19Q0350_0001_ATT1.docx
DOCX document 13 KB Posted
- Attached to
- SOLE SOURCE - TT&E For FFP Repair: LRF Federal contract opportunity
- Solicitation number
- N0016419Q0350
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19Q0350_0001.pdf | ||
| 19Q0350_sol.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW FOR TT&E AND REPAIR TO LIKE NEW CONDITION OF
LASER RANGE FINDER ASSEMBLIES (LRFS);
SERIAL NUMBER (SN) 0009, 0015, 0003 AND 0005;
SIMPLIFIED ACQUISITION PROCEDURE (SAP)
IN SUPPORT OF AN/SAY-3 I-STALKER EQUIPMENT
TO SUPPORT ISEA ACTIONS
1.1. Contractor shall perform Test, Tear Down and Evaluation (TT&E) on internal Laser Range Finder Assemblies (LRF) SNs 0009, 0015, 0003 and 0005. LRFs will be shipped to the contractor in the exterior housing as Government Furnished Equipment (GFE). Only the internal LRF Ball PN 2395031-002 or L3 PN 25406019 require repair. The window assembly, bracket / mounts and housing do not require repair.
Contractor shall remove the internal LRF from the housing and perform TT&E on the LRF. Following TT&E, contractor shall provide repair proposals. Following TT&E, Contractor shall deliver Failure Summary Report IAW CDRL A001. Turn-around time for TT&Es shall be 30 days.
1.2. OPTIONS FOR REPAIR –
1.2.1. Options for Repair shall be exercised after repair proposals are received for SNs 0009, 0015, 0003 and 0005, once TT&E is completed, and actual price is determined.
1.2.2. Following Exercise of Options for Repair, Contractor shall repair the LRFs, Serial Number 0009, 0015, 0003 and 0005, to like new condition.
Contractor shall perform functionality test to ensure LRF repair has been successful. Contractor shall performance contractor acceptance testing IAW its test procedures. If no faults are found following functionality test, contractor shall reinsert LRF into the housing, seal and return to the Government following repair.
Alignment is not required.
1.3 Turnaround Time. Repair turnaround time shall be determined following TT&E.
Offeror shall propose delivery times in its repair proposal.
Request early delivery at no additional cost to the Government.
DISTRIBUTION A. Approved for public release: distribution unlimited.
File details come from the government source that posted it.