PA Speaker installed inside the room and wired to an external junction box for wiring to vessel’s main PA system/Telephone.
o HVAC Threshold: 2 Ton cooling, Objective 3 Ton Cooling 5KW Heat Programmable thermostat o Lighting
(4) 4’ Long dimmable LED light fixtures and light switch o 36" Wide X 80" High Steel Man Door With Hardware, Fully Weather‐Stripped, Countersunk Within ISO With Lockable Brushed nickel entry grade Handle On Exterior And Interior.
o Insulated to approximately R10 or better
20’ Storage end requirements o Floor shall have tie downs loops or tracks in the floor
36" Wide X 80" High Steel Man Door With Hardware, Fully Weather‐Stripped, Countersunk Within ISO With Lockable Brushed nickel entry grade Handle On Exterior And Interior installed between storage section and insulated section
36" Wide X 80" High Steel Man Door With Hardware, Fully Weather‐Stripped, Countersunk Within ISO With Lockable Brushed nickel entry grade Handle On Exterior And Interior installed on the 20ft side of the storage section.
Color Gray
Layout and electrical drawings must be provided with solicitation response.
Example of an acceptable layout:
Work Bench
40'
20'
Recessed HVAC
& INPUT
LED Lights
Electrical Panel
ROXTEC
Equipment racks
Storage Section
Insulated Section
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER
DATE OF CONTRACT
CLIN 0001 1 120 to 150 days ADC
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER
DATE OF CONTRACT
CLIN 0001 1
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .